Landscape_Drawings.pdf
PDF 4 MB Posted
- Attached to
- Retrograde Landscaping Federal contract opportunity
- Solicitation number
- FA465918Q0044
About this file
Landscaping Drawings/Maps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1_with_Acknowledgement_of_Reciept.pdf | ||
| SOW.pdf | ||
| Seeding_Specification.pdf | ||
| Wage_Determination_WD_15-4973_Rev-7.pdf | ||
| Combo.docx | DOCX document | |
| Price_Schedule.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Retrograde Landscape Site Various Areas
JFSD 201535
GRAND FORKS AIR FORCE BASE
G-003
G E
N E
R A
L
N
O T
E S
GENERAL NOTES
EDGING: Edging shall be steel and 1/8 inch thick by 4 inches deep in 16 or 20-foot lengths. Metal edging shall be primed and painted a black color, treated with rust preventative and be factory finished. Anchoring stakes shall be of similar material and 16 to 18 inches long, located no more than 3'-0” O.C. Top of edging shall be installed no more than ½ inch above finish grade.
WEED BARRIER FABRIC: Shall be installed at all areas with new rock.
Weed barrier fabric shall be a minimum 5 oz. fabric. When installing, fabric should be stapled and overlap to prevent gaps and blowing.
MULCH: Rock mulch shall be tan limestone (Red Bryant) crushed rock, size 1”-2” matching the base standard limestone rock and shall be of normal trade consistency.
Rock shall be installed at a depth of 2-3” or as specified on design plans.
Hydro-seed: See Technical Provision 32 92 19
TREE REMOVAL: All trees marked for removal shall have stumps ground to industry standard or removed completely.
LANDSCAPE REMOVAL: Landscaping refers to all landscaping material to include mulch, vegetation, fabric, and edging. Ensure all removed areas have a minimum of 4" topsoil and covered with hydro-seed or rock as specified in drawing sheets. Area shall have positive drainage away from nearest buildings.
PLANT LIST:
NOTES
WORK AREA
SHEET 5
SHEET 6
SHEET 7
SHEET 8
SHEET 9
SHEET 10
SHEET 11
SHEET 12
SHEET 13
SHEET 14
SHEET 15
B R
AM
P
3-BAY
RAMP
600 SERIES
RAMP
MAIN GATE
TUSKEGEE AIRMEN BLVD
J
S
T
7TH A
VE
E I E
L S
O N
S
T
STEEN B
LVD
J
S
T
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
AREA OF WORK
475 sft
1348 sft 294 sft
90 sft
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
AREA OF WORK
258 sft
583 sft
169 sft
223 sft
164 sft
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
AREA OF WORK
914 sft 289 sft
198 sft
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
AREA OF WORK
INSTALL BLUECHIP
JUNIPER (14)
KARL FORESTER REED
GRASS (4)
INSTALL EDGING TO
MATCH EXISTING
APPROX 180 FT TOTAL
INSTALL KARL FORESTER
REED GRASS (28)
354 sft
354 sft
354 sft
354 sft
341 sft
341 sft
3497 sft
781 sft
365 sft1
4425sft 1
156 sft1
544 sft
BLUE CHIP
JUNIPER
KARL FORESTER
REED GRASS
STEEN B
LVD.
H
S
T
AREA OF WORK
REMOVE LANDSCAPING,
TREES, AND SHRUBS.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
REMOVE TWO TREES
WITHIN THE SAME
FOOTPRINT. ENSURE
MINIMUM 4" OF TOP SOIL.
REPLACE WITH
HYDRO-SEED.
34 sft
27 sft
56 sft
81 sft
57 sft
60 sft
226 sft
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
AREA OF WORK
342 sft
84 sft
157 sft
174sft
115 sft
221 sft
51 sft
222 sft
3656 sft 1
537 sft
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
AREA OF WORK
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED. LEAVE THE
ARBORVITAE.
490 sft
991 sft
70 sft 1166 sft
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
AREA OF WORK
2 REMOVE TREE.
INSTALL EDGING TO
MATCH EXISTING
APPROX 8 FT TOTAL
REMOVE EVERGREEN
2795sft 1
765 sft 1
134sft 1
152sft 1
300 sft
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
AREA OF WORK
2845sft
2988sft
386sft
388sft
583sft
747sft
747sft
747sft
386sft
747sft
388sft
583sft
442sft
480sft
442sft
409sft
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
AREA OF WORK
TO REMAIN
771sft
2565sft 1
722sft 1
126sft 1
179sft 1
193sft 1
2567sft
171sft
1318sft 1
724sft
82 sft
AREA OF WORK
REMOVE LANDSCAPING.
ENSURE MINIMUM 4" OF
TOP SOIL. REPLACE WITH
HYDRO-SEED.
496 sft
496 sft
738 sft
658 sft
1388 sft 1
| JFSD201535-G-001 |
| JFSD201535-G-002 |
| JFSD201535-G-003 |
| JFSD201535-C-100 |
| JFSD201535-LP-101 |
| JFSD201535-LP-102 |
| JFSD201535-LP-103 |
| JFSD201535-LP-104 |
| JFSD201535-LP-105 |
| JFSD201535-LP-106 |
| JFSD201535-LP-107 |
| JFSD201535-LP-108 |
| JFSD201535-LP-109 |
| JFSD201535-LP-110 |
| JFSD201535-LP-111 |
File details come from the government source that posted it.