SON_for_B1324_generator.pdf
PDF 66 KB Posted
- Attached to
- 9 CES CUMMINS 200 KW Generator Federal contract opportunity
- Solicitation number
- FA4686-18-R-0046
About this file
SON as referenced in RFQ Combo
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_Answers-_Generators_Amendments.pdf | ||
| COMBO-Amendment.pdf | ||
| RFI_Answers-_Generators.pdf | ||
| Brand_Name_Justification_-_CUMMINS_Generators.pdf | ||
| COMBO-Generators.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
9TH CIVIL ENGINEER SQUADRON (ACC)
BEALE AIR FORCE BASE, CALIFORNIA
Rhinos…Lead the Way!
14 Aug 18
MEMORANDUM FOR 9 CONS
FROM: 9 CES/CEOER
SUBJECT: Statement of Need for B1324 Generator Replacement
A. General Scope. The contractor shall furnish all supervision, labor, tools, equipment, materials, operations and incidentals as required to replace existing generator with new CUMMINGS 200kw diesel generator to including permits from Feather River Air Quality in conjunction with CES Environmental for compliance. All installation(s) shall be completed in accordance with the manufacturer’s instructions with a start- up and turn- over of O&M manuals after installation.
B. Authorized Work. Work shall be accomplished in accordance with all contractually incorporated documents. Any work that is accomplished outside of the contractual documents, unless authorized by a contracting officer, is accomplished at the contractors own risk.
C. All work shall be accomplished between 0700-1700 Mon-Fri.
D. Facility Access. This building is a controlled work area (Munitions). All access to this facility, including but not limited to workdays and any warranty calls, shall be coordinated in email no later than 72 hours in advance to arriving on site. This coordination shall be made via email with a joint message to the buildings facility manager (or ID’ d POC), the 9CES representative, and the contract administrator/officer. Coordination shall identify at a minimum:
name of person(s) to be on site, anticipated hours of work (including lunch schedule), and the need for an escort. If coordination is not verified or submitted in the required time frame, contractor access is at their own risk and they may or may not be admitted to the work area due to the availability of personnel. No electronic devices are allowed in the facility at any time.
E. Pictures of Work Site. This building is a controlled work area. Every attempt shall be made to provide government taken pictures of the controlled workspace within 72 hours of a written request. This timeframe may vary in length pending the number of photos taken and the availability of authorized personnel to sanitize and approve release of the photos. The government cannot guarantee that photos, if any, will be authorized. The contractor is not authorized in any circumstance, unless written authorization is given by the contracting officer, to take their own photos.
F. All contractor vehicles must enter the base via the Wheatland Gate and shall be subject to inspection. All contractor personnel must obtain base passes or be listed on the Entry Access List (EAL) throughout duration of work performance.
II. WORK ITEMS:
The contractor shall comply with all applicable Federal, State and installation standards. Current Air Force Occupational Safety and Health (AFOSH) standards also apply.
Contractor shall be in compliance IAW all NFPA, AFI, UFC and ETL standards for fire safety.
All waste materials will be disposed of and removed off base by Contractor. Contractor will practice good housekeeping during project.
JEFF HENDRICKS, GS-10, USAF
Planner/Manager