New Pavement Marking Specs. section 32 17 23
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_of_Offers.pdf | ||
| attachment__2-_Airfield_Painting_Specs_FY19_Redacted.pdf | ||
| Solicitation_Amendment_FA489719BA0050001_SF_30.pdf | ||
| Current_SFS_FORM_30.pdf | ||
| IFB_Questions_and_Responses.pdf | ||
| attachment_3_-_Airfield_Drawing_6.pdf | ||
| attachment_1_-_Airfield_Painting_SOW_(1067653).pdf | ||
| attachment_2_-_Airfield_Painting_Specs_FY19.pdf | ||
| attachment_4_-_Certificate_of_Insurance.pdf | ||
| attachment_5_-_Grand_View_Gate_Information.pdf | ||
| attachment_7_-_WDOL_Highway_4_Jan_19.pdf | ||
| Solicitation_-_FA489719BA005.pdf | ||
| attachment_6_-_366_SFS_FORM_30_(Request_for_Installation_Entry_Pass).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 32 17 23
PAVEMENT MARKINGS
08/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D4061 (2013) Standard Test Method for Retroreflectance of Horizontal Coatings
ASTM D6628 (2003; R 2015) Standard Specification for Color of Pavement Marking Materials
ASTM E1710 (2011) Standard Test Method for Measurement of Retroreflective Pavement Marking Materials with CEN-Prescribed Geometry Using a Portable Retroreflectometer
ASTM E2177 (2011) Standard Test Method for Measuring the Coefficient of Retroreflected Luminance (RL) of Pavement Markings in a Standard Condition of Wetness
ASTM E2302 (2003; R 2016) Standard Test Method for Measurement of the Luminance Coefficient Under Diffuse Illumination of Pavement Marking Materials Using a Portable Reflectometer
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
FAA AC 150/5370-10 (2014; Rev G; Errata 1 2015; Errata 2 2016) Standards for Specifying Construction of Airports
U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)
MUTCD (2009) Manual on Uniform Traffic Control Devices
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-595 (Rev C; Notice 1) Colors Used in Government Procurement
FS TT-B-1325 (Rev D; Notice 1) Beads (Glass Spheres) Retro-Reflective (Metric)
SECTION 32 17 23 Page 1
FS TT-P-1952 (2015; Rev F) Paint, Traffic and Airfield Markings, Waterborne
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Application Equipment List; G Exterior Surface Preparation Material Safety Data Sheets (MSDS) for proposed materials; G Reflective media for airfields; G Waterborne Paint; G
SD-06 Test Reports
Reflective Media for Airfields; G Waterborne Paint; G Test Reports
SD-07 Certificates
Qualifications; G Reflective Media for Airfields; G Waterborne Paint; G Volatile Organic Compound, (VOC); G
SD-08 Manufacturer's Instructions
Waterborne Paint; G
1.3 QUALITY ASSURANCE
1.3.1 Regulatory Requirements
Submit certificate stating that the proposed pavement marking paint meets the Volatile Organic Compound, (VOC) regulations of the local Air Pollution Control District having jurisdiction over the geographical area in which the project is located. Submit Material Safety Data Sheets (MSDS) for each product.
1.3.2 Qualifications
Submit documentation certifying that pertinent personnel are qualified for equipment operation and handling of applicable chemicals. The documentation should include experience on five projects of similar size and scope with references for all personnel.
1.3.3 Qualifications For Airfield Marking Personnel
Submit documentation of qualifications in resume format a minimum of 14 days before pavement marking work is to be performed showing personnel who will be performing the work have experience working on airfields, operating
SECTION 32 17 23 Page 2 mobile self-powered marking, cleaning, and paint removal equipment and performing these tasks. Include with resume a list of references complete with points of contact and telephone numbers. Provide certification for pavement marking machine operator and Foreman demonstrating experience successfully completing a minimum of two airfield pavement marking projects of similar size and scope. Provide documentation demonstrating personnel have a minimum of three years of experience operating similar equipment and performing the same or similar work in similar environments, similar in size and scope of the planned project. The Contracting Officer reserves the right to require additional proof of competency or to reject proposed personnel.
1.4 DELIVERY AND STORAGE
Deliver paint materials, thermoplastic compound materials, and reflective media in original sealed containers that plainly show the designated name, specification number, batch number, color, date of manufacture, manufacturer's directions, and name of manufacturer.
Provide storage facilities at the job site, only in areas approved by the Contracting Officer, for maintaining materials at temperatures recommended by the manufacturer.
