| File | Type | Posted |
|---|---|---|
| 1._FA4661-18-Q-0007_-_Combo.docx | DOCX document | |
| Attach_3_-_Flexible_Base_Requirements.pdf | ||
| Attach_1_-_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Breakout Project Construction Materials Register
| Material | Estimate | ||||||||
| # | Shop | Task ID | Item | Qty Required | U/I | Reference | Part # | Estimated Unit Price | Total Estimated Price |
| 1 | Airfields | Concrete 5000 psi, fiber reinforced - Deliver between the dates of 08 Jan 18 and 05 Feb 18 | 1250 | cy | $ - 0 | ||||
| 2 | Airfields | Flexible base, TxDOT Grade 1/Grade 2 mix - Delivery btween the dates of 08 Jan 18 and 05 Feb 18 - Please provide gradation and proctor value reports | 15800 | ton | $ - 0 | ||||
| 3 | Airfields | Dowels, 1" dia x 16" | 1700 | ea | $ - 0 | ||||
| 4 | Airfields | Deformed Rebar (connect to drives), No 8" x 16" | 80 | ea | $ - 0 | ||||
| 5 | Airfields | Wide concrete saw blades 14" x .5" | 5 | ea | $ - 0 | ||||
| All items besides concrete, base course, and sub-base have a desired delivery of 30 Days ADC | $ - 0 | ||||||||
| $ - 0 | |||||||||
| Please read attached specifications for delivery | $ - 0 | ||||||||
| schedule | $ - 0 | ||||||||
| $ - 0 | |||||||||
| $ - 0 | |||||||||
| $ - 0 | |||||||||
| $ - 0 | |||||||||
| Total | $ - 0 |
Labor Rates Sheet
| Grade | Rank | Labor Rate |
| E-1 | AB | $ 15.00 |
| E-2 | Amn | $ 15.00 |
| E-3 | A1C | $ 15.00 |
| E-4 | SrA | $ 15.00 |
| E-5 | SSgt | $ 15.00 |
| E-6 | TSgt | $ 15.00 |
| E-7 | MSgt | $ 15.00 |
| E-8 | SMSgt | $ 15.00 |
| E-9 | CMSgt | $ 15.00 |
| O-1 | 2Lt | $ 15.00 |
| O-2 | 1Lt | $ 15.00 |
| O-3 | Capt | $ 15.00 |
| O-4 | Maj | $ 15.00 |
| O-5 | Lt Col | $ 15.00 |
| O-6 | Col | $ 15.00 |
| O-7 | Brig Gen | $ 15.00 |
| O-8 | Maj Gen | $ 15.00 |
| O-9 | Lt Gen | $ 15.00 |
| O-10 | Gen | $ 15.00 |
Equip Depreciation Sheet
| EQUIPMENT ITEM | DEPRECIATION | FUEL COMSUMPTION | TYPE FUEL |
| Air Compressor, Davey | $ 1.80 | 6 | DSL |
| Air Compressor, Ingersol Rand | $ 2.00 | 2 | DSL |
| Air Compressor, Sullair | $ 6.49 | 4 | DSL |
| Ambulance | $ 7.57 | 5 | DSL |
| Asphalt Distributor | $ 10.39 | 20 | DSL |
| Backhoe | $ 14.17 | 15 | DSL |
| Backhoe, 4WD | |||
| Blazer | $ 4.89 | 5 | DSL |
| Bobcat | $ 6.76 | 10 | Gas |
| Bus | $ 9.66 | 8 | DSL |
| Compactor | |||
| Concrete Mobile | $ 28.99 | 15 | DSL |
| Concrete Pump | $ 1.99 | 8 | Gas |
| Concrete Saw | $ 2.83 | 3 | Gas |
| Concrete Screed | $ 1.00 | 2 | Gas |
| Concrete Truck | |||
| Cooks Trailer (MKT) | $ 3.84 | 0 | N/A |
| Crane | $ 35.99 | 20 | DSL |
| Crane, 15 Ton | |||
| Dolley | $ 0.87 | 0 | N/A |
| Dozer | $ 22.72 | 20 | DSL |
| Dozer, Cat | $ 47.30 | 20 | DSL |
| Dozer, T4 | |||
| Dozer, TD-15 | |||
| Dozer, TD-20 | |||
