Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum_1_Signed.pdf | ||
| Amendment_1.pdf | ||
| FA4897-17-B-0003.pdf | ||
| 4. Wage Determination.pdf | ||
| 7. Certificate of Insurance.pdf | ||
| 6. Grand View Gate Information.pdf | ||
| 2. Drawings | — | |
| 5. Determination of Responsibility.pdf | ||
| 3. Specifications - QYZH 140001 Paint Building Interior Multiple Facilities.doc.pdf | ||
| 1. SOW - QYZH 140001 Paint Building Interior Multiple Facilities.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Painting Building Interiors FA4897-17-B-0003 16 August 2017
* In the determination of responsibility you have requested a copy of the most recent financial statement prepare by a certified public accountant (with notes) will this be used to evaluate the ability of the contractor to complete the work?
Answer: No, if one or all of the items are missing from the determination of responsibility in your bid it will not use to evaluate the ability of the contractor to complete the work. The information provided will be used prior to award to determine each contractors responsibility per the requirements in FAR
Part 9. Requesting this information early helps expedite the award process.
* Will a recap of bidders be provided
Answer: Yes, once bids are received after the close of bids a bid opening will be schedules and held where bids are opened and read. Then the companies name and total bid value will be posted to FBO as public information.
* Will the work that will be performed near or on the flight line require flight line badging and training (Control Tower, Aircraft Hangar)?
Answer: No, line badge badges will not be required, but esscorts will be provided while working in the
Control Tower.
* Is this all INTERIOR or EXTERIOR or a mix? In Specifications ,Part 2 states all exterior is shown with a short blurb about Interior. The SOW does state INTERIOR.
Answer: Only exterior’s of dorm stairwells are to be painted
* Are the specified products NO SUB? (NOTE: I could not find specified products for the Interior, only the above statement)
Answer: See section 09900 Para 3.10 of specs
* Do all doors and Jams paint on the side of the areas we are working in, Answer: If there is paint on one side of a door, the other side will be painted to. Therefore all doors that are to be painted will be painted 360 degrees. Note: the doors in all of the dormitory buildings to the residents rooms are not to be painted at all, but the common area doors to everything else will be for those buildings.
* Is it correct to assume the doors and jams leading into the dorm rooms are not to be painted but any public doors in those areas are to be painted both sides?
Answer: Yes, this is a correct statement.
* Can you tell us what existing product is on the dog kennel floors and walls at this time?
Answer: The Government is not aware of what type of coating is currently on the dog kennel floors and walls.
* Are we to include in our pricing to replace the cove base in the dining and kitchen areas
Answer: No, the cove base in the dining and kitchen area will not be a part of this project.