About this file

Waste Water Treatment Plant Contractor Questions Answers 14 May 13.

View the file

Other files for this federal contract opportunity

Other files attached to Waste Water Treatment Plant Services, newest first.
File Type Posted
Amd_0004_Q As_22May13.doc DOC document
FA4801-13-R-0005_Amd_0003.doc DOC document
Signed_Site_Visit_Minutes_2_May_13.pdf PDF
WWTP_Conformed_thru_P00042.doc DOC document
Atch_1_WWTP_PWS_wAppendices_16_Jan_13_(2).doc DOC document
Amd_0002_Update_FAR_clauses.doc DOC document
Amd_0001 _Response_Date_for_Q's.doc DOC document
Atch_3 _4-pg_Base_access....pdf PDF
Atch_2 _WD_05-2511_Rev_16_06-13-2012.doc DOC document
Atch_4 _Special_Event_Request_1_July_2012_for_SV.docx DOCX document
WWTP_Sol_SF1449_Released.doc DOC document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sol. # FA4801-13-R-0005-0003

FA4801-13-R-0005 WWTP Contractor Questions and Answers PURE OPS, Inc Q. 1. We are requesting a copy of the current service contract.

A. The current service contract, FA4801-09-C-0001 (P00042 conformed copy, eff: 30 Apr 13) and Attachment 1, Performance Work Statement with Appendices (updated 16 Jan 13 on P00037), is provided in FedBizOpps.

Q. 2. We are requesting a copy of the current NPDES permit. The last known permit (NM0029971) had an expiration date of August 31, 2010. Have provisions been made to renew this permit?

A. The Government (49 CES/CEA (Environmental) Flight has responded to this request for the status of the new NPDE by stating there are issues between the Federal EPA and the New Mexico Environment Department. Therefore, the existing lab parameter requirements in the existing permit are still applicable.

Q. 3. We are requesting a copy of the last three years of maintenance costs. We'd like to establish the current state of repair of the system in order to generate cost forecasts.

A. The Government only tracks the corrective maintenance CLIN X003 which has been approximately $46K annually. CLIN X003 is spent for repairs/upgrades to pumps, equipment and other parts, etc. The contractor absorbs a portion of the cost in the monthly operating/preventive maintenance CLIN X001. Each contractor must establish their monthly operating expense based on the information in the PWS and applicable requirements; and the information stipulated in Paragraph 1.3.1, Corrective Maintenance and Paragraph 1.3.2, Government Approved Repairs, Improvements and Replacements. The Government does not track corrective or preventive maintenance imbedded in the monthly operations and maintenance under CLIN X001 (with the $1,500/80 hr cap) so the Government is unable to provide this information. The corrective maintenance CLIN X003 is reimbursable based on Government approved repairs and is the only maintenance CLIN which is tracked. For the past three fiscal years, $266,714.21 was spent on repairs, of which $18,000.00 was the contractor’s portion. Reference answers to Project Solutions Question #2.

Q. 4. We'd like confirmation that the requirements of the contract don't include electrical services, that is, that the contract at hand doesn't require the provision of electrical services.

A. Corrective and preventive maintenance could possibly require the electrical services for an outside electrician to come out and hook up motors, troubleshoot problems, etc. and is included in the overall repair under CLIN X001 (small jobs under $1,500.00 cap) and/or CLIN X003. The Government is only responsible for the power going to the plant and taking care of facility issues.

Project Solutions, Inc.

Q. 1. Is there a Maintenance Plan or checklist and can we have a copy?

A. Each contractor establishes their own Maintenance Plan and checklists in conjunction with their Quality Control (QC) Plan as this is a performance-based contract and the Government does not dictate how the work will be performed. The incumbent contractor has a QC Plan they use for a Maintenance Plan as well as their checklists. This information is proprietary to the incumbent contractor.

