Underground_Storage_Tanks_SOW.pdf

PDF 252 KB Posted

Attached to
Cleaning & Closure of Underground Storage Tanks Federal contract opportunity
Solicitation number
FA465918Q0043
Issued by
Department of the Air Force Air Mobility Command

About this file

Statement of Work for USTs

View the file

Other files for this federal contract opportunity

Other files attached to Cleaning & Closure of Underground Storage Tanks, newest first.
File Type Posted
RFQ_Amendment_1.pdf PDF
Combo.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVE

Buildings 664, 649, & 528

Underground Storage Tank Cleaning and Permanent Closure

Work Order # 73565

12 April 2017

1. GENERAL: The objective is to permanently close three (3) diesel fuel underground storage tanks

(USTs) and their respective associated piping in accordance with North Dakota Administrative Code

(NDAC) 33-24-08-61. The USTs included in this project are 528-1, 649-1, and 664-1 and are located on the Grand Forks Air Force Base, (GFAFB). Due to the UST’s location relative to adjacent buildings and other subsurface infrastructure, all three USTs will be abandoned in place, not removed.

The contractor shall provide all materials, plans, labor, equipment and supervision necessary to do the following:

2. PRINCIPAL FEATURES: The work to be performed includes, but is not limited to, the following:

2.1. Remove Diesel Fuel and Clean Underground Storage Tanks

2.1.1. Remove an estimated 6000 gallons of diesel fuel from UST 664-1 and clean out accumulated sludge in the UST and associated piping.

2.1.2. Remove all remaining fuel and clean out accumulated sludge from both UST 528-1 and

UST 649-1 and all associated piping. No estimates for remaining fuel, sludge amounts or lengths of piping are available for UST649-1 and UST 528-1. The size range for UST649-1 and UST 528-1 approximately 1000 to 1500 gallons.

2.1.3. All work must in accordance with Federal, State and local laws and regulations. See

Federal Underground Storage Tank Regulations (40 CFR Part 280) and state of North

Dakota Regulations (NDAC 33-24-08-61.1). All required permits, work authorizations necessary to do work on this work order will be the responsibility of the contractor to obtain and maintain.

2.2. Abandon in Place UST 664-1, UST 649-1, and UST 528-1

2.2.1. (NDAC 33-24-08-61.1) At least thirty days before beginning either permanent closure under subsections 2 and 3, or within another reasonable time period determined by the department, owners and operators must notify the department of their intent to permanently close. The required assessment of the excavation zone under section 33-24-

08-62 must be performed after notifying the department but before completion of the permanent closure.

2.2.1.1. Contractor should note the time constraint of “at least 30 days” for notification of the ND Health Department before beginning the process of UST closure.

2.2.2. ( N D A C 3 3 - 2 4 - 0 8 - 6 2 ) Assessing the site at closure

2.2.2.1. (NDAC 33-24-08-62.1) Before permanent closure is completed, contractors, with approval of the government, must measure for the presence of a release where contamination is most likely to be present at the underground storage tank site.

2.2.2.1.1. Under direction of the government and before the USTs can be certified for closure, the ground surrounding each tank will have to be sampled and tested for the presence of contamination.

2.2.2.2. (NDAC 33-24-08-62.1) In selecting sample types, sample locations, and measurement methods , contractors, with approval of government, must consider the method of closure, the nature of the stored substance, the type of backfill , the depth to ground water , and other factors appropriate for identifying the presence of a release.

2.2.2.2.1. Sample methodology, location and type must be selected under direction of the government.

2.2.2.2.2. Sampling methodology must consider: method of closure, nature of the stored substance, type of backfill, depth of ground water as well as other factors in order to identify the presence of contaminated substances.

3. PREWORK REQUIREMENTS: The contractor shall perform a pre-work inspection of the projects work area. If items are found in the inspection not previously identified in the task order, the contractor shall document on the contractor’s daily Quality Control report and report to these finding to the GFAFB Point of Contact, (POC) assigned to the project. The personnel assigned as POC for this contract will be introduced at the award of the contract.

