RFQ_SOW_Base_Wide_Carpet_&_Flooring.pdf
PDF 3 MB Posted
- Attached to
- Maintain Flooring, Basewide Federal contract opportunity
- Solicitation number
- FA4819-17-Q-3095
About this file
Statement of Work for Maintain Flooring, Base Wide
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Flooring-Vendors_Combined_Questions-Answers.pdf | ||
| RFQ_Maintain_Flooring_Base_Wide.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Maintain Flooring, Base Wide
XLWU 15-2053D
Tyndall Air Force Base, Florida
21 July 2017
1.0. SCOPE: Contractor shall furnish all labor, materials, transportation, tools, equipment, and supervision needed to replace flooring at Buildings listed below on Tyndall Air Force Base, Florida.
2.0. DESCRIPTION OF WORK:
2.1. Building 431
2.1.1. Remove existing carpet and transition strips. See attached drawing.
2.1.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.1.3. Install new Interface, Cubic, Horizontal carpet.
2.1.4. Install new Burke Flooring, #607, Cranberry transition strips at storage room, both ends of hallway and projection room door.
2.1.5. Large amount of equipment in room 104 and bolted down seating in room 101 to be moved as needed to install new carpet.
2.2. Building 505
2.2.1. Remove existing carpet, VCT in Comm. closet, cove base and transition strips. See attached drawing.
2.2.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new LVT.
2.2.3. Install new Armstrong, Bravo Putty 12 x 24, LVT.
2.2.4. Install new Burke Flooring, #701, Black, cove base.
2.3. Building 1255
2.3.1. Remove 2 layers of existing carpet, cove base and transition strips.
See attached drawing.
2.3.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.3.3. Install new Interface, Cubic, Horizontal carpet.
2.3.4. Install new Burke Flooring, #597, Mocha cove base and transition strips at restrooms and double entrance doors.
2.3.5. Personal lockers in room 1 to be moved as needed to install new carpet.
2.4. Building 421
2.4.1. Remove carpet in all areas, cove base in room 403B and transition strips at rooms 208, 212 and 214. See attached drawing.
2.4.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.4.3. Install new Interface, Cubic, 6392 dimension carpet.
2.4.4. Install new Johnsonite, 92-Blue Lagoon, cove base and transition strips.
2.5. Building 1470
2.5.1. Remove existing carpet to bottom of riser at start of repair area on pulpit and at the balcony. See attached drawings.
2.5.1.1. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.5.1.2. Install new Milliken, Colorweave, Colored Crystal, 200
Ruby Gem to match existing.
2.5.1.3. Move large and small organ, piano, table, chairs, pews at balcony etc. as needed to replace carpet.
2.5.1.4. All risers and step shall have carpet.
2.5.2. Repair carpet in Sanctuary. See attached drawing.
2.5.2.1. Replace 12 stained, torn carpet tiles with new tiles.
2.5.2.2. Repair loose tiles and joints which are buckling at
approximately 30% of the area.
2.6. Building 703, Chapel 1 – Main Level, Balcony, stairs and steps
2.6.1. Remove existing carpet and transition strips. See attached drawing.
2.6.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.6.3. Install new patcraft, Scholastic II, Tuition 00471 carpet.
2.6.4. Install new Burke Flooring, #323, Bluebonnet transition strips at main area entrance and storage rooms’ doors.
2.6.5. Move pews in main area as need to install new carpet.
2.7. Building 2893
2.7.1. Remove existing carpet, cove base and transition strips. See attached drawing.
2.7.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.7.3. Install new Milliken, Ghost Artist, Facade, Conceal carpet.
2.7.4. Install new Johnsonite, #20, Charcoal, cove base and transition
2.8. Building 432
2.8.1. Remove existing carpet in rooms 128, 129 and 130, cove base in all areas and transition strip room 128 entrance. See attached drawing.
2.8.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.8.3. Install new Interface, Cubic, Dimension carpet in all areas.
