1. SOW - QYZH 140001 Paint Building Interior Multiple Facilities.pdf
PDF 160 KB Posted
- Attached to
- Painting Buildings Interior Federal contract opportunity
- Solicitation number
- fa4897-17-B-0003
About this file
SoW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum_1_Signed.pdf | ||
| Submitted_Q&A.pdf | ||
| Amendment_1.pdf | ||
| 7. Certificate of Insurance.pdf | ||
| 6. Grand View Gate Information.pdf | ||
| 2. Drawings | — | |
| 5. Determination of Responsibility.pdf | ||
| 3. Specifications - QYZH 140001 Paint Building Interior Multiple Facilities.doc.pdf | ||
| FA4897-17-B-0003.pdf | ||
| 4. Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Paint Building Interior, Multiple Facilities
2 May 2017
Project: QYZH 14-0001
Facilities: 200, 2201, 2316, 2371, Dormitories (2312, 2314, 2412, 2416, 2422), 3600
Project Manager: Mr. Steve Gibbs
Construction Inspector: Mr. Chuck Kalina
Period of Performance: 240 Days
Government Furnished Material/Equipment: None
General
1. Overview
The project involves painting interior walls in Facilities 2316 (Dining Facility), 2371 (Fitness Center), 3600 (Control Tower), 2201 (Military Working Dog Kennels), 200 (Aircraft Hangar) and
2312/2314/2412/2416/2422 (Dormitories). Total area of walls is approximately 143,000 square feet.
2. Requirements
a. The Contractor is required to adhere to all standards and specifications listed in the contract documents.
b. Coordinate all work in advance with the construction inspector, project manager, and
Contracting Officer.
Project Scope
Contractor shall furnish all labor, tools, materials, transportation, equipment, supervision and personnel to perform and complete the prepping, prime and painting of identified walls, trim, doors, ceilings and stairwell floors and railings. Facilities (see drawings for identified areas and estimated quantities, to be validated by contractors during site visits and bidding process):
1. 2316 (Dining Facility): Blacked out areas on drawing (“MHAFB_2316_wall-area”) are not included in contract. Work shall be phased in coordination with user so dining operation can remain functioning during contract execution. User will move equipment/shelves/stoves etc.
2. 2371 (Fitness Center): Blacked out areas on drawing (“MHAFB_2371_wall-area”) are not included in contract. Work shall be phased in coordination with user so facility use will have minimum disruption during contract execution. User will move weight/exercise equipment etc.
3. 3600 (Control Tower): Drawings (“MHAFB_BLDG 3600_26 7THFLOOR”) show areas included in contract with identified quantities on 2nd, 3rd, and 7th floor. Access to this facility is more restrictive (and will require user escorts) than other facilities due to the flying operations function.
4. 2201 (Military Working Dog Kennels): Drawing (“MHAFB_2201_Model (1)”) shows area included in contract with identified quantities in kennel area. Work shall be coordinated with user so dogs can be relocated during contract execution.
5. 200 (Aircraft Hangar): Drawings (“MHAFB_200_Stairway_wall-areas”) show areas included in contract with identified quantities in stairway areas. Stair well floor shall be anti-skid/slip paint. Work includes floors, walls, ceilings and stair railings.
6. 2312/2314/2412/2416/2422 (Dormitories): Drawings (“MHAFB_2312_1-2-3Floors”, “MHAFB_2314_1-2-3Floors”, “MHAFB_2412_1-2-3Floors”, “MHAFB_2416_1-2-3Floors”, and
“MHAFB_2422_1-2-3Floors”) show common areas included in contract with identified quantities
(dormitory rooms are not included). Stair well floors shall be anti-skid/slip paint (stair wells in Dorm
2422 are not in this contract). Work includes floors, walls, and stair railings.
Miscellaneous Requirements
1. Provide product submittals as applicable for review by the Contracting Officer Representative.
Paint colors to be coordinated with users and base architect.
2. The Contracting Officer will schedule a pre-construction meeting with the appropriate personnel before issuance of the notice to proceed (NTP).
Attachments
1. Drawings
2. Specifications
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\END STATEMENT OF WORK////////////////////////////////////////