Attachment 7 - AF Form 3052 (Blank).xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Repair Alert Aircraft Apron Federal contract opportunity
Solicitation number
FA487720R0014
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a construction cost estimate breakdown template and related federal contract opportunity solicitation for repair of an alert aircraft apron at Davis-Monthan Air Force Base. The cost estimate template provides line items for materials, labor, overhead, profit, taxes, and bonds for repairs including removal and replacement of concrete and asphalt pavements, aggregate base courses, joint repair, dowels, and pavement markings. The solicitation seeks design, plans, specifications, and completion of the repair work outlined in the cost estimate template. The required repairs aim to restore the alert aircraft apron and includes removal and replacement of concrete, asphalt, base courses, and application of new pavement markings. Responses to the solicitation are due on the date specified. The Air Force is the contracting agency for this opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Alert Aircraft Apron, newest first.
File Type Posted
Site Visit Sign in.xlsx XLSX spreadsheet
Attachment 9 - Project Drawings.pdf PDF
Attachment 8 - RFI Answers.pdf PDF
Solicitation Amendment FA487720R00140001 SF 30.pdf PDF
Attachment 10 - Site Plan.pdf PDF
Attachment 2 - Section L.pdf PDF
Attachment 3 - Section M.pdf PDF
Solicitation - FA487720R0014.pdf PDF
Attachment 6 - Past Performance Questionnaire.docx DOCX document
Attachment 4 - WD AZ20200008.pdf PDF
Attachment 1 - Template of Contractor EAL.xls XLS spreadsheet
Attachment 5 - Project Specifications.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Form 3052

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)Repair Alert Aircraft ApronPROPOSED TOTAL CONTRACT PRICE0
PURCHASE REQUEST NUMBERPROJECT NUMBERFBNV190022WORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL DIVISION 01 GENERAL CONDITIONS0.000.000.000.000.00
2SUBTOTAL DIVISION 02 EXISTING CONDITIONS0.000.000.000.000.00
3SUBTOTAL DIVISION 03 CONCRETE0.000.000.000.000.00
4SUBTOTAL DIVISION 31 EARTHWORK0.000.000.000.000.00
5SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS0.000.000.000.000.00
LINE TOTALS OVERALL0.000.000.000.00
OVERHEAD TOTAL OVERALL (____%)0.00
SUBTOTAL OVERALL W/ OVERHEAD0.00
PROFIT TOTAL OVERALL (____%)0.00
SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT0.00
TAX OVERALL ____%0.00
BOND OVERALL (____%)0.00
TOTAL OVERALL PROJECT PRICE0.00
DATE:FIRM NAME:
TITLE:BY:
DIVISION 01 GENERAL CONDITIONS
1DesignLS
2Swan Gate Search RequirementsLS
3Project ManagerWk
4SuperintendentWk
5PermitsLS
6Concrete compressive testEA
7Testing, Density & ClassificationEA
8Testing, Soil density, nuclear method, ASTM D 2922EA
9Testing, Moisture Content, ASTM D 2216EA
10Testing, Proctor Compaction, 6" Modified Mold, ASTM D 698EA
11Testing Technician for earthworkEA
12Testing Technician for concreteEA
13Water TruckWk
14Mobilization/Demobilization - Equipment placed in rear of pickup truckEA
15Mobilization/Demobilization - Equipment hauled on 3-ton capacity towed trailerEA
16Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailerEA
17Mobilization/Demobilization - Equipment hauled on 40-ton capacity towed trailerEA
18Mobilization/Demobilization - Equipment hauled on 50-ton capacity towed trailerEA
19Portable barricadeEA
20Surveyor, 2 person crewDay
21Surveyor Stakes, 2" x 2" x 18" longC
22Jobsite cleanupLS

SUBTOTAL DIVISION 01 GENERAL CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 02 EXISTING CONDITIONS
1Remove asphaltSY
2Remove concreteCY
3Dumpster (1 dump/week)Wk
4Loading & Trucking RubbishCY

SUBTOTAL DIVISION 02 EXISTING CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 03 CONCRETE
1Concrete FormsSFCA
2Sawcut new control jointsLF
3Sawcut new control joints, reservoirLF
4Air blast joint to cleanLF
5Joint backer rodsLF
6Joint sealantLF
7Dowel SleevesEa
8Epoxy, dowelsEa
9Sawcut concreteLF
10Drill dowelsEa

SUBTOTAL DIVISION 03 CONCRETE 0.00 0.00 0.00 0.00 0.00

DIVISION 31 EARTHWORK
1Finish GradeSY
2Excavating, excavatorBCY
3Excavating, front end loaderBCY
4Spread materialLCY
5Hauling, 12 CY Truck, 30 MPH avg, cycle 6 milesLCY
6Compaction (vibrating roller)ECY
7Compaction (vibrating plate)ECY

SUBTOTAL DIVISION 31 EARTHWORK 0.00 0.00 0.00 0.00 0.00

DIVISION 32 EXTERIOR IMPROVEMENTS
1Aggregate base course, compactedSY
2Asphalt patchSY
3Tack coatSY
4Portland cement concrete, 650 psi flexuralSY
5DowelsEa
6Pavement markings, with beadsLF
7Airport pavement paint mob/demobEa

SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS 0.00 0.00 0.00 0.00 0.00