Attachment 7 - AF Form 3052 (Blank).xlsx

XLSX spreadsheet 49 KB Posted

Attached to
Demolition of Multiple Facilities Federal contract opportunity
Solicitation number
FA487720Q0047
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Demolition of Multiple Facilities, newest first.
File Type Posted
Bldg 04351-001.PDF PDF
Bldg 4351 1988-02 Asbestos Survey.pdf PDF
Bldg 04354-001-001 - Kiddie Pool.PDF PDF
Bldg 4351 1994-11 Asbestos Survey.pdf PDF
Bldg 4350 1999-12 Asbestos Survey.pdf PDF
Bldg 4352 1988-02 Asbestos Survey.pdf PDF
Bldg 04350-001-001 - Drip system.PDF PDF
Contractor Environmental Guide_2019.pdf PDF
Bldg 04351-007.PDF PDF
Solicitation Amendment FA487720R00040005 SF 30.pdf PDF
Bldg 4000 1998-10-23 Asbestos Survey.pdf PDF
Bldg 4000 2006-05 Asbestos Survey.pdf PDF
Bldg 04000-0005.pdf PDF
Bldg 04351-006.PDF PDF
Bldg 4351 1999-07 Asbestos Survey.pdf PDF
Bldg 4000 1999-02 Asbestos Survey.pdf PDF
Bldg 04353-001-001.PDF PDF
Bldg 4351 2001-02 Asbestos Survey.pdf PDF
Bldg 4000 1998-10 Lead Based Paint Survey.pdf PDF
Scanned Map Survey Bldg 04351.PDF PDF
Bldg 4000 2006-12 Mold Survey.pdf PDF
Bldg 4000 1987-07 Asbestos Survey.pdf PDF
Demo Solicitation RFIs & Responses.pdf PDF
Bldg 4000 2001-04 Asbestos Survey.pdf PDF
Bldg 4353 2000-06 Lead Based Paint Survey.pdf PDF
Bldg 4351 2001-06 Asbestos Shipment.pdf PDF
Bldg 4000 1996-09 Asbestos Survey.pdf PDF
Bldg 4000 2009-12 Asbestos Shipment.pdf PDF
Bldg 4350 1988-01 Asbestos Survey.pdf PDF
Bldg 4000 1998-10-07 Asbestos Survey.pdf PDF
Bldg 04000-0012.pdf PDF
Bldg 4000 1996-01 Asbestos Survey.pdf PDF
Solicitation Amendment FA487720R00040004 SF 30.pdf PDF
Scanned Map Survey Bldg 04000.pdf PDF
Solicitation Amendment FA487720R00040003 SF 30.pdf PDF
Solicitation Amendment FA487720R00040002 SF 30.pdf PDF
Attachment 6 - Past Performance Questionnaire 7 Jan 20.docx DOCX document
Solicitation Amendment FA487720R00040001 SF 30.pdf PDF
Attachment 5 - Specifications (18 Dec 19).pdf PDF
Attachment 4 - WD AZ20190032 11012019.pdf PDF
Attachment 1 - Template of Contractor EAL.xls XLS spreadsheet
Attachment 6 - Past Performance Questionaire.docx DOCX document
Attachment 2 - Section L (20 Dec 19).pdf PDF
Solicitation - FA487720R0004.pdf PDF
Attachment 3 - Section M (17 Dec 19).pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Form 3052 (Blank)

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)Demo Multt FacilitiesPROPOSED TOTAL CONTRACT PRICE0
PURCHASE REQUEST NUMBERPROJECT NUMBERFBNV180013WORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL DIVISION 01 GENERAL CONDITIONS0.000.000.000.000.00
2SUBTOTAL DIVISION 02 EXISTING CONDITIONS0.000.000.000.000.00
3SUBTOTAL DIVISION 03 CONCRETE0.000.000.000.000.00
4SUBTOTAL DIVISION 04 MASONRY0.000.000.000.000.00
5SUBTOTAL DIVISION 05 METALS0.000.000.000.000.00
6SUBTOTAL DIVISION 08 OPENINGS0.000.000.000.000.00
7SUBTOTAL DIVISION 09 FINISHES0.000.000.000.000.00
8SUBTOTAL DIVISION 11 EQUIPMENT0.000.000.000.000.00
9SUBTOTAL DIVISION 13 SPECIAL CONSTRUCTION0.000.000.000.000.00
10SUBTOTAL DIVISION 22 PLUMBING0.000.000.000.000.00
11SUBTOTAL DIVISION 23 HVAC0.000.000.000.000.00
12SUBTOTAL DIVISION 26 ELECTRICAL0.000.000.000.000.00
13SUBTOTAL DIVISION 31 EARTHWORK0.000.000.000.000.00
14SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS0.000.000.000.000.00
15SUBTOTAL DIVISION 33 UTILITIES0.000.000.000.000.00
LINE TOTAL0.000.000.000.000.00
OVERHEAD (___%)0.00
SUBTOTAL W/ OVERHEAD0.00
PROFIT (___%)0.00
SUBTOTAL W/ OVERHEAD AND PROFIT0.00
TAX ___% (____% of ___%)0.00
BOND (___%)0.00
TOTAL PROJECT PRICE0.00
DATE:FIRM NAME:
TITLE:BY:
DIVISION 01 GENERAL CONDITIONS - DORM FACILTIES
1DesignLS
2Swan Gate Search RequirementsLS
3Project ManagerWk
4SuperintendentWk
5Project ScheduleEA
6PermitsLS
7Soil density, nuclear method, ASTM D 2922EA
8Proctor Compaction, 6" Modified Mold, ASTM D 698EA
9Testing Technician for earthworkEA
10CraneDay
11Moilization/Demobilization - Small EquipmentEA
12Mobilization/Demobilization - Equipment hauled on 3-ton capacity towed trailerEA
13Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailerEA
14Mobilization/Demobilization - Equipment hauled on 40-ton capacity towed trailerEA
15Mobilization/Demobilization - Equipment hauled on 50-ton capacity towed trailerEA
16Portable barricadeEA
17Water TruckWk
18Temporary FenceLF
19Jobsite cleanupLS

