Requirements_Doc_4_Apr_17_(Updated).docx

DOCX document 14 KB Posted

Attached to
Deutz Diesel Engine Assebly Kits Federal contract opportunity
Solicitation number
FA4819-17-Q-3027
Issued by
Department of the Air Force Air Combat Command

About this file

Requirements document to detail specifications of requirement.

View the file

Other files for this federal contract opportunity

Other files attached to Deutz Diesel Engine Assebly Kits, newest first.
File Type Posted
RFQ_Duetz_Diesel_Engines_(updated).docx DOCX document
Q&A.docx DOCX document
Q&A.docx DOCX document
Deutz_Diesel_Engine_Assembly_Kit_Brand_Name_J&A.pdf PDF
Requirements_Doc_9_Mar_17.docx DOCX document
Requirements_Doc.docx DOCX document
RFQ_Duetz_Diesel_Engines.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 1 Continuation of Item Description

The engine assembly kit must include the following 24 Volt items:

1 Starter P/N: 4300286 (or equal) 1 Alternator P/N: 4103903 (or equal) 1 Shutdown Solenoid P/N: 4103822 (or equal) 2 Glow Plugs P/N: 1179017 (or equal) 1 Deutz Diesel Tier 4i engine with EGR valve, rated for 63.7 HP @2600 RPM (or equal) 1 LOFA 24 Volt Control Panel without factory harness. P/N: EP250KL7 (or equal)

The engine assembly kit must include:

1 Power Take-off (PTO) Package, HSG Size: 4; Clutch Size: 8S (PTO). NACD P/N: 431026AM (or equal)

1 Engine Harness with relay sockets P/N: 23973 (or equal) 1 Exhaust Pipe P/N: 21998 (or equal) 1 Guard, Cooler P/N: 1732 (or equal) 1 Throttle Lever Mounting Kit (Speed Control) P/N: 1548 (or equal) 1 Aluminum Vernier Throttle Cable P/N: 58028 (or equal) 1 Truck Valve, Oil Drain P/N: 57267 (or equal) 1 Adapter, Oil Drain P/N: 57268 (or equal) 1 Timing Control Unit (Relay) P/N: 4219375 (or equal) 1 Slave Relay P/N: 4271981 (or equal) 1 Wiring Harness for LOFA Panel Gauge(s) illumination P/N: 801-3305-17 (or equal) 1 MC Mount Kit, Deutz P/N: 22000565 (or equal) (2 Front and 2 Rear Engine Flex Mounts)

Note: Vendor will perform the following actions:

Perform quality assurance (QA) inspection to verify operation and correct indication on control panel for all engine safety shut down devices e.g., low oil pressure, high engine temperature Ensure all gauges are functioning properly and calibrated; throttle operates freely with no binding; and D.C. charging system checked Verify engine preheat system is operational through the preheat controller and indicating properly on the engine control panel The engine/PTO must be completely assembled with the exception of the following loose items that must be packaged with each engine: 24 volt LOFA Control panel and all the requested manuals Loose items will be verified and inventoried for packaging/completeness Each engine assembly must be shipped with lubricating oil installed Each engine must have the mandatory exhaust emissions label (National Security Exemption (NSE) Certification Label attached on the engine as required by the EPA)

File details come from the government source that posted it. Updated .