1.5 PROJECT/SITE CONDITIONS
1.5.1 Environmental Requirements
1.5.1.1 Weather Limitations for Application
Apply pavement markings to clean, dry surfaces, and unless otherwise approved, only when the air and pavement surface temperature is at least 5 degrees F above the dew point and the air and pavement temperatures are within the limits recommended by the pavement marking manufacturer. Allow pavement surfaces to dry after water has been used for cleaning or rainfall has occurred prior to striping or marking. Test the pavement surface for moisture before beginning work each day and after cleaning. Do not commence marking until the pavement is sufficiently dry and the pavement condition has been approved by the Contracting Officer. Employ the "plastic wrap method" to test the pavement for moisture as specified in paragraph TESTING FOR MOISTURE.
1.5.1.2 Weather Limitations for Removal of Pavement Markings on Roads and Parking Areas
Pavement surface must be free of snow, ice, or slush; with a surface temperature of at least 40 degrees F and rising at the beginning of operations, except those involving shot or sand blasting or grinding.
Cease operation during thunderstorms, or during rainfall, except for waterblasting and removal of previously applied chemicals. Cease waterblasting where surface water accumulation alters the effectiveness of material removal.
1.5.2 Traffic Controls
Place warning signs conforming to MUTCD near the beginning of the worksite and well ahead of the worksite for alerting approaching traffic from both directions. Place small markers along newly painted lines or freshly placed raised markers to control traffic and prevent damage to newly
SECTION 32 17 23 Page 3 painted surfaces or displacement of raised pavement markers. Mark painting equipment with large warning signs indicating slow-moving painting equipment in operation.
When traffic must be rerouted or controlled to accomplish the work, provide necessary warning signs, flag persons, and related equipment for the safe passage of vehicles.
1.5.3 Airfield Traffic Control
Coordinate performance of all work in the controlled zones of the airfield with the Contracting Officer and with the Flight Operations Officer or Airfield Manager. Neither equipment nor personnel can use any portion of the airfield without permission of these officers unless the runway is closed.
1.5.4 Airfield Radio Communication
No personnel or equipment will be allowed in the controlled zones of the airfield until radio contact has been made with the control tower and permission is granted by the control tower. A radio for this purpose is to be provided by the Government. The contractor is responsible for the radio and must reimburse the Government for repair or replacement of the radio if it is lost,damaged or destroyed. Maintain contact with the control tower at all times during work in vicinity of the airfield. Notify the control tower when work is completed and all personnel, equipment and materials have been removed from all aircraft operating surfaces.
1.5.5 Airfield Emergency Landing and Takeoff
Emergencies take precedence over all operations. Upon notification from the control tower of an emergency landing or imminent takeoff, stop all operations immediately and evacuate all personnel and equipment to an area not utilized for aircraft traffic which is at least 250 feet measured perpendicular to and away from the near edge of the runway unless otherwise authorized by the Contracting Officer. Equipment and chemicals or detergents as well as excess water must be able to clear the work area within 3 minutes.
1.5.6 Lighting
When night operations are necessary, provide all necessary lighting and equipment. Direct or shade lighting to prevent interference with aircraft, the air traffic control tower, and other base operations. Provide lighting and related equipment capable of being removed from the runway within 15 minutes of notification of an emergency. Night work must be coordinated with the Flight Operations Manager or Airfield Manager and approved in advance by the Contracting Officer. The Government reserves the right to accept or reject night work on the day following night activities by the Contractor.
PART 2 PRODUCTS
2.1 EQUIPMENT
2.1.1 Waterblasting Equipment
Use mobile waterblasting equipment capable of producing a pressurized stream of water that effectively removes paint from the pavement surface without significantly damaging the pavement. Provide equipment, tools, and
SECTION 32 17 23 Page 4 machinery which are safe and in good working order at all times.
2.1.2 Application Equipment
Submit application equipment list appropriate for the material(s) to be used. Include manufacturer's descriptive data and certification for the planned use that indicates area of coverage per pass, pressure adjustment range, tank and flow capacities, and all safety precautions required for operating and maintaining the equipment. Provide and maintain machines, tools, and equipment used in the performance of the work in satisfactory operating condition, or remove them from the work site. Provide mobile and maneuverable application equipment to the extent that straight lines can be followed and normal curves can be made in a true arc.
2.1.2.1 Paint Application Equipment
2.1.2.1.1 Hand-Operated, Push-Type Machines
Provide hand-operated push-type applicator machine of a type commonly used for application of water based paint or two-component, chemically curing paint, thermoplastic, or preformed tape, to pavement surfaces for small marking projects, such as legends and cross-walks, parking areas, or surface painted signs. Provide applicator machine equipped with the necessary tanks and spraying nozzles capable of applying paint uniformly at coverage specified. Hand operated spray guns may be used in areas where push-type machines cannot be used.