2.8.4. Install new Burke Flooring, #701, Black, cove base and transition strip.
2.8.5. Room 128 has lockers and room 129 has large work benches to be moved as needed to install new carpet.
2.9. Building 9400
2.9.1. Remove existing carpet and transition strips. See attached drawing.
2.9.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.9.3. Install new Milliken, Ghost Artist, Facade, Conceal carpet.
2.9.4. Install new Johnsonite, #20, Charcoal, cove base and transition
2.10. Building 649
2.10.1. Remove existing carpet, cove base and transition strips. See attached drawing.
2.10.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.10.3. Install new Interface, Cubic, Dimension carpet.
2.10.4. Install new Burke Flooring, #660, Rocky, cove base in all areas and transition strips at all doors.
2.10.5. Move equipment, cabinets, etc. in rooms 101, 119,121 and 123 as needed to install new carpet.
2.11. Building 164
2.11.1. Remove existing carpet, vinyl cove base and transition strips. See attached drawing.
2.11.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.11.3. Install new Interface, Cubic, Balance carpet.
2.11.4. Install new Burke Flooring, #323, Bluebonnet, cove base in all areas except rooms 140, 141, 142 and 143 and transition strips at all doors from corridor excluding Vault area.
2.11.5. Lockers in room 131 and work benches in room 128 to be moved as needed to install new carpet.
2.11.6. Work in Vault area shall be done on weekends only.
2.11.7. Building is located in the Airfield Controlled area.
2.12. Building 7025
2.12.1. Remove existing carpet, vinyl cove base and transition strips. See attached drawing.
2.12.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.12.3. Install new Interface, Cubic, Horizontal carpet.
2.12.4. Install new Burke Flooring, #597, Mocha, cove base in all areas and transition strips at room entrance doors.
2.12.5. Building is located in a Secure Area.
2.13. Building 290
2.13.1. Carpet replacement – See attached drawing
2.13.1.1. Remove existing carpet, vinyl cove base and transition strips. See attached drawing.
2.13.1.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.13.1.3. Install new Interface, Cubic, Dimension, carpet.
2.13.1.4. Install new Burke Flooring, #660, Rocky, cove base in all rooms and transition strips at all rooms excluding Vault area.
2.13.1.5. Lockers in room 170 and work benches in room 174
shall be moved as needed to install new carpet.
2.13.1.6. Work in Vault area shall be done on weekends only.
2.13.2. Tile replacement – See attached drawing
2.13.2.1. Remove carpet in Duty Desk area and demo existing tile in all other areas.
2.13.2.2. Remove existing vinyl cove base at Duty Desk area and tile cove base in all other areas.
2.13.2.3. Clean, repair, patch floor as needed to provide smooth / level surface for the new tile.
2.13.2.4. Install new 18 x 18 daltile, Heathland, White Rock tile in all areas with Custom Building Products #370 Dove Gray grout and Ashland accent tile.
2.13.2.5. Install new Burke Flooring, #660, Rocky, vinyl cove base at Duty Desk counter and display cabinet. Install White Rock tile cove base everywhere else. No cove base to be installed on blue wall at Duty Desk area.
2.13.2.6. Tile lay out shall be in a diamond pattern. Contractor shall verify tile layout prior to start of work.
2.13.2.7. Tile shall end at center of closed doors at all doors without a threshold.
2.13.2.8. Repair any wall damage at the cove base which occurs due to the replacement.
2.13.3. Building is located in the Airfield Controlled area.
2.14. Building 1138
2.14.1. Remove existing carpet and vinyl cove base. See attached drawing.
2.14.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.14.3. Install new Interface, Cubic, Construction, carpet.
2.14.4. Install new Burke Flooring, #663, Sky Gray, cove base in all areas.
Metal transition strip at doors and open office area border shall remain.
2.14.5. Open office area has system furniture.
2.15. Building 647
2.15.1. Remove existing carpet and vinyl cove base. See attached drawing.
2.15.2. Clean, repair, patch floor as needed to provide smooth / level surface for the new carpet.
2.15.3. Install new Interface, Cubic, Construction, carpet.
2.15.4. Install new Burke Flooring, #662, Rocky, cove base in all areas.
2.15.5. Replace transition strips to match new cove base at both double door entrances, Comm. room in Command area, janitor closet, 2 at break room and Comm. Room south of break room.
