RFIs_ _answers_on_FA4664_16_T_0004.docx
DOCX document 14 KB Posted
- Attached to
- Clean Room, Blast Room and Curring Oven Purchase & Installation Federal contract opportunity
- Solicitation number
- FA4664-16-T-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Answers_to_RFsI_on_FA4664-15-T-0002_Solicitation.pdf | ||
| Statement_of_Work_all_3_items.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFIs on FA4664-16-T-0004 Solicitation:
Oven Spec #9a specifies a vacuum pump capable of 28” Hg.
| Question 1: | What will be the required CFM or Volume? |
| Response 1: | The required vacuum will be 3 mbar. |
| Question 2: | Is vacuum storage required, if so how much? |
| Response 2: | No Storage Required |
Clean Room Spec 1p specifies (3) each 60 amp disconnect Switches.
| Question 1: | What will they be used on? |
| Response 1: | Disconnect switches would be for individual electrical components for the clean room; i.e., A/C, lights and outlets, filtration system. |
Question 2: What type of equipment will be used in the clean room?
Response 2: Air tools, Heat Gun, and Heatcon Hot bonder
Question 3: Electrical panels/sub-panels; will they be mounted on the walls outside of the clean room?
Response 3: The electrical panel/sub-panels will not be mounted on the walls outside of the clean room, because the existing building electrical panels/sub-panels will not be moved. The SOW called for contractor to pull required wiring to equipment location.
File details come from the government source that posted it. Updated .