2.1.2.1.2 Self-Propelled or Mobile-Drawn Spraying Machines
Provide self-propelled or mobile-drawn spraying machine with suitable arrangements of atomizing nozzles and controls to obtain the specified results. Provide machine having a speed during application capable of applying the stripe widths indicated at the paint coverage rate specified herein and of even uniform thickness with clear-cut edges.
2.1.2.1.2.1 Airfield Marking
Provide self-propelled or mobile-drawn spraying machine for applying the paint for airfield pavements with an arrangement of atomizing nozzles capable of applying the specified line width in a single pass. Provide paint applicator with paint reservoirs or tanks of sufficient capacity and suitable gages to apply paint in accordance with requirements specified.
Equip tanks with suitable mechanical agitators. Equip spray mechanism with quick-action valves conveniently located, and include necessary pressure regulators and gages in full view and reach of the operator. Install paint strainers in paint supply lines to ensure freedom from residue and foreign matter that may cause malfunction of the spray guns. The paint applicator must be readily adaptable for attachment of a dispenser for the reflective media approved for use.
2.1.2.1.2.2 Hand Application
Provide spray guns for hand application of paint in areas where the mobile paint applicator cannot be used.
2.1.2.2 Reflective Media Dispenser
Attach the dispenser for applying the reflective media to the paint dispenser and designed to operate automatically and simultaneously with the
SECTION 32 17 23 Page 5 applicator through the same control mechanism. The bead applicator must be capable of adjustment and designed to provide uniform flow of reflective media over the full length and width of the stripe at the rate of coverage specified in paragraph APPLICATION.
2.2 MATERIALS
Use reflectorized waterborne or methacrylate paint for airfield markings.
The maximum allowable VOC content of pavement markings is 150 grams per liter. Color of markings are indicated on the drawings and must conform to ASTM D6628 for roads and parking areas and FED-STD-595 for airfields.
Provide materials conforming to the requirements specified herein.
2.2.1 Waterborne Paint
FS TT-P-1952, Type I or II.
2.2.2 Methacrylate Paint
Formulate methacrylate paint to meet the requirements of FAA AC 150/5370-10, Item P-620.2, Methacrylate.
2.2.3 Reflective Media
2.2.3.1 Reflective Media for Airfields
FS TT-B-1325, Type I, Gradation A.
PART 3 EXECUTION
3.1 EXAMINATION
3.1.1 Testing for Moisture
Test the pavement surface for moisture before beginning pavement marking after each period of rainfall, fog, high humidity, or cleaning, or when the ambient temperature has fallen below the dew point. Do not commence marking until the pavement is sufficiently dry and the pavement condition has been approved by the Contracting Officer or authorized representative.
Employ the "plastic wrap method" to test the pavement for moisture as follows: Cover the pavement with a 12 inch by 12 inch section of clear plastic wrap and seal the edges with tape. After 15 minutes, examine the plastic wrap for any visible moisture accumulation inside the plastic. Do not begin marking operations until the test can be performed with no visible moisture accumulation inside the plastic wrap. Re-test surfaces when work has been stopped due to rain.
3.1.2 Surface Preparation Demonstration
Prior to surface preparation, demonstrate the proposed procedures and equipment. Prepare areas large enough to determine adhesion of remaining coating and rate of cleaning.
3.1.3 Test Stripe Demonstration
Prior to paint application, demonstrate test stripe application within the work area using the proposed materials and equipment. Apply separate test stripes in each of the line widths and configurations required herein using
SECTION 32 17 23 Page 6 the proposed equipment. Make the test stripes long enough to determine the proper speed and operating pressures for the vehicle(s) and machinery, but not less than 50 feet long.
3.1.4 Application Rate Demonstration
During the Test Stripe Demonstration, demonstrate compliance with the application rates specified herein. Document the equipment speed and operating pressures required to meet the specified rates in each configuration of the equipment and provide a copy of the documentation to the Contracting Officer prior to proceeding with the work.
3.1.5 Retroreflective Value Demonstration
After the test stripes have cured to a "no-track" condition, demonstrate compliance with the average retroreflective values specified herein. Take a minimum of ten readings on each test stripe with a Retroreflectometer with a direct readout in millicandelas per square meter per lux (mcd/m2/lx). Conform testing per ASTM D4061, ASTM E1710, ASTM E2177, and
ASTM E2302.