2.15.6. Large open areas have system furniture.
2.16. Building 6011
2.16.1. Remove 4”x4” ceramic tile area at entrance door.
2.16.2. Remove carpet in large and small rooms.
2.16.3. Remove VCT in restroom.
2.16.4. Remove vinyl cove base in all areas.
2.16.5. Clean, repair, patch floor as needed to provide smooth / level surface for the new LVT.
2.16.6. Install new Armstrong, Raw Crete, Paradiso, 18 x 18, LVT in all areas.
2.16.7. Install new Burke Flooring, #597, Mocha, cove base in all areas.
2.16.8. Remove toilet and partition and reinstall on new flooring and make any adjustments needed for change in floor height.
2.17. Carpet and tile shall be put under removable thresholds.
2.18. Buildings will remain occupied during work.
2.19. Move furniture as needed to accomplish the work.
2.20.Contractor shall coordinate phasing of work with Facility Manager.
2.21. Provide Facility Manager with extra carpet tiles for replacement later.
Provide at least 4 tiles for the smaller buildings and at least 9 for the larger ones.
3.0. HAZARDOUS MATERIAL INVENTORY AND TRACKING: The contractor shall submit TAFB Form 81 (Contractor’s Hazardous Material Questionnaire – Attachment 3) and TAFB Form 82 (Short-Term Contractor Hazardous Material Inventory – Attachment 4), prior to starting work. The Contractor should note that Tyndall AFB is required to report chemicals used such as (but not limited to) compressed gases, adhesives, aerosol cans, sealants, paints, lubricants, oils, cleaners, degreasers, pesticides. Copies of manufacturer-specific Material Safety Data Sheets (MSDS) must be attached to TAFB Form 82. After submission, 325 CES/CEI will notify the Project Manager and CONS of the reportable chemicals and of any special instructions. The Contractor is required to submit TAFB Form 83 (Contractor Environmental Reporting Entry Form – Attachment 6) at the completion of the project. The CO must be notified of any changes from the original submittal (i.e.
new chemical is added, size of container or unit of issue changes or if the manufacturer changes). These MSDSs shall also be readily accessible at the location of each hazardous material. MSDS shall be provided to CE Environmental Engineering and to the Quality Assurance Personnel, and approved by the government, prior to commencement of work.
4.0. HOURS: The normal duty hours of work on Tyndall AFB are from 6:30 AM to
5:00 PM, Monday thru Friday excluding Federal Holidays. All work shall be performed during normal duty hours. All other hours shall be requested through the Contracting Officer for approval. This request shall be submitted no less than three
(3) workdays prior to the time requested.
5.0. MATERIALS: All material shall be high quality from a well-known Manufacturer and used per the manufacturer’s recommendations.
6.0. DEBRIS AND MATERIALS: The contractor shall dispose of all debris and waste materials generated by any work under this contract on a daily basis off-base at no additional cost to the government.
7.0. BASE ACCESS: The contractor shall notify Civil Engineering Quality Assurance
(QA) Personnel at 850-283-1380 at least two week prior to start of work to obtain Base Access badges.
8.0. COORDINATION: The contractor shall notify Civil Engineering Quality
Assurance (QA) Personnel at 850-283-1380 one week prior to start of work. The QAP shall inspect all work.
9.0. DRAWINGS: Drawings are provided for reference and are for “Official Use
Only”. All dimensions, measurements and quantities etc. are approximate and shall be verified by the Contractor.
10.0.SAFETY: The contractor shall comply with all Federal, State and Local
Regulations.
114 108 107 106 105 104
MEN
WOMEN
LOBBY
PROJECTION ROOM
HALLWAY
MECHANICAL COMPUTER/TRAINING BRIEFING BRIEFING WTT
MAIN BRIEFING/
ACADEMICSTUDY/OFFICE
COMM.