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 01 GENERAL CONDITIONS - POOL FACILITIES
1DesignLS
2Swan Gate Search RequirementsLS
3Project ManagerWk
4SuperintendentWk
5Project ScheduleEA
6PermitsLS
7Asphalt compressive strength testingEA
8Asphalt density testingEA
9Soil density, nuclear method, ASTM D 2922EA
10Proctor Compaction, 6" Modified Mold, ASTM D 698EA
11Testing Technician for earthworkEA
12Testing Technician for asphaltEA
13Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailerEA
14Portable barricadeEA
15Water TruckWk
16Temporary FenceLF
17Jobsite cleanupLS
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 01 GENERAL CONDITIONS0.000.000.000.000.00
DIVISION 02 EXISTING CONDITIONS - DORM FACILTIES
1Pothole Existing UtilitiesCY
2Remove Concrete, 6" ThickSY
3Remove SidewalksSY
4Remove Water LineLF
5Remove Chilled Water LinesLF
6Remove Sewer LineLF
7Remove Natural Gas LineLF
8Remove Cross ArmsEA
9Remove FacilitiesCF
10Remove Foundation PadSF
11Remove Facility FootersLF
12Dumpster (1 dump/week)Week
13Loading & Trucking RubbishCY
14Dump charges (Construction materials)Ton
15Remove InteriorSF Flr
16Asbestos TestingEA
17Lead Paint TestingEA

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 02 EXISTING CONDITIONS - POOL FACILTIES
1Pothole Existing UtilitiesCY
2Remove bituminous drivewaysSY
3Remove Concrete, 6" ThickSY
4Remove Light Pole BasesCY
5Remove Storm Sewer LineLF
6Remove SidewalksSY
7Remove Water LineLF
8Remove Chilled Water LinesLF
9Remove Sewer LineLF
10Remove Natural Gas LineLF
11Remove Chainlink FenceLF
12Remove Brick AccentsSF
13Remove FacilitiesCF
14Remove Foundation PadSF
15Remove Facility FootersLF
16Dumpster (1 dump/week)Week
17Loading & Trucking RubbishCY
18Dump charges (Construction materials)Ton
19Remove InteriorSF Flr
20Asbestos TestingEA
21Lead Paint TestingEA
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 02 EXISTING CONDITIONS0.000.000.000.000.00
DIVISION 03 CONCRETE - DORM FACILTIES
1Sawcut ConcreteLF

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 03 CONCRETE - POOL FACILTIES
1Remove PoolsCY
2Sawcut ConcreteLF
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 03 CONCRETE0.000.000.000.000.00
DIVISION 04 MASONRY - DORM FACILTIES
1

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 04 MASONRY - POOL FACILTIES
1Remove Masonry WallsSF
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 04 MASONRY0.000.000.000.000.00
DIVISION 05 METALS - DORM FACILTIES
1Remove Exterior Stair SupportsEA
2Remove Exterior Stair FlooringSF
3Remove Guard Rails, EA FloorLF

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 05 METALS - POOL FACILTIES
1Remove Shade Structure SupportsEA
2Remove HandrailsLF
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 05 METALS0.000.000.000.000.00
DIVISION 08 OPENINGS - DORM FACILTIES
1Exterior Door, SingleEA
2Exterior Door, DoubleEA
3Interior Door, SingleEA
4Interior Door, DoubleEA
5Remove Small Windows, GlassEAClabERROR:#N/AERROR:#N/A0.04
6Remove Large Windows, GlassEAClabERROR:#N/AERROR:#N/A0.053

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 08 OPENINGS - POOL FACILTIES
1Exterior Door, SingleEA
2Exterior Door, DoubleEA
3Interior Door, SingleEA
4Remove Door HardwareEA
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 08 OPENINGS0.000.000.000.000.00
DIVISION 09 FINISHES - DORM FACILTIES
1Recycle CarpetSF

