FA4659-15-R-0011_-_Amendment_4.pdf

PDF 401 KB Posted

Attached to
Repair HVAC Controls & Equipment Multi Facilities Federal contract opportunity
Solicitation number
FA4659-15-R-0011
Issued by
Department of the Air Force Air Mobility Command

About this file

FA4659-15-R-0011 - SF 30 - Amendment

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2A3E15097A003 JFSD200922

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment to FA4659-15-R-0011 - JFSD200922 for Repair HVAC Controls and Equipment Multi Facilities is to replace the Wage Determination dated 8 May 2015 w ith the current Wage Determination dated 31 July 2015.

The proposal due date for this solicitation has been extended from 5 Aug 15 to 7 Aug 15 at 2:00 PM CDT.

All other terms and conditions remain unchanged.

SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Aug-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4659-15-R-0011

X 9B. DATED (SEE ITEM 11)

29-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Aug-2015

CODE

319 CONTRACTING FLIGHT

575 TUSKEGEE AIRMEN BLVD

GRAND FORKS AFB ND 58205 6436

FA4659 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4659-15-R-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CHANGES SUMMARY

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 05-Aug-2015 03:00 PM to 07-Aug-2015 02:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been added by full text:

LIST OF DOCUMENTS, EXHIBITS

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

ITEM # of Pages

1. Building Wage Decision ND150022 Dated 07/31/2015 5

2. Schedule of Drawings 1

3. Waiver Green Procurement Form 1

4. Specifications Table of Contents 2

5. Questions and Answers #1 1

LIST OF EXTERNAL ATTACHMENTS

1. JFSD200922 Technical Specifications 490

2. JFSD200922 Drawings 39

3. JFSD200922 Material Submittal Schedule 8

4. Climatological Summary for Grand Forks AFB, ND 5

5. Financial Institution Reference Sheet 1

6. Past Performance Questionnaire 4

General Decision Number: ND150022 07/31/2015 ND22

Superseded General Decision Number: ND20140022

State: North Dakota

Construction Type: Building

County: Grand Forks County in North Dakota.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the

EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The

EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/02/2015

1 05/08/2015

2 07/31/2015

BOIL0647-006 01/01/2014

Rates Fringes

BOILERMAKER......................$ 32.75 26.42

ELEC1426-007 06/01/2014

ELECTRICIAN......................$ 27.59 11.37

* IRON0512-006 05/01/2015

IRONWORKER, STRUCTURAL...........$ 29.80 23.74

PLAS0633-003 05/01/2015

CEMENT MASON/CONCRETE FINISHER...$ 27.90 13.60

PLASTERER........................$ 23.92 12.83

PLUM0300-020 06/02/2014

PIPEFITTER.......................$ 31.44 12.67

SHEE9010-002 06/09/2014

SHEET METAL WORKER (HVAC Duct

Installation Only)...............$ 26.45 13.95

SUND2012-003 08/18/2014

BRICKLAYER.......................$ 23.47 12.34

CARPENTER........................$ 19.16 3.88

DRYWALL FINISHER/TAPER...........$ 21.48 6.66

DRYWALL HANGER AND METAL STUD

INSTALLER........................$ 19.60 4.34

INSULATOR - MECHANICAL

(Duct, Pipe & Mechanical

System Insulation)...............$ 15.80 2.60

LABORER: Common or General......$ 12.99 2.81

LABORER: Mason Tender - Brick...$ 15.32 0.00

LABORER: Mason Tender -

Cement/Concrete..................$ 14.54 3.41

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 26.00 3.82

OPERATOR: Crane.................$ 26.18 9.39

OPERATOR: Forklift..............$ 23.06 15.47

OPERATOR: Loader................$ 23.75 0.00

PAINTER (BRUSH AND ROLLER),

Excludes Drywall

Finishing/Taping.................$ 21.86 8.41

PLUMBER..........................$ 21.64 4.98

ROOFER...........................$ 16.37 2.84

SHEET METAL WORKER, Excludes

HVAC Duct Installation...........$ 27.27 7.76

TRUCK DRIVER: Dump Truck........$ 19.81 5.42

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Schedule of Drawings

Ref Number Drawing Name Page Number Date N/A 100% Submittal 1 of 39 3/18/2015 G-001 General Notes, Sheet Index & Keynotes 2 of 39 3/20/2015 G-002 Symbols and Abbriviations 3 of 39 3/20/2015 G-101 Vicinity Map 4 of 39 3/20/2015 G-501 General Details 5 of 39 3/20/2015 G-511 General Sections 6 of 39 3/20/2015 G-601 General Schedules 7 of 39 3/20/2015 101-M-101 Building 101 - Overall Plan 8 of 39 3/20/2015 101-M-610 Control Schematics B101 AHU-1 9 of 39 3/20/2015 101-M-611 Control Schematics B101 AHU-2 10 of 39 3/20/2015 101-M-612 Control Schematics B101 AHU-3 11 of 39 3/20/2015 101-M-613 Control Schematics B101 AHU-4 12 of 39 3/20/2015 101-M-614 Control Schematics B101 AHU-5 13 of 39 3/20/2015 105-E-101 Building 105 - Electrical Plan 21 of 39 3/20/2015 105-M-101 Building 105 - Overall Plan 14 of 39 3/20/2015 105-M-401 Building 105 - Enlarged Plans Mechanical Room 15 of 39 3/20/2015 105-M-610 Control Schematics B105 AHU-1 16 of 39 3/20/2015 105-M-611 Control Schematics B105 AHU-2 17 of 39 3/20/2015 105-M-612 Control Schematics B105 AHU-3 18 of 39 3/20/2015 105-M-613 Control Schematics B105 AHU-4 19 of 39 3/20/2015 105-M-614 Control Schematics B105 AHU-5 20 of 39 3/20/2015 308-M-101 Building 308 - Overall Plan 22 of 39 3/20/2015 308-M-610 Control Schematics B308 AHU-1 23 of 39 3/20/2015 308-M-611 Control Schematics B308 AHU-2 24 of 39 3/20/2015 308-M-612 Control Schematics B308 AHU-3 25 of 39 3/20/2015 308-M-613 Control Schematics B308 AHU-4 26 of 39 3/20/2015 308-M-614 Control Schematics B308 AHU-5 27 of 39 3/20/2015 308-M-615 Control Schematics B308 AHU-6 28 of 39 3/20/2015 308-M-616 Control Schematics B308 AHU-7 29 of 39 07/27/2015 541-M-101 Building 541 - Overall Plan 30 of 39 3/20/2015 541-M-610 Control Schematics B541 AHU-1 31 of 39 3/20/2015 541-M-611 Control Schematics B541 AHU-2 32 of 39 3/20/2015 541-M-612 Control Schematics B541 AHU-3 33 of 39 3/20/2015 699-M-101 Building 699 - Overall Plan 34 of 39 3/20/2015 699-M-401 Building 699 - Enlarged Plans 2nd Floor 35 of 39 3/20/2015 699-M-610 Control Schematics B607 AHU-1 36 of 39 3/20/2015 699-M-611 Control Schematics B607 AHU-2A,B 37 of 39 3/20/2015 699-M-612 VAV and Radiant Panel Schematics 38 of 39 3/20/2015 699-A-501 Building 699 - Details 39 of 39 3/20/2015

WAIVER GREEN PROCUREMENT FORM

(Documentation of Non Purchases)

This form is to be utilized by the contractor to record non-purchases of Green Procurement

Products Listed on the EPA’s Web Site www.epa.gov/cpg/products.htm

ITEM:______________________________________________

I have determined that the following Affirmative Procurement Product was considered for purchase but will not be purchased for the following reasons:

Item is not available within a reasonable period of time.

Date Needed: _________________ Date Item would be available: _______________

Item fails to meet a performance standard in the specifications.

Specifically, Item Cost More than the Green Procurement Item.

Price of Green Procurement Item ________________________________________

Price of Non-Green Procurement Item ____________________________________

Contractor Name Contractor Signature Date

COR/Inspector Name COR/Inspector Signature Date

Contracting Officer Name Contracting Officer Signature Date http://www.epa.gov/cpg/products.htm

Specifications Table of Contents

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 05 CERTIFICATION PAGE

00 31 26 EXISTING HAZARDOUS MATERIAL INFORMATION

00 31 26a ASBESTOS AND LEAD SURVEY DATA

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 TECHNICAL PROVISIONS

01 60 00 PRODUCT REQUIREMENTS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 19 SELECTIVE DEMOLITION

02 82 14 ASBESTOS HAZARD CONTROL ACTIVITIES

02 82 14a ASBESTOS HAZARD CONTROL APPENDIX

DIVISION 04 – MASONRY

04 22 00 CONCRETE UNIT MASONRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 00 THERMAL INSULATION

DIVISION 08 - OPENINGS

08 11 13 HOLLOW METAL DOORS AND FRAMES

08 71 00 DOOR HARDWARE

DIVISION 09 - FINISHES

09 91 23 INTERIOR PAINTING

DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING

23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 05 19 METERS AND GAGES FOR HVAC PIPING

23 05 23 GENERAL-DUTY VALVES FOR HVAC PIPING

23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 05 48.13 VIBRATION CONTROLS FOR HVAC

23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 13 DUCT INSULATION

23 07 19 HVAC PIPING INSULATION

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 21 13 HYDRONIC PIPING

23 23 00 REFRIGERANT PIPING

23 31 13 METAL DUCTS

23 33 00 AIR DUCT ACCESSORIES

23 36 00 AIR TERMINAL UNITS

23 62 00 PACKAGED COMPRESSOR AND CONDENSER UNITS

23 73 13 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

23 82 13 VALANCE HEATING AND COOLING UNITS

DIVISION 26 - ELECTRICAL

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 27 26 WIRING DEVICES

26 28 13 FUSES

26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

(End of Summary of Changes)

File details come from the government source that posted it. Updated .