9'-10 1/2"9'-11"9'-11"9'-11"21'-6 1/2"
14'-7"
72'-0"
4'-5"
6'-0"
4'-1 1/2"
3'-9 1/2" 2'-2 1/2"
4'-5"
SCALE - 1/4"=1'-0"
11'-10 1/2"
6'-7"
4'-8"
4'-8"
7'-0"
5'-4 3/4"
8"
10'-6" 8" 6'-10" 8"
15'-4 1/2" 5'-5" 30'-4 1/2" 8"
8"
19'-9 1/2"
4'-11"
13'-1 1/2"
8"
8"
8" 8'8"
8"
13'-3"
8"
10'-7"
10'-7"
8"
3'-1 1/4"
8" 40'-0"
8"
15'-7"
5'-4"
4'-4"
3'-2"
3'-2"
8"8"
3'-8"
BRIEFING
2'-9"
10'-55 8" 11'-07
8"
CARPET REPLACEMENT AREA
FLOOR PLAN
AS-BUILT
FIRST FLOOR PLAN
SCALE: 1" = 20'
15 DEC 09
ENTIRE BLDG
15 DEC 09
MIMS
AS BUILT MIMS
1 1
TITLEBLOCK MIMS
15 DEC 09
15 DEC 09
FLOOR PLAN
AS-BUILT
FIRST FLOOR PLAN
SCALE: 1/4" = 1'-0"
24 FEB 10
ENTIRE BLDG
24 FEB 10
24 FEB 10
24 FEB 10
BLDG 1470
STAIRWAY
No 2
OFFICE
JAN.
STO.
STO.
C O
R R
ID
O R
No 1
STAIRWAY
TOILET
FOYER 204
CHAPLAIN'S OFFICE
CHAPLAIN'S OFFICE
CHAPLAIN'S OFFICE
CHAPLAIN'S OFFICE
CONFERENCE ROOM
FOYER
DUCT CHASE
253 SF
50 SF
58 SF
166 SF
128 SF
210 SF
208 SF240 SF
214 SF
518 SF
67 SF
218 SF
379 SF
115 SF
28 SF
640 SF
BALCONY
NIC
RR
NIC
89 SF
NIC
CPT
CPT
CPT
CPT
CPT
CPT
CPT
CPT
CPT
CPT
CARPET REPLACEMENT AREA
STORAGE
STORAGE
STORAGE
RESTROOM
STORAGE
HALL
STORAGE
SACRISTY
STORAGE
RESTROOM
FOYER
STAGE
MAIN AREA
106A
HALL
STORAGE
CARPET REPLACEMENT AREA
A E
T C
P H
A S
E I
I B
L D
G
F
L O
O R
P
A
N
FO
R O
FF
IC
IA
L
USE O
NLY
A E
T C
P H
A S
E I
I B
L D
G
O
A
N
FO
R O
FF
IC
IA
L
13'-4"
18'-8"
'-8
4'
7'
12'-8"
43'-4"
9'-4"
20'
'-8
'-4
'-4
8"
'-4
'-8
'-4
6'-8"
11'
11'
11'
'-7
4'-8"
4'-2"
11'
'-7
8'
2"
8"6'
11'-1"
16' 4'-8"
3'-4" 2'-8"
3'-4"
'-0
'-2
'-3
'-1
'-8
'-8
FLOOR PLAN
AS-BUILT
FIRST FLOOR PLAN
SCALE: 1" = 20'
21 JULY 09
ENTIRE BLDG
21 JULY 09
21 JULY 09
21 JULY 09
17'-0"
'-5
6'
-6
'-2
13'-9" 15'-11" 14'-5" 8'-4" 8'-6" 39'-5" 5'-9"
9'-10" 10'-0" 13'-0" 12'-10" 23'-8" 4'-6"
'-5
10'-0" 4'-0"
7' -1
0" 3'
-8
14'-4"
'-1
"6' -8
125'-9"
'-6
'-1
11'-0"4'-4" 22'-0"
'-7
'-0
5'-10"
6' -9
5' -2
18'-9 1/2"
5'-1"
4'-0"
RM 101 RM 103 RM 105 RM 107 RM 109
RM 111
RM 100 RM 102 RM 104 RM 106
RM 108
RM 110
RM 112
RM 115
RM 113
W O
M E
N 'S