| Dump Truck, 10 Ton | $ 11.91 | 8 | DSL |
| Dump Truck, 20 Ton | $ 21.24 | 10 | DSL |
| Excavator | $ 26.30 | 20 | DSL |
| Excavator, Rubber Tire | |||
| Forklift, 10K AT | DSL | ||
| Forklift, 10K JD | $ 24.16 | 15 | DSL |
| Forklift, 13K AT | DSL | ||
| Forklift, 6K Warehouse | $ 6.63 | 4 | DSL |
| Forklift, Electric | |||
| Fuel Truck | $ 8.66 | 5 | DSL |
| Fuel Truck, Diesel | |||
| Fuel Truck, Gas | |||
| Generator, 5KW | $ 1.50 | 2 | Gas |
| Gradall | $ 29.64 | 10 | DSL |
| Grader | $ 17.39 | 15 | DSL |
| Grader, Cat | |||
| Grader, Champion | $ 18.65 | 15 | DSL |
| Grader, JD | |||
| HUMVEE | |||
| Joint Sealer | $ 3.07 | 10 | Gas |
| K-Span Machine | $ 40.55 | 15 | DSL |
| Line Truck | |||
| Loader, 2.5 CY | $ 20.48 | 15 | DSL |
| Loader, 4 CY | |||
| Loader, 5 CY | |||
| Loader, Track | $ 37.60 | 20 | DSL |
| Lube Unit, ELL | $ 5.65 | 3 | Gas |
| Lube Unit, MCG | $ 8.17 | 3 | Gas |
| M-35, Deuce | $ 13.53 | 8 | DSL |
| Machine Shop Van | $ 9.71 | 10 | DSL |
| Maintenance Truck, M-87 | $ 4.48 | 8 | Gas |
| Manlift | $ 17.81 | 8 | DSL |
| Milling Machine | DSL | ||
| Mixer, Cement | $ 2.39 | 5 | Gas |
| Mixer/Tiller | $ 21.96 | 10 | DSL |
| MKT | $ 1.50 | 10 | Gas |
| Mud Pump | $ 16.95 | 8 | Gas |
| Mud Pump, MCM/PUM | $ 2.62 | 8 | Gas |
| Paint Striping Machine | $ 8.00 | 2 | Gas |
| Paver, Asphalt | $ 32.13 | 25 | DSL |
| Paver, Cat. | $ 26.00 | 25 | DSL |
| Pickup Truck, 3 PAX | $ 4.76 | 5 | Gas |
| Pickup Truck, 6 PAX | $ 7.06 | 5 | DSL |
| Pole Truck | $ 40.84 | 25 | DSL |
| Roller, Pneumatic Tire | $ 11.76 | 15 | DSL |
| Roller, Steel Wheel | $ 7.50 | 15 | DSL |
| Roller, Steel Wheel, 4 Ton | |||
| Roller, Steel Wheel, 8 Ton | |||
| Roller, Steel Wheel, 8-12 Ton | |||
| Roller, Vibratory | $ 11.33 | 15 | DSL |
| Rototiller | |||
| Scraper | $ 53.94 | 20 | DSL |
| Sweeper Truck | $ 17.59 | 3 | DSL |
| Sweeper, `88 Towed | $ 1.98 | 2 | DSL |
| Sweeper, Eglin | |||
| Sweeper, Farm Tractor | |||
| Sweeper, Tymco | |||
| Tar Distributor | $ 11.57 | 3 | DSL |
| Tractor | $ 19.47 | 9 | DSL |
| Tractor, 10 Ton | |||
| Tractor, 15 Ton | |||
| Tractor, 20 Ton | |||
| Tractor, 35 Ton | $ 3.80 | 3 | Gas |
| Tractor, 50 Ton | $ 5.70 | 3 | Gas |
| Tractor, 60 Ton | $ 3.25 | 0 | Gas |
| Tractor, Farm | $ 6.76 | 10 | DSL |
| Trailer, 32 ft Van | |||
| Trailer, 35 Ton | |||
| Trailer, 40 ft | $ 2.12 | 0 | N/A |
| Trailer, 400 Gallon Water Buffalo | $ 1.16 | 0 | N/A |
| Trailer, 5 Ton Trench | $ 0.61 | 0 | N/A |
| Trailer, 50 Ton | |||
| Trailer, 5000 Gallon | $ 7.06 | 3 | DSL |
| Trailer, 60 Ton | |||
| Trailer, Generator | $ 0.48 | 0 | N/A |
| Trailer, M-101 | |||
| Trailer, M-105 | $ 0.51 | 0 | N/A |
| Trailer, M-200 | |||
| Trailer, M-416 | $ 0.09 | 0 | N/A |
| Trailer, Spool (K-Span) | $ 2.00 | 0 | N/A |
