Amendment 4 Attachment 1 Statement of Work - Arms Part Washer Revision 2.pdf

PDF 97 KB Posted

Attached to
Arms Part Washer Federal contract opportunity
Solicitation number
FA480920Q0018
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW) Revision 2 3 September, 2020

Installation of Arms Part Washer

1. SCOPE: The contractor shall provide all personnel, tools, equipment, supervision, and any other items necessary to procure and install an Ultrasonic Washer which meets the requirements as mandated by T.O 11W1-12-4-32 WP 006 00:

i) Cleaning tank is designed to hold cleaning solution and provide ultrasonic cleaning and agitation for cleaning of components, a separate tank is for clean water rinse.

ii) The dynamic processing machine must have variable sweep frequency capability and provide a water rinse with optional drying module following each wash/rinse cycle.

iii) Ultrasonic watt density shall not exceed 40 watts/gallon.

iv) The temperature of the filtered washing and rinsing solution shall not exceed 160 °F and the self-heated, high volume air drying module using air knives shall not exceed 200 °F.

v) Adjustable heat and time settings for both tanks are required.

vi) Solution of Formula 815GD, product number 301007 will be mixed in an approximate 5 oz. solution to 1 gallon of water.

vii) Set wash tank to 160 °F and rinse tank to 140 °F.

viii) If difficulties are observed then the cleaning times could easily be adjusted.

ix) The times and settings should be repeatable and adjustable.

x) Cleaning Cycle.

(1) Wash processing time shall not exceed 10 minutes per part per cleaning operation, limited to 30 minutes (3 cycles) for excessively soiled gun parts per cleaning operation.

(2) Parts shall not be allowed to contact the sides or bottom of the processing vessels.

(3) After cleaning, parts should be lubricated in accordance with technical order directives after processing.

(4) The cleaning cycle is 10 minutes total time with the following settings:

(a) 135 seconds ultrasonic cleaning

(b) 60 seconds agitation/spray

(c) 135 seconds ultrasonic cleaning

(d) 60 seconds agitation/spray

(e) 135 seconds ultrasonic cleaning

(f) 60 seconds agitation/spray

xi) Rinse Cycle.

(1) Rinse cycle should be 5 minutes in clean tap water.

xii) Drying

(1) (Revision 1) Drying shall be accomplished by subjecting components to a blast of prepared dry and clean low-pressure compressed air not to excess 30 PSI.

2. (Revision 2) Removal and disposal of current Arm Part Washer

i) The Contractor shall remove the current Arm Part Washer and dispose of it off-base.

ii) The Contractor shall follow local, state, and federal guidelines.

iii) The current Arm Part Washer is a SharperTek Model SH-8000-200G

3. LOCATION: The contractor shall install the Arms Part Washer at 1330 Cannon Avenue, Seymour Johnson AFB, North Carolina.

4. PERSONNEL/QUALIFICATIONS: Contractor shall provide qualified technicians to install, and test all units for proper use as instructed by the manufacturer’s regulations or guidance.

5. WORKMANSHIP/QUALITY CONTROL: The contractor shall provide all Quality

Control in accordance with commercial practices to ensure that all work is performed in accordance with this SOW. Technicians shall also test and validate each component works as designed after installation.

6. DELIVERY and INSTALLATION SCHEDULE: The contractor shall perform installation within 90 days of ACO.

7. CONTRACTOR-FURNISHED SUPPLIES AND SERVICES: Contractor shall provide the equipment, supervision, transportation, supplies, and all personnel necessary to complete the work covered by the work requested in this SOW.

8. POINT OF CONTACT: The designated representative will be TSgt Theresa Burse at (919)

722-7070 or at theresa.burse@us.af.mil.

9. CLEANUP: The contractor is responsible to dispose of all waste material(s) related to the work governed in this SOW and shall notify Point of Contact (POC) at the completion of work.

10. WARRANTY: The contractor shall guarantee all workmanship and warranty all new equipment covered under the commercial warranty.

File details come from the government source that posted it. Updated .