Attachment 8 - RFI Answers.pdf

PDF 74 KB Posted

Attached to
Repair Alert Aircraft Apron Federal contract opportunity
Solicitation number
FA487720R0014
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains responses to questions regarding solicitation number FA487720R0014 for the repair of an alert aircraft apron at Davis-Monthan Air Force Base. The responses provide details on work hours, gate access and security, as-built drawings, the scope of concrete and utility work, batch plant and construction waiver requirements, sawcutting limits near the mechanical yard, and cold joint specifications. Contractors were provided clarification on removal limits in relation to the CMU wall, existing pavement and utility structures, use of gate F-27 and potential exclusive use of gate 29B with concrete haul trucks, as well as the lack of interior mechanical yard work and as-built drawing availability beyond the included utility map.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Alert Aircraft Apron, newest first.
File Type Posted
Site Visit Sign in.xlsx XLSX spreadsheet
Solicitation Amendment FA487720R00140001 SF 30.pdf PDF
Attachment 10 - Site Plan.pdf PDF
Attachment 9 - Project Drawings.pdf PDF
Solicitation - FA487720R0014.pdf PDF
Attachment 6 - Past Performance Questionnaire.docx DOCX document
Attachment 4 - WD AZ20200008.pdf PDF
Attachment 3 - Section M.pdf PDF
Attachment 2 - Section L.pdf PDF
Attachment 7 - AF Form 3052 (Blank).xlsx XLSX spreadsheet
Attachment 1 - Template of Contractor EAL.xls XLS spreadsheet
Attachment 5 - Project Specifications.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Alert Apron Solicitation RFI’s

1. Will their be a limit placed on working hours?

Gov’t Response: Per Section 01011 paragraph 1.6.1.3. “All construction work shall be accomplished between the hours of 0600—1500, Monday through Friday, excluding federal holidays, unless otherwise approved in writing by the CO. If the contractor desires to work after 1500, weekends, or during federal holidays, the contractor shall submit the request to the Contracting Officer at least 2 days in advance.

Each request will be considered on a case-by-case basis.”

Deviations to these hours shall be submitted to the Contracting Officer at least 2 days in advance. Each request will be considered on a case-by-case basis.

2. Will gate F-27 be available for contractor’s exclusive use, and if so will it be the contractors responsibility to post a guard at that gate?

Gov’t Response: Gate F-27 will be manned by SFS. There is a chance that this gate could be used exclusively by the Contractors, however the area is still in a restricted area and the restrictive requirements will still apply.

3. Will the South Swan Gate 29 Bravo be available for use as a haul route for construction truck traffic, and if so will the contractor be responsible to post a gate guard, and will the guard need any special certification?

Gov’t Response: The government will try to request the use of South Gate (29B) for the use of the concrete haul trucks only during the gate operating hours (0600 – 0900 & 1330 – 1800). This approval is not guaranteed.

4. Will as-builts be provided for the area so we can determine the existing pavement section as well as any utility locations?

Gov’t Response: Existing as-built drawings of this area does not exist however attached is a utility map of the area.

5. Will the Existing rolling gate track and surrounding concrete stay in place as is?

Gov’t Response: Yes, the existing rolling gate, track, and concrete foundation slab associated to the gate will remain in place as is.

6. Will the tie in point along the hangers be the existing joint approximately 2’ north of the doors?

Gov’t Response: Yes, the tie in point will be up to the hangar foundation, which is the joint just before the doors.

7. Is the removal limits of remove and replace to be along the outside of the existing block wall enclosure?

Gov’t Response: The removal limits will be as close to the mechanical yard block wall without compromising the block wall.

8. Is there no remove and replace concrete to be done inside of the existing block wall enclosure?

Gov’t Response: There will be no work inside of the mechanical yard.

9. Will the existing concrete around where the utilities come out of the ground and go into the building be left in place?

Gov’t Response: The existing concrete will demolished up to the building foundation to create a single joint along that side.

10. Please provide as-built drawings for the apron and any underground utilities within the area.

Gov’t Response: Existing as-built drawings of this area does not exist however attached is a utility map of the area.

11. Would a portable batch plant be allowed on base as long as the mix design followed the UFGS criteria?

Gov’t Response: A batch plant would be allowed so long as all of the UFGS criteria is met, to include but not limited to certifications, equipment, as well as testing and inspecting.

12. Will a construction free-zone waiver be viable as long as mission requirements aren’t hindered?

Gov’t Response: Yes, a construction free zone waiver is viable, however the entire area is still within a restricted zone and some restrictions cannot be waived.

13. How close to the existing CMU mechanical/electrical yard will the contractor be required to sawcut/replace existing concrete? (ex. 1-ft / 1.5-ft?)

Gov’t Response: The removal limits will be as close to the mechanical yard block wall without compromising the block wall.

14. There were some recent concrete cores seen while on the site-walk. Can the information on those be provided?

Gov’t Response: No the date and reports of those cores is unknown.

15. What will be the process for cold joints in the concrete?

Gov’t Response: Cold joints are considered construction joints follow UFC and UFGS requirements for this type of joint, to include load transfer between slabs.

16. RFP reference: 01011, 1.6.3.2 RFI: Says to “see sheet 2 of the attached plans”. There aren’t any attached plans that we saw in the beta.sam.gov website. Can you please put these referenced plans on the beta.sam.gov website?

Gov’t Response: Drawing provided.