MEN'S
ROOM
SHOWER'S
RM 114
NW CORRIDOR
N E
C O
R R
ID
O
R W
E S
T C
O R
R
ID
O R
RM 124
RM 123
RM 122RM 121
RM 118
RM 117 RM 119
RM 133
RM 134
RM 135
RM 136
RM 132
RM 131
RM 130
RM 129
RM 128
RM 125RM 126
RM 120
ENTRANCE
HERITAGE
RM
COMM
RM
MECH
RM 1
MECH
RM 2
5'-10"
5'-1"
'-8
4'
-1 0"
10'-8" 6'-10" 16'-0"
'-8
4'
-1 0"
'-2
12'-5"
'-0
'-0
'-1
0" 8'
-8
7' -2
'-4
23'-4"
10'-4"5'-1"18'-5 1/2"
9'-4 1/2" 8'-9"
AREA FOR NEW CARPET
A E
T C
P H
A S
E I
B L
D G
O
N
'-8
10'-4"
61'-4"
'-3
5'-3"
'-4
'-4
PRINT ROOM LOCKERS /DRESSING
PMEL
CAD / SUPV
OFFICE
CREW CHIEF
OFFICE SPACE
CABLE SUPPLY
NCOIC / ASST.
CABLE SYS
WIRE CHIEF
OFFICE
FOYER
COMMER COMM
BILLING OFFICIAL
NCOIC / ASST.
TELE. SYS.
BREAK ROOM
MENS WOMENS
HALL 1
FRAME & EQUIPMENT
ROOM
CREW CHIEF
OFFICE SPACE
SWITCH BOARD
SWBD
SUPV.
MENS
MECHANICAL ROOM
SWITCH ROOM
SWITCH TECH
OFFICE
BATTERY
ROOM DISA ROOM
MECHANICAL
YARD
HALL 2
16'-9"
'-7
46'-2"
4'-9"
19'-4"
6'-4"
20'-0"
4'
'-1
'-8
62'
'-4
71'-4"80'-6"
'-8
46'-10" 20'-8" 39'-2" 8"
45'-6"
6' 1
'-2
'-4
'-6
'-1
50'-8"
'-9
23'-4" 15'-4"
22'-8"
STORAGE
FOYER
AREAS FOR CARPET REPLACEMENT
FLOOR PLAN
AS-BUILT
FIRST FLOOR PLAN
SCALE: 1" = 25'
08 JAN 08
ENTIRE BLDG
08 JAN 08
MIMS
AS BUILT MIMS
08 JAN 08
1 1
08 JAN 08
HVAC ROOM
OFFICEKITCHEN
LOUNGE
OFFICE
BRIEFING
ROOM
BRIEFING
ROOM
BRIEFING
ROOM
R/R
OFFICE
OFFICE
STORAGE OFFICE
LIFE SUPPORT
LIFE SUPPORT
NIC
QT
NIC
NIC
NIC NIC
QT
QT
NIC
BRIEFING ROOM
R/R
AUDITORIUM
OFFICE
NICNIC
NIC
NIC
NIC
STORAGE
ROOM
NIC
NIC NIC NIC
NIC
NIC
NIC
NIC
NIC NIC
NIC
NIC
168 SF 145 SF 150 SF 153 SF
400 SF
63 SF
572 SF
181 SF
213 SF
154 SF 99 SF 271 SF
37 SF
764 SF
496 SF
174 SF
171 SF250 SF147 SF88 SF
89 SF
280 SF
260 SF
275 SF
222 SF 158 SF
163 SF
161 SF
160 SF
133 SF
20 SF
183 SF
257 SF 179 SF 377 SF
641 SF
204 SF
151 SF
133 SF
204 SF355 SF
479 SF
769 SF
404 SF
104 SF 136 SF
50 SF
141139
134 135 136
150154
123 126
119 155
115 120114
113109
QT QT
CORRIDOR
274 SF
JANITOR
132 151
QT
MEN HALL
90 SF
QT
QT
QT
QT
ORDERLY ROOM
FOYER
QT QTQT
QT
CORRIDOR
