Attachment__2_Statement_of_Need_for_U2.pdf
PDF 120 KB Posted
- Attached to
- Vertical Lift Carousels Federal contract opportunity
- Solicitation number
- FA468618R0004
About this file
Statement of Need #2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 4a)_Request_For_Quote_-_Modified_15_Jan.doc | DOC document | |
| Request_For_Quote.pdf | ||
| Attachment__1_Statement_of_Need_for_GH_&_U2.pdf | ||
| Attachment__3_EAL_-_Carousels.xls | XLS spreadsheet | |
| Attachment__2_Statement_of_Need_for_U2.pdf | ||
| Attachment__1_Statement_of_Need_for_GH_&_U2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
9TH MAINTENANCE SQUADRON (ACC)
BEALE AIR FORCE BASE, CALIFORNIA
Airpower is the power of airmen
MEMORANDUM FOR 9 CONS/LGCB
FROM: 9 MXS/CCRA
SUBJECT: Statement of Need for Vertical Storage Lift
1. Purpose: Allows for storage and accessibility of support equipment that is utilized on the U-2 airframe performing 500 and 1000 hour phase inspections. The capacity increase and space reduction is achieved by the general design of a vertical lift which does not loose interior space due to a center column for the extractor of access window.
2. Background: The Maintenance Flight currently has a vertical lift and a vertical carousel that are experiencing consistent service issues (vertical carousel completely inoperable), which cause disruption to maintenance operations. Current units do not have a manual override to provide access to parts/tools during malfunctions which cause additional delays and directly impacts the flying mission. All of the equipment and materials that are normally stored in these vertical storage units have been removed to allow for accessibility and utilization.
3. Impact: Replacing the vertical storage units will allow the phase support section to properly store the required materials and equipment in a controlled environment while maintaining AFI 21-101 compliance.
4. Requirements: A single vertical lift storage unit measuring 109.45”wide x 120.98”deep x 23’ 1.56”high consisting of thirty two (32) Trays measuring 96.46"wide x 34"deep with a 794
lb. capacity per tray. Access to the unit will be a single opening with a manual hinged stainless steel table surface at a standing position. Access lighting will be above the workstation near the access opening that will illuminate the whole access area and table.
The vertical carousel must be a single unit measuring 140.7”wide x 22’ 7.1”high x 67.4”deep or 80”deep including the work counter. The unit must come with 26 carriers measuring 112.2”wide x 24.7”deep with a 1,433 lb weight capacity per carrier. Thirteen (13) of the carriers will be completely open with 15.71” clear. Thirteen (13) carriers will require one (1) additional reinforced shelf, two clear shelf levels of 6.97” per carrier. Twenty six (26) carriers wil have a slip on raised lip to increase front lip height to 2.17” and thirteen (13) slip on raised lips to increase front lip height to 2.95” on the single level carriers. Access lighting shall be placed at the top of the access opening on the outside of the front sliding door to illuminate the each carrier when accessed.
5. Detailed Requirements: The vertical lift and vertical carousel shall be of ergonomic design. They must have a clip system panel concept for fast disassemble and reassemble for maintenance purposes allowing high operator security in the event that stored goods fall inside the units. These units shall include extended warranty options that include parts, labor and transportation. Vertical lifts and vertical carousels shall come equipped with an emergency hand crank for access to parts in case of power failure. The units shall have a 100% reliable safety system with a manual emergency override stop button located within hands reach of the table and/or work counter. The vertical carousel will come equipped with access opening light curtain safety feature that bring the carousel operation to a halt in the event that something breaks the light curtain plain.
5. General Scope: The contractor shall provide all supervision, labor, materials and equipment to remove one (1) existing vertical lift and install one (1) new vertical lift.