Q. 2. Can we see a list of repairs or replacement of equipment over the last 5 years?

A. The Government will provide the corrective maintenance costs for FY09-FY13 (up to March 2013) as follows:

Reimbursable Costs Corrective Maintenance, CLIN 0003 (10-month base year)

FY09

Jun $44,859.99 (Auger Repair, Grit Classifier Replacement Parts, MSA Air Regulator & Parts, Heater-ENG, Generator Repair (Water Pump, O-Rings, Hoses, Belt, Set Valves), Flygt Impeller & Volute Unit, Service Call)

Aug $1,209.00 (Reimbursable Maintenance)

Total $46,068.99

Reimbursable Costs Corrective Maintenance, CLIN 1003 (1st opt year)

FY10

May $230.78 (Emergency Preventive Maintenance: Partial Materials/Parts)

Aug $24,533.94 (Chlorine Scrubber, W Influent Pump & RAS Pump)

Aug

$118.93 (NCL)

Aug $10,780.57 (Corrective Maintenance Equipment & Electrical)

Sep $10,188.23 (Scrubber Repair, Various Vendor Parts)

Total $45,852.45

Reimbursable Costs Corrective Maintenance, CLIN 2003/2103 (PLC) (2d opt year)

FY11

Oct $504.02 (corrective maintenance)

May $659.00 (Mechanical Barscreen)

May $1,566.33 (Hydrogritter)

May $11,142.56 (Chlorine Scale)

May $2,555.00 (aeration basin scum pit discharge piping)

Sep $29,722.40 (Pump Replacement)

Sep $133,456.50 (PLC Replacement)

Total $179,605.81 Reimbursable Costs Corrective Maintenance, CLIN 3003 (3d opt year)

FY12

Mar $26,768.47 (Grit Chambers Rehab)

Mar $10,531.93 (Influent Lift Station Level Transmitter)

Mar $8,801.00 (Clarifier Gear Drive & Scum Pump Repair)

Total $46,101.40

Reimbursable Costs Corrective Maintenance, CLIN 4003 (4th opt year)

FY13

Mar $17,488.00 (High Mast Light Project)

Mar $5,519.00 (Influent Wet Well Pump Rail Rehab, Vent Modification, and Spray Valve Repair)

Total $23,007.00

GRAND TOTAL FY 09-FY13 (up to March 2013): $340,635.65

Q. 3. Can we see the list of contractor and/or government owned equipment?

A. As listed in the Solicitation, Performance Work Statement (PWS), Paragraph 3.0 and Appendix D, the only Government-furnished property (GFP) is the plant and the Operator Interface Unit (OIU) computer, with installed software, which is part of the controls system as described in the O&M manual. The manual is located at the wastewater treatment plant. The aforementioned equipment is identified in Appendix D, paragraph 19.2, of the PWS. PWS, Paragraph 4.12, states the Contractor shall provide all ware and equipment necessary to satisfy the requirements of paragraph 1.5 of the PWS. All incumbent contractor equipment was viewed during the site visit. You may contact the current contractor--reference answer to Question #6 for contractor information.

Q. 4. Does the plant test for Total Suspended Solids?

A. Yes, once per week. This is stated in Appendix E for NPDES permit information.

Q. 5. What is the amount of the chemicals used in the plant?

A.

Chlorine gas: 300 pounds per year

Sulfur Dioxide: 300 pounds per year

Sodium Hydroxide: approx 20 gallons per year

Diesel fuel for generator: approx 2000 gallons per year

Q. 6. Can we get the contact information for the current contractor?

A. Have them contact Nester Benavides at 410- 493-7404, or nbenavides@nvttech.com.

National O&M, Inc.

Q. 1. Please provide the annual amounts of chemicals used to include chlorine, sulfur dioxide and caustic.

A. Chlorine and sulfur dioxide: 300 lbs per year, caustic: 20 gallons per year of sodium hydroxide and possibly 50 gallons per year DI water

Q. 2. Please provide the annual amount of diesel fuel used for the 750 kVA generator.

A. 2,000 gallons per year.

Q. 3. Please provide the average historical number of repairs over $1,500.

A. Average 5 repairs per year.

Q&A for WWTP