3.1.6 Level of Performance Demonstration
The Contracting Officer will be present at the application demonstrations to observe the results obtained and to validate the operating parameters of the vehicle(s) and equipment. If accepted by the Contracting Officer, the test stripe is the measure of performance required for this project. Do not proceed with the work until the demonstration results are satisfactory to the Contracting Officer.
3.2 EXTERIOR SURFACE PREPARATION
Allow new pavement surfaces to cure for a period of not less than 30 days before application of marking materials. Thoroughly clean surfaces to be marked before application of the paint. Remove dust, dirt, and other granular surface deposits by sweeping, blowing with compressed air, rinsing with water, or a combination of these methods as required. Remove residual curing compounds, and other coatings adhering to the pavement by water blasting.
a. Do not use shot blasting on airfield pavements due to the potential of Foreign Object Damage (FOD) to aircraft. Scrub affected areas, where oil or grease is present on old pavements to be marked, with several applications of trisodium phosphate solution or other approved detergent or degreaser and rinse thoroughly after each application.
After cleaning oil-soaked areas, seal with shellac or primer recommended by the manufacturer to prevent bleeding through the new paint. Do not commence painting in any area until pavement surfaces are dry and clean.
3.2.1 Early Painting of Rigid Pavements
Pretreat rigid pavements that require early painting with an aqueous solution containing 3 percent phosphoric acid and 2 percent zinc chloride.
Apply the solution to the areas to be marked.
3.2.2 Early Painting of Asphalt Pavements
For asphalt pavement systems requiring painting application at less than 30
SECTION 32 17 23 Page 7 days, apply the paint and beads at half the normal application rate, followed by a second application at the normal rate after 30 days.
3.3 APPLICATION
Apply pavement markings to dry pavements only.
3.3.1 Paint
Apply paint pneumatically with approved equipment at rate of coverage specified herein. Provide guidelines and templates as necessary to control paint application. Take special precautions in marking numbers, letters, and symbols. Manually paint numbers, letters, and symbols. Sharply outline all edges of markings. The maximum drying time requirements of the paint specifications will be strictly enforced, to prevent undue softening of bitumen, and pickup, displacement, or discoloration by tires of traffic.
If there is a deficiency in drying of the markings, painting operations must cease until the cause of the slow drying is determined and corrected.
3.3.1.1 Waterborne Paint
3.3.1.1.1 Airfields
For non-reflectorized and reflectorized markings, apply paint conforming to FS TT-P-1952 Type I or II at a rate of 121 plus or minus 6 square feet per gallon.
For reflectorized markings, apply paint and glass spheres at the following rates:
TABLE IV
Bead Type Paint Type Paint Application Rate
Bead Application Rate
Type I (Gradation A)
Type I, II 121 plus or minus 6 Sq Ft/Gallon
8 plus or minus 1 lb/gallon
3.3.1.2 Methacrylate Paint
Apply paint evenly to the pavement surface at a maximum rate of 45 square feet per gallon. Apply glass spheres conforming to FS TT-B-1325 uniformly to the wet paint on airfield pavement. Use either Type I (Gradation A), Type III, or Type IV (Gradation A or B) beads. Apply Type I (Gradation A) beads at a minimum rate of 15 pounds of glass spheres per gallon. Apply Type III beads at a minimum rate of 20 pounds of glass spheres per gallon.
Apply Type IV (Gradation A or B) beads at a minimum rate of 16 pounds of glass spheres per gallon.
3.3.2 Cleanup and Waste Disposal
Keep the worksite clean and free of debris and waste from the removal and application operations. Immediately cleanup following removal operations in areas subject to aircraft traffic. Dispose of debris at approved sites.
SECTION 32 17 23 Page 8
3.4 FIELD QUALITY CONTROL
3.4.1 Sampling and Testing
As soon as the paint materials and reflective media are available for sampling, obtain by random selection from the sealed containers, four quart samples of each batch in the presence of the Contracting Officer. Two quarts will be for sampling and testing by the Contractor and two quarts will be for retention by the Government. Accomplish adequate mixing prior to sampling to ensure a uniform, representative sample. A batch is defined as that quantity of material processed by the manufacturer at one time and identified by number on the label. Clearly identify samples by designated name, specification number, batch number, project contract number, intended use, and quantity involved.
Test samples by an approved laboratory. If a sample fails to meet specification, replace the material in the area represented by the samples and retest the replacement material as specified above. Submit certified copies of the test reports, prior to the use of the materials at the jobsite. Include in the report of test results a listing of any specification requirements not verified by the test laboratory.