4. CONSTRUCTION/SITE MANAGEMENT: The contractor shall perform a final cleanup and repair of the work area, including, but not limited to, any damage done to adjacent grounds, pavements or structures. Any damage shall be repaired and returned to conditions matching those before the contractor began work on this task order.

5. SPECIFICATIONS: All work shall be accomplished according to UFC 1-200-01 General Building

Requirements, Unified Facilities Guide Specifications, Engineering Technical Letters, and any manufacturer’s specification associated with materials and supplies. In the event of a conflict between any of the specifications or codes the most stringent standard will apply.

6. DRAWINGS: Drawings are required illustrating the sampling points around each of UST. As-built drawings depicting the existing conditions prior to award of this task order are available from the

Base Civil Engineering Drafting Section, building 410, Room 102.

7. SUBMITTALS:

7.1. Project Report shall be generated at the end of the project.

7.2. Communications with Federal and State Officials: All written communications between contractor and representatives of the state of North Dakota, sub-contractors, laboratories and consultants concerning this project shall be reported to the GFAFB Contracting Office throughout the execution of the project. A summary of these communications shall be included in the project report.

7.3. Gantt Schedule and Installation methods: A preliminary schedule of work shall be presented to the contracting office at the project kickoff meeting.

7.4. Manufacturer’s Specification Data Sheets: A MSDS shall be on job site of all materials of interest in the safety for personnel on site.

7.5. Drawings illustrating Sampling Sites: A drawing depicting the sampling points around each UTS shall be presented as a part of the Project Report.

7.6. Sampling Report of soil samples taken around USTs shall be included in the Project Report

8. PERMITS: The contractor shall obtain all applicable construction permits for this task order including, but not limited to, AF Form 103 Work Clearance Request, Confined Space Access Permit and utility prints for the work site, welding, burn permit, as well as any transportation permits or licenses required for the removal of hazardous materials.

9. HAZARDOUS MATERIALS: Records indicate that these facilities will contain hazardous materials.

The contractor’s proposal shall include appropriate measures for safety handling such materials. The contractor’s proposal shall also include the method disposal of such hazardous materials to be removed from facilities.

10. GENERAL SECURITY: Security requirements for Air Force facilities under control of Grand Forks

Air Force Base are specific and rigidly enforced. Levels of security include Restricted and

Controlled areas. Differing degrees of security are enforced at each area. Minimum security requirements, common not only to each of these secure areas, are also required for entry onto Grand

Forks AFB.

11. PROJECT AREA: This contract will entail work in Controlled Areas: This project’s work site does contain restricted/controlled areas; therefore entry into such areas shall be strictly controlled and monitored. Contractor personnel will need to be escorted while working within the controlled area.

12. CONDUCT REQUIREMENTS:

12.1. The contractor’s employees shall comply with all base traffic regulations and properly conduct themselves while on this base.

12.2. Work hours on this project shall be from 7:00 am to 4:00 pm Monday through Friday.

13. RESTRICTIONS: When working on base, all security regulations shall be obeyed.

MATERIAL SUBMITTAL SCHEDULE

Exterior Door Replacement for B 117 Warrior’s Inn

NOTE: Submittals required by specifications and/or drawings shall be made, regardless of whether listed below or not.

I

T

E

M

N

U

M

B

R

SECTION

AND

PARAGRAPH

NUMBER

ITEM DESCRIPTION

P

R

O

O

F

C

M

P

L

I

A

N

O

C

E

D

U

S

H

D

A

W

I

N

G

M

A

R

T

I

F

I

C

A

T

P

O

G

A

R

A

N

T

E

M

P

L

C

E

I

V

P

R

O

V

E

D

7.1 Project Report

7.2 Communications with Federal and State

Officials

X X

X

7.3 Gantt Schedule and Installation

methods.

X

7.4 Manufacturer’s Specification Data

Sheets

X X

7.5 Drawings illustrating Sampling Sites X

7.6 Sampling Report of soil samples taken

around USTs

X

File details come from the government source that posted it.