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 09 FINISHES - POOL FACILTIES
1
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 09 FINISHES0.000.000.000.000.00
DIVISION 11 EQUIPMENT - DORM FACILTIES
1Remove Exercise EquipmentEA

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 11 EQUIPMENT - POOL FACILTIES
1Remove Laundry EquipmentEA
2Remove Pool PumpEA
3Remove BleachersEA
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 11 EQUIPMENT0.000.000.000.000.00
DIVISION 13 SPECIAL CONSTRUCTION - DORM FACILTIES
1

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 13 SPECIAL CONSTRUCTION - POOL FACILTIES
1Remove LaddersEA
2Remove Lifeguard ChairsEA
3Remove SlideEA
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 13 SPECIAL CONSTRUCTION0.000.000.000.000.00
DIVISION 22 PLUMBING - DORM FACILTIES
1Remove Backflow PreventorEA
2Remove CleanoutsEA
3Remove Drinking FountainEA
4Remove Water TankEA
5Remove Water HeaterEA

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 22 PLUMBING - POOL FACILTIES
1Remove Backflow Preventor, Irrigation LineEA
2Remove Backflow Preventor, Main LineEA
3Remove CleanoutsEA
4Remove Pool PumpEA
5Remove Water TankEA
6Remove Water HeaterEA
7Remove Drinking FountainEA
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 22 PLUMBING0.000.000.000.000.00
DIVISION 23 HVAC - DORM FACILTIES
1Remove Evaporative CoolerEA
2Remove Air SeparatorEA
3Remove PumpsEA

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 23 HVAC - POOL FACILTIES
1Remove Evaporative CoolerEA
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 23 HVAC0.000.000.000.000.00
DIVISION 26 ELECTRICAL - DORM FACILTIES
1Remove Conduit on PoleLF
2Remove Underground ConduitLF
3Remove WireCLF
4Remove Ground RodsEA
5Remove Ground WireLF
6Remove Main LugsEA
7Remove Main Circuit BreakerEA
8Remove Panelboard, 50 AEA
9Remove Panelboard, 250 AEA
10Remove Exterior LightsEA
11Remove Exit LightingEA
12Remove Interior LightsEA

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 26 ELECTRICAL -POOL FACILTIES
1Remove Underground ConduitLF
2Remove Safety SwitchEA
3Remove TransformerEA
4Remove WireCLF
5Remove Ground RodsEA
6Remove Ground WireLF
7Remove Main LugsEA
8Remove Main Circuit BreakerEA
9Remove Exterior Area LightsEA
10Remove Exterior LightsEA
11Remove Exit LightingEA
12Remove Interior LightsEA
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 26 ELECTRICAL0.000.000.000.000.00
DIVISION 31 EARTHWORK - DORM FACILTIES
1Strip and Stockpile Existing LandscapeCY
2Rough Grade SiteEA
3Excavate Around FoundationsBCY
4Backfill Foundation TrenchLCY
5Tench, Backfill, and Compact UtilitiesLF
6Backfill SiteLCY
7FillTon
8Place Landscape Material BackBCY
9Material DeliveryTon
10Hauling, 4 mi Cycle, 30 MPH avgLCY
11Compact Backfill AreasECY

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 31 EARTHWORK - POOL FACILTIES
1Strip and Stockpile Existing LandscapeCY
2Rough Grade SiteEA
3Fine Grade for PavementSY
4Excavate Around FoundationsBCY
5Backfill Foundation TrenchLCY
6Tench, Backfill, and Compact UtilitiesLF
7Backfill SiteLCY
8FillTon
9Place Landscape Material BackBCY
10Material DeliveryTon
11Hauling, 4 mi Cycle, 30 MPH avgLCY
12Compact Backfill AreasECY
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 31 EARTHWORK0.000.000.000.000.00
DIVISION 32 EXTERIOR IMPROVEMENTS - DORM FACILTIES
1Seed MixMSF
2Remove Trees in way of DemoEA

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 32 EXTERIOR IMPROVEMENTS - POOL FACILTIES
1Asphalt paving, 3" thickSY
2Seed MixMSF
3Remove Trees in way of DemoEA
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS0.000.000.000.000.00
DIVISION 33 UTILITIES - DORM FACILTIES
1Thrust Block for Capped Water LinesEA

SUBTOTAL THIS PAGE 0.00 0.00 0.00 0.00 0.00

DIVISION 33 UTILITIES - POOL FACILTIES
1Thrust Block for Capped Water LinesEA
SUBTOTAL THIS PAGE0.000.000.000.000.00
SUBTOTAL DIVISION 33 UTILITIES0.000.000.000.000.00

AF Form 3052 (Computer Generated) *FOR OFFICIAL USE ONLY* PAGE &P OF &N

File details come from the government source that posted it. Updated .