Requirements_Doc_9_Mar_17.docx
DOCX document 14 KB Posted
- Attached to
- Deutz Diesel Engine Assebly Kits Federal contract opportunity
- Solicitation number
- FA4819-17-Q-3027
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Requirements_Doc_4_Apr_17_(Updated).docx | DOCX document | |
| RFQ_Duetz_Diesel_Engines_(updated).docx | DOCX document | |
| Q&A.docx | DOCX document | |
| Q&A.docx | DOCX document | |
| Deutz_Diesel_Engine_Assembly_Kit_Brand_Name_J&A.pdf | ||
| Requirements_Doc.docx | DOCX document | |
| RFQ_Duetz_Diesel_Engines.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 1 Continuation of Item Description
The engine assembly kit must include the following 24 Volt items:
1 Starter P/N: 4300286 1 Alternator P/N: 4103903 1 Shutdown Solenoid P/N: 4103822 2 Glow Plugs P/N: 1179017.
1 Deutz Diesel Tier 4i engine with EGR valve, rated for 63.7 HP @2600 RPM.
1 LOFA 24 Volt Control Panel without factory harness. P/N: EP250KL7
The engine assembly kit must include:
1 Power Take-off (PTO) Package, HSG Size: 4; Clutch Size: 8S (PTO). NACD P/N: 431026AM
1 Engine Harness with relay sockets P/N: 23973 1 Exhaust Pipe P/N: 21998 1 Guard, Cooler P/N: 1732 1 Throttle Lever Mounting Kit (Speed Control) P/N: 1548 1 Aluminum Vernier Throttle Cable P/N: 58028 1 Truck Valve, Oil Drain P/N: 57267 1 Adapter, Oil Drain P/N: 57268 1 Timing Control Unit (Relay) P/N: 4219375 1 Slave Relay P/N: 4271981 1 Wiring Harness for LOFA Panel Gauge(s) illumination P/N: 801-3305-17 1 MC Mount Kit, Deutz P/N: 22000565 (2 Front and 2 Rear Engine Flex Mounts)
Note: Vendor will perform the following actions:
Perform quality assurance (QA) inspection to verify operation and correct indication on control panel for all engine safety shut down devices e.g., low oil pressure, high engine temperature Ensure all gauges are functioning properly and calibrated; throttle operates freely with no binding; and D.C. charging system checked Verify engine preheat system is operational through the preheat controller and indicating properly on the engine control panel The engine/PTO must be completely assembled with the exception of the following loose items that must be packaged with each engine: 24 volt LOFA Control panel and all the requested manuals Loose items will be verified and inventoried for packaging/completeness Each engine assembly must be shipped with lubricating oil installed Each engine must have the mandatory exhaust emissions label (National Security Exemption (NSE) Certification Label attached on the engine as required by the EPA)
File details come from the government source that posted it. Updated .