FA4659-09-R-0004 Electrical Lines RFP.doc
DOC document 362 KB Posted
- Attached to
- RECOVERY - Repair Electrical lines - Base Supply to CE Complex. Federal contract opportunity
- Solicitation number
- FA4659-09-R-0009
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001.doc | DOC document | |
| Question and Answer.doc | DOC document | |
| Attachment 1 - Tech Provisions.pdf | ||
| Solicitation Cover Letter.doc | DOC document | |
| Attachment 3 - PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.doc | DOC document | |
| Attachment 2 - YEARLY CLIMATOLOGICAL SUMMARY FOR 2007-2003.doc | DOC document | |
| Attachment 1a - Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lump Sum |
Repair Power Lines
FFP
The contractor is to furnish all plant, labor, material, equipment, supplies and supervision necessary to complete JFSD 200352, Repair power line from Base Supply to CE Complex (Bldg 411) in accordance with the drawings and specifications. Work includes, but is not limited to:
1) Replace overhead power lines from substation to Tuskegee Airmen Blvd with new underground primary.
2) Provide a connection between the existing distribution system and new line as required.
3) Replace existing street lighting with new fixtures on steel poles to match base standards.
FOB: Destination
MILSTRIP: F2A3E19050A004
PURCHASE REQUEST NUMBER: F2A3E19050A004
SIGNAL CODE: A
NET AMT
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| 150 dys. ADC |
| 1 |
| 319 CES/CEC - F2A3E1 |
GLORIA DARBY
575 TUSKEGEE AIRMEN BLVD, BLDG 410, RM 15
GRAND FORKS AFB ND 58205-6219
701-747-4783
FOB: Destination F2A3E1
CLAUSES INCORPORATED BY REFERENCE
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
5352.232-9000 REMITTANCE ADDRESS (MAY 1996)
If the remittance address is different from the mailing address, enter the remittance address below. Failure to provide this information may impact payment.
WAWF
WIDE AREA WORKFLOW – RECEIPT AND ACCEPTANCE (WAWF-RA)
ELECTRONIC RECEIVING REPORT AND INVOICING INSTRUCTIONS
IN ACCORDANCE WITH DFARS 232.7002, USE OF ELECTRONIC PAYMENT REQUESTS IS MANDATORY. USE OF WAWF WILL SPEED UP YOUR PAYMENT PROCESSING TIME AND ALLOW YOU TO MONITOR YOUR PAYMENT STATUS ONLINE. THERE ARE NO CHARGES OR FEES TO USE WAWF.
Requests for payments must be submitted electronically via the Internet through the Wide Area WorkFlow – Receipt and Acceptance (WAWF-RA) system at https://wawf.eb.mil.
Questions concerning payment should be directed to the Defense Finance Accounting Services (DFAS) Limestone through the DFAS Centralized Customer Service number (800) 756-4571 (select option 2) or faxed to (866) 392-7091. Please have your order number and invoice number ready when contacting DFAS about payment status. You can also access payment information using the DFAS Vendor Pay Inquiry System (VPIS) web site at http://www.dfas.mil/money/vendor.
THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR RECEIVING REPORTS, INVOICES AND ADDITIONAL E-MAILS CORRECTLY THROUGH WAWF.
| CONTRACT NUMBER: |
| FA4659-09-C-CXXX |
| DELIVERY ORDER NUMBER: |
| N/A |
| TYPE OF DOCUMENT: |
| Construction Invoice |
| CAGE CODE: |
| Vendor Cage Code |
| ISSUE BY DODAAC: |
| FA4659 |
| ADMIN DODAAC: |
| FA4659 |
| INSPECT BY DODAAC: |
| N/A |
| SERVICE ACCEPTOR / SHIP TO: |
| BPN Number - F2A3CC |
| LOCAL PROCESSING OFFICE: |
| N/A |
| PAY OFFICE DODAAC: |
| F67100 (DFAS) |
SEND MORE E-MAIL NOTIFICATIONS:
| CONTRACT ADMINISTRATOR: |
| Ttroy.mccullough@grandforks.af.mil |
| CONTRACTING OFFICER: |
| jeremiah.snedker@grandforks.af.mil |
| ADDITIONAL NOTIFICATION: |
| james.mcguire@grandforks.af.mil |
BPN ver 02.04.2005 Section H - Special Contract Requirements
SPECIAL CONTRACT REQUIRMENTS
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H-1.
REQUIRED INSURANCE
(IAW FAR 28.306(b))
Reference FAR clause entitled “Insurance....” the contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
a. Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen’s compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
c. Automobile Liability Insurance. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
H-2.
FEDERAL HOLIDAYS
The following Federal Legal holidays are observed by this base:
New Year's Day
1 January
Martin Luther King's Birthday
Third Monday in January
Presidents Days
Third Monday in February
Memorial Day
Last Monday in May
Independence Day
4 July
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veterans Day
11 November
Thanksgiving Day
Fourth Thursday in November
Christmas Day
25 December
H-3.