300 SF
33 SF
CPT
BRIEFING ROOM
CPT
BRIEFING ROOM
BRIEFING ROOM
BRIEFING ROOM
BRIEFING ROOM
BRIEFING ROOMBRIEFING ROOM
CPT
CPT
CPT
CPT
CPT
CPT
CPT
CPT
BRIEFING ROOM
BRIEFING ROOM
BRIEFING ROOM
CPT
HALL
QT
WOMEN
211 SF
QT
STORAGECOMMBRIEFING ROOM
CORRIDOR
142 SF
NIC
102101 103 104
BRIEFING ROOMBRIEFING ROOMBRIEFING ROOM
BRIEFING ROOM
SECURE
BRIEFING ROOM
CORRIDOR
N
IC
S
F
C O
R R
ID
O R
BRIEFING ROOM
BRIEFING ROOM
BRIEFING ROOM
C O
R R
ID
O R
C O
R R
ID
O R
CORRIDOR
HALL
CARPET REPLACEMENT AREAS
VAULT AREA
A E
T C
P H
A S
E I
B L
D G
O
N
10' X 10' ROLL-UP DOOR10' X 10' ROLL-UP DOOR
36"X36"
SHOWER
36"X36"
SHOWER
10' X 10' ROLL-UP DOOR
5 6
2' 10' 6'-8" 12'-4" 10'-9" 7"
4'-8" 3"
10'-11" 10'-11" 5'-4" 2'-8" 10' 2'
2' 10' 2' 3'-4" 1'-4" 11'-4" 15'-5" 10'-5" 6'-6" 3'-4" 16' 2'-4" 3'-4" 2' 10' 2'
18'-8" 43'-8" 19'-4" 19'-8"
101'-4"
'-7
'-5
'-2
'-5
18'-8" 23'-1" 16'-5" 10'-11" 12'-7" 19'-8"
4'-7"
34'-8"
1' 1'-4" 3'-4" 2'
FILLED CELLS @ 32" O.C. (TYP)
1 #5 REBAR VERTICAL W/ CONC.
7'-8" 12'
1 #5 REBAR VERTICAL @ 16" o.c. AND
ALL CELLS FILLED SOLID IN 12" WALL (TYP)
10' X 10' ROLL-UP DOOR
MAINTENANCE BAY
510 SF
MECHANICAL RM
139 SF
OFFICE
118 SF
MEN'S RR
115 SF
WOMEN'S RR
115 SF
SHOP CHIEF
122 SF
MAINTENANCE BAY
495 SF
HALL
52 SF
HALL 168 SF
ACCT CUSTODIAN
109 SF
CREW CHIEFS
168 SF
112 SF
JAN.
26 SF
COMM
28 SF
BREAKROOM
305 SF
CARPET REPLACEMENT AREA
FLOOR PLAN
AS-BUILT
FIRST FLOOR PLAN
SCALE: 3/16" = 1'-0"
12 APR 10
ENTIRE BLDG
12 APR 10
12 APR 10
12 APR 10
CONFERENCE /
TRAINING /
LIBRARY
OFFICE
OPEN OFFICES
OFFICE
OFFICE
VEHICLE BAYSSOILS LAB
MEN
WOMEN
QT
CPT
QT
CPT
CPT
QT
1HALL
MECHANICAL
COMM RM
AIR
MECH.
A/C
CPT
CPT
QT
QT
HALL A
HALL B
NIC
NIC
NICQT
CARPET REPLACEMENT AREAS
A E
T C
P H
A S
E I
I B
L D
G
F
L O
A
N
FO
R O
FF
IC
IA
L
| 15-2053D-Maint Flooring Base Wide-CONS-2 |
| 15-2053D-Maint Flooring Base Wide-CONS-2 |
| 15-2053D-Maint Flooring Base Wide-CONS-2 |
| 15-2053D-Maint Flooring, Base Wide-SOW-2 |
File details come from the government source that posted it. Updated .