Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_Statement_of_Work_20_May_16.pdf | ||
| FA5000-R-0021-0001.doc | DOC document | |
| 16-R-0021_Solicitation_(Add_Site_Visit).doc | DOC document | |
| Copy_of_Gate_Pass_Request.xlsx | XLSX spreadsheet | |
| 16-R-0021 _Spray_Foam_Insulation_Solicitation.doc | DOC document | |
| Drawings_530__3MAR16.pdf | ||
| Wage_Determination.pdf | ||
| Statement_of_Work_25_Jan_16.pdf | ||
| 16-R-0021 _Spray_Foam_Insulation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5000-16-R-0021
Questions and Answers
1. Was there a mandatory walk-through?
Answer: There was a site visit conducted on 19 May 2016. It was not mandatory for interested parties to attend.
2. Is a bid bond/payment and performance bond required?
Answer: No a bid bond/payment and performance bonds are not required.
3. Are the materials spec'd out or can we submit on the urethane and Fire-coating that we normally use?
Answer: Vendors may submit the urethane and fire-coating they normally use. Installation of spray-foam insulation and the application of fire resistant coating shall meet manufacturer’s conventional construction standards.
4. Is there anything to move in able to perform our work? (Furniture, etc.)
Answer: There will be no items to move.
5. The plans have a demolition plan. Is this part of this scope?
Answer: No. The demolition plans were for Civil Engineers. It is not part of the scope for this project. All demolition work shall be completed by the Government.
6. Is any demolition required for this project?
Answer: No demolition is required.
7. When would work start?
Answer: The projected start for the project is Mid-June.
8. Will the ceiling be fireproofed?
Answer: Yes the ceiling will be fireproofed.
9. Will we need to wrap around the beams.
Answer: No.
10. Will the timeframe to complete each item be five days a piece?
Answer: We were planning for a five day timeline to complete the project. We can flex if needed.
11. Will the Mezzanines be placed before or after the insulation?
Answer: They will be placed afterwards.
12. Will we spray over the existing windows?
Answer: Yes, the windows will not be needed for the new classrooms.