| Trailer, Support (K-Span) | $ 1.50 | 0 | N/A |
| Trailer, Trencher | |||
| Trailer, Van | $ 1.64 | 0 | N/A |
| Trailer, Welding | $ 0.85 | 4 | DSL |
| Trencher | $ 21.44 | 8 | DSL |
| Van, 15 Pax | $ 9.71 | 5 | Gas |
| Water Pump, 90K | $ 3.13 | 15 | Gas |
| Water Truck, 1500 Gal | $ 9.99 | 3 | DSL |
| Welder | $ 2.89 | 5 | DSL |
| Welder, M35 | |||
| Well Driller | $ 169.85 | 30 | DSL |
| Wrecker, 5 Ton (M-series) | $ 44.48 | 15 | DSL |
BB
| DAILY INSPECTION RECORD | PROJECT# | ERROR:#REF! | ||||||
| DATE | TIME OF INSPECTOR'S VISITS TO SITE | |||||||
| ARRIVAL | DEPARTURE | ARRIVAL | DEPARTURE | ARRIVAL | DEPARTURE | ARRIVAL | DEPARTURE |
WEATHER CONDITIONS SATISFACTORY FOR WORK
| WORK FORCE - CONTRACTOR AND SUB-CONTRACTOR | |||||
| TRADE | NUMBER | TRADE | NUMBER | TRADE | NUMBER |
| MATERIALS DELIVERED TO JOB SITE | |||
| ITEM | QUANTITY | ITEM | QUANTITY |
| EQUIPMENT ON HAND | |||||
| TYPE | NUMBER | TYPE | NUMBER | TYPE | NUMBER |
WORK ACCOMPLISHED OR IN PROGRESS - TESTS PERFORMED
| (Continue report on reverse) | |
| NOTE: WRITE ALL ENTRIES LEGIBLY IN INK, LINE OUT ALL UNUSED PORTIONS, INSPECTOR SIGNS FIRST NAME, MIDDLE INITIAL AND LAST NAME ON EACH COMPLETED DAILY INSPECTION RECORD | REPORT NO |
YES
NO
Close and return to Blue Book Index
Gantt Calc
| 1 | ERROR:#REF! | ERROR:#REF! |
| 2 | ERROR:#REF! | ERROR:#REF! |
| 3 | ERROR:#REF! | ERROR:#REF! |
| 4 | ERROR:#REF! | ERROR:#REF! |
| 5 | ERROR:#REF! | ERROR:#REF! |
| 6 | ERROR:#REF! | ERROR:#REF! |
| 7 | ERROR:#REF! | ERROR:#REF! |
| 8 | ERROR:#REF! | ERROR:#REF! |
| 9 | ERROR:#REF! | ERROR:#REF! |
| 10 | ERROR:#REF! | ERROR:#REF! |
| 11 | ERROR:#REF! | ERROR:#REF! |
| 12 | ERROR:#REF! | ERROR:#REF! |
| 13 | ERROR:#REF! | ERROR:#REF! |
| 14 | ERROR:#REF! | ERROR:#REF! |
| 15 | ERROR:#REF! | ERROR:#REF! |
| 16 | ERROR:#REF! | ERROR:#REF! |
| 17 | ERROR:#REF! | ERROR:#REF! |
| 18 | ERROR:#REF! | ERROR:#REF! |
| 19 | ERROR:#REF! | ERROR:#REF! |
| 20 | ERROR:#REF! | ERROR:#REF! |
| 21 | ERROR:#REF! | ERROR:#REF! |
| 22 | ERROR:#REF! | ERROR:#REF! |
| 23 | ERROR:#REF! | ERROR:#REF! |
| 24 | ERROR:#REF! | ERROR:#REF! |
| 25 | ERROR:#REF! | ERROR:#REF! |
| 26 | ERROR:#REF! | ERROR:#REF! |
| 27 | ERROR:#REF! | ERROR:#REF! |
| 28 | ERROR:#REF! | ERROR:#REF! |
| 29 | ERROR:#REF! | ERROR:#REF! |
| 30 | ERROR:#REF! | ERROR:#REF! |
| 31 | ERROR:#REF! | ERROR:#REF! |
| 32 | ERROR:#REF! | ERROR:#REF! |
| 33 | ERROR:#REF! | ERROR:#REF! |
| 34 | ERROR:#REF! | ERROR:#REF! |
| 35 | ERROR:#REF! | ERROR:#REF! |
| 36 | ERROR:#REF! | ERROR:#REF! |
| 37 | ERROR:#REF! | ERROR:#REF! |
| 38 | ERROR:#REF! | ERROR:#REF! |
| 39 | ERROR:#REF! | ERROR:#REF! |
| 40 | ERROR:#REF! | ERROR:#REF! |
| ERROR:#REF! |
File details come from the government source that posted it.