3.4.2 Material Inspection
Examine material at the job site to determine that it is the material referenced in the report of test results or certificate of compliance. A certificate of compliance shall be accompanied by test results substantiating conformance to the specified requirements.
3.4.3 Dimensional Tolerances
Apply all markings in the standard dimensions provide in the drawings. New markings may deviate a maximum of 10 percent larger than the standard dimension. The maximum deviation allowed when painting over an old marking is up to 20 percent larger than the standard dimensions.
3.4.4 Bond Failure Verification
Inspect newly applied markings for signs of bond failure based on visual inspection and comparison to results from Test Stripe Demonstration paragraph.
3.4.5 Reflective Media and Coating Application Verification
Use a wet film thickness gauge to measure the application of wet paint.
Use a microscope or magnifying glass to evaluate the embedment of glass beads in the paint. Verify the glass bead embedment with approximately 50 percent of the individual bead spheres embedded and 50 percent of the individual bead spheres exposed.
3.4.6 Retroreflective Markings
Collect and record readings for white and yellow retroreflective markings at the rate of one reading per 1000 linear feet. The minimum acceptable average for white markings is 200 millicandelas per square meter per lux (mcd/m2/lx) (measured with Retroreflectometer). The minimum acceptable average for yellow markings is 175 millicandelas per square meter per lux (mcd/m2/lx). Compute readings by averaging a minimum of 10 readings taken within the area at random locations. Re-mark areas not meeting the
SECTION 32 17 23 Page 9 retroreflective requirements stated above.
3.4.7 Material Bond Verification and Operations Area Cleanup for Airfields
Vacuum sweep the aircraft operating area before it is opened for aircraft operations to preclude potential foreign object damaged to aircraft engines. Visually inspect the pavement markings and the material captured by the vacuum. Verify that no significant loss of reflective media has occurred to the pavement marking due to the vacuum cleaning.
-- End of Section --
SECTION 32 17 23 Page 10
| 32 17 23 - PAVEMENT MARKINGS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY ASSURANCE |
| 1.3.1 Regulatory Requirements |
| 1.3.2 Qualifications |
| 1.3.3 Qualifications For Airfield Marking Personnel |
| 1.4 DELIVERY AND STORAGE |
| 1.5 PROJECT/SITE CONDITIONS |
| 1.5.1 Environmental Requirements |
| 1.5.1.1 Weather Limitations for Application |
| 1.5.1.2 Weather Limitations for Removal of Pavement Markings on Roads and |
| 1.5.2 Traffic Controls |
| 1.5.3 Airfield Traffic Control |
| 1.5.4 Airfield Radio Communication |
| 1.5.5 Airfield Emergency Landing and Takeoff |
| 1.5.6 Lighting |
| PART 2 PRODUCTS |
| 2.1 EQUIPMENT |
| 2.1.1 Waterblasting Equipment |
| 2.1.2 Application Equipment |
| 2.1.2.1 Paint Application Equipment |
| 2.1.2.1.1 Hand-Operated, Push-Type Machines |
| 2.1.2.1.2 Self-Propelled or Mobile-Drawn Spraying Machines |
| 2.1.2.1.2.1 Airfield Marking |
| 2.1.2.1.2.2 Hand Application |
2.1.2.2 Reflective Media Dispenser
| 2.2 MATERIALS |
| 2.2.1 Waterborne Paint |
| 2.2.2 Methacrylate Paint |
| 2.2.3 Reflective Media |
| 2.2.3.1 Reflective Media for Airfields |
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.1.1 Testing for Moisture |
| 3.1.2 Surface Preparation Demonstration |
| 3.1.3 Test Stripe Demonstration |
| 3.1.4 Application Rate Demonstration |
| 3.1.5 Retroreflective Value Demonstration |
| 3.1.6 Level of Performance Demonstration |
| 3.2 EXTERIOR SURFACE PREPARATION |
| 3.2.1 Early Painting of Rigid Pavements |
| 3.2.2 Early Painting of Asphalt Pavements |
| 3.3 APPLICATION |
| 3.3.1 Paint |
| 3.3.1.1 Waterborne Paint |
| 3.3.1.1.1 Airfields |
3.3.1.2 Methacrylate Paint
3.3.2 Cleanup and Waste Disposal
| 3.4 FIELD QUALITY CONTROL |
| 3.4.1 Sampling and Testing |
| 3.4.2 Material Inspection |
| 3.4.3 Dimensional Tolerances |
| 3.4.4 Bond Failure Verification |
| 3.4.5 Reflective Media and Coating Application Verification |
| 3.4.6 Retroreflective Markings |
| 3.4.7 Material Bond Verification and Operations Area Cleanup for Airfields |