Attch2_CostEstWkst_180702.xls
XLS spreadsheet 54 KB Posted
- Attached to
- Construct Additional Parking near Bldg 1627 Federal contract opportunity
- Solicitation number
- FA4803-18-B-0008
About this file
Cost Estimate Worksheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4803-18-B-0008-P00001_Corrections_to_Solicitation.pdf | ||
| FA480318B0008_Parking1627_rel.pdf | ||
| Attch3_DD1354_draft.pdf | ||
| Attch1_SOW_180702.pdf | ||
| Attch6_Base_Pass_Request.pdf | ||
| Attch5_WDSC180054_180105.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Roof Repair, B710
| Project: CONSTR Additional Parking near B1627 | Project Engineer: Matt Wenger | ||||||||||
| Location: B1601, B1604, B1605, B1606 and B1627 | Department: CEOER | ||||||||||
| Contractor: TBD | |||||||||||
| Address: Shaw AFB, SC | |||||||||||
| PR No.: VLSB 18-0042 | |||||||||||
| For Official Use Only | |||||||||||
| Line No. | Item | Unit of Measure | Quantity | Material Costs | Labor Costs | Direct Cost | Line Total | ||||
| Unit Cost | Total | Labor Hours per Unit | Labor-Hours | Avg. Rate ($/hr) | Total | ||||||
| Additional Parking near B1627 | |||||||||||
| 1 | Sidewalk demo | SY | $0.00 | ||||||||
| 2 | Dumpster rental / dump fee | EA | $0.00 | ||||||||
| 3 | Clearing and grubbing | AC | $0.00 | ||||||||
| 4 | Storm system | LF | $0.00 | ||||||||
| 5 | subgrade prep | SF | $0.00 | ||||||||
| 6 | Base prep | SY | $0.00 | ||||||||
| 7 | Asphalt | TON | $0.00 | ||||||||
| 8 | Overhead lighting | EA | $0.00 | ||||||||
| 9 | Lighting utility | LF | $0.00 | ||||||||
| 10 | Curb and gutter | LF | $0.00 | ||||||||
| 11 | Parking lot - striping | Stall | $0.00 | ||||||||
| 12 | General conditions / supervision | WK | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Base Bid | |||||||||||
| Total Material Cost: | $0.00 | ||||||||||
| Total Labor Cost: | $0.00 | ||||||||||
| Direct Cost: | $0.00 | ||||||||||
| Total Line Item Cost: | $0.00 | ||||||||||
| Overhead: | $0.00 | ||||||||||
| Subtotal: | $0.00 | $0.00 | |||||||||
| Profit: | $0.00 | ||||||||||
| Subtotal: | $0.00 | ||||||||||
| Bond: | $0.00 | ||||||||||
| Total Contract Price: | $0.00 |
Roof Repair, B710 (2)
| Project: Repair Roof, Operations Group B710 | Project Engineer: Shep Sublette | ||||||||||
| Location: Shaw AFB | Department: CEOER | ||||||||||
| Contractor: | |||||||||||
| Address: | |||||||||||
| PR No.: VLSB 14-0011 | |||||||||||
| For Official Use Only | |||||||||||
| Line No. | Item | Unit of Measure | Quantity | Material Costs | Labor Costs | Direct Cost | Line Total | ||||
| Unit Cost | Total | Labor Hours per Unit | Labor-Hours | Avg. Rate ($/hr) | Total | ||||||
| BUILDING 0710 | |||||||||||
| 1 | Demo roof material | SF | 21,124 | $0.00 | 0.06 | 1605 | $32.30 | $51,841.50 | $51,841.50 | ||
| 2 | Abate ACM | SF | 1,500 | $0.05 | $75.00 | 0.06 | 90 | $32.30 | $2,907.00 | $2,982.00 | |
| 3 | Install Standing Seam Metal Roof | SF | 21,124 | $8.60 | $181,666.40 | 0.36 | 7605 | $32.30 | $245,629.87 | $427,296.27 | |
| 4 | Install R-30 Insulation | SF | 21,124 | $2.70 | $57,034.80 | 0.03 | 634 | $32.30 | $20,469.16 | $77,503.96 | |
| 5 | Site Cleanup | EA | 1 | 240 | $25.00 | $6,000.00 | $6,000.00 | ||||
| 6 | Supervision | EA | 1 | 1000 | $55.00 | $55,000.00 | $55,000.00 | ||||
| $238,776.20 | $381,847.53 | $0.00 | $620,623.73 | ||||||||
| Base Bid | |||||||||||
| Total Material Cost: | $238,776.20 | ||||||||||
| Total Labor Cost: | $381,847.53 | ||||||||||
| Direct Cost: | $0.00 | ||||||||||
| Total Line Item Cost: | $620,623.73 | ||||||||||
| Overhead: | 10% | $62,062.37 | |||||||||
| Subtotal: | $0.00 | $682,686.10 | |||||||||
| Profit: | 10% | $68,268.61 | |||||||||
| Subtotal: | $750,954.71 | ||||||||||
| Bond: | 2% | $15,019.09 | |||||||||
| Total Contract Price: | $765,973.81 |