PERFORMANCE AND BID REQUIREMENTS
(IAW FAR 28.101-2(b) and 28.102-2)
(Applicable only if the bid/contract price exceeds $100,000.00)
a. When notified by the contracting officer, the successful offeror shall submit a bid guarantee in the form of a firm commitment, e.g., bid bond (Standard Form 24) supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return any bid guarantee, other than bid bond, to the successful offeror upon execution of contractual documents and bond (including any necessary coinsurance or reinsurance agreements) as required by the bid as accepted.
b. The amount of the bid guarantee shall be 20% of the bid price or $3 million whichever is less.
c. If the successful bidder (offeror), upon acceptance of its offer by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder (offeror), the contracting officer may terminate the contract for default.
d. In the event the contract is terminated for default, the offeror is liable for any cost of acquiring the work that exceeds the amount of its offer and the bid guarantee is available to offset the difference.
e. Performance and Payment Bonds. In accordance with the Miller Act (40 U.S.C. 2701-270f), the offeror to whom award is made shall, within twenty (20) calendar days after the date of award, furnish a performance bond (Standard Form 25) and a Payment Bond (Standard Form 25a), each with good and sufficient surety or sureties acceptable to the Government.
(1) Performance Bond: The penal sum of the performance bond shall equal one hundred percent (100%) of the contract price.
(2) Payment Bond:
(i) The penal sum shall be one hundred percent (100%) of the contract price.
(ii) If the contract price increases, and additional amount equal to 100 percent of the increase.
f. The contractor will not be issued a Notice to Proceed or be allowed to start work prior to furnishing the requested bond, including any necessary insurance agreements.
H-4.
PREPARATION OF PROGRESS SCHEDULE AND REPORTS
The reports contemplated by the clause titled, "Schedules for Construction Contract" shall be accomplished on and in accordance with instructions pertaining to Contract Progress Schedule, and Contract Progress Report.
H-5.
PREPARATION OF MATERIAL APPROVAL SUBMITTALS
The submittals contemplated by the clause herein entitled "Material and Workmanship" shall be accomplished on and in accordance with instruction pertaining to AF Form 3000, Material Approval Submittal.
H-6
CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (AUGUST 2007)
(IAW AFFARS 5352.242-9000)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, and a completed form DD 1172 to obtain a vehicle pass.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with [insert any additional requirements to comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel Security Program Management,] citing the appropriate paragraphs as applicable.
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) Failure to comply with these requirements may result in withholding of final payment.
H-7. GFAFB Clause Nbr 5352.204-1000, Contractor Security Agreement CONTRACTOR SECURITY AGREEMENT (May 2004)
(a) The contractor shall be required to sign a Visitor Group Security Agreement within the time specified in the contract, or otherwise specified by the Contracting Officer, but in any event, before starting work on site. A separate agreement is required to be executed by each subcontractor at any tier. Typical agreement in full text is included here:
VISITOR GROUP SECURITY AGREEMENT
1. Contractual Agreement: This agreement, promulgated by Air Force Instruction 31-601, Industrial Security Program Management, Para 1.6.1.2, is entered into by the Installation Commander, Grand Forks Air Force Base, and (Company name) (hereafter referred to as visitor group). This agreement prescribes the specific actions to be taken by the visitor group’s employees and the Department of the Air Force (DAF) involved in the on-base contract performance at the visitor groups, on-base operating location, Grand Forks AFB. Responsibilities are delineated as follows:
NOTE: As used in this agreement, the terminology visitor group, contractor, company, and home office facility (HOF) are synonymous. Furthermore, the verbiage Air Force (AF) activity, unit, program/ project manager, Servicing Security Activity (SSA), etc., refers to entities representing the DAF in their appropriate and respective capacity.
a. Visitor Group Security Supervision. Under the terms of this agreement, the visitor group will operate per Air Force Instruction 31-601, Industrial Security Program Management and supplements thereto, as well as applicable unit security program operating instructions (OIs), plans and/or procedures of GFAFB. The installation SSA is 319 SFS and is responsible for providing security program oversight. The AF activity is the 319 ARW organization that is sponsoring the contract.
(1) The visitor group’s home office facility (HOF) will identify (in writing) to the SSA and the AF activity, an on-base employee to interface with and serve as the visitor group’s focal point for security related matters. Under the terms of this agreement, the identified employee per this paragraph will provide appropriate security program management assistance to the SSA and AF activity.
(2) All parties, the AF activity, contracting office (sponsor), visitor group, and SSA will perform duties specified by this agreement in a timely manner.
b. Standard Practice Procedures (SPP): Compliance with this agreement eliminates standard practice procedures publication requirement. The visitor group will use and comply with the AF activity’s unit security program operating instructions OIs, procedures, and/or requirements, per this agreement, and other applicable DOD or AF directives. This provision of the agreement is not intended, nor does it interfere with the visitor group’s internal management policies, procedures, or requirements unless stated otherwise.
c. Personnel Security Screening. Visitor group employees will be subject to security screening and a background investigation. The AF activity serves as sponsor for all visits by visitor group representatives.
(1) The visitor group’s HOF will identify on-base employees/representatives to the AF activity and the SSA in writing. Contractors will make a good faith effort to confirm identity and citizenship/legal immigration status of employees. This submission will serve as an Entry Authority List (EAL, see attachment 1 for format) for visitor group employees. The EAL will be forwarded to and be retained by the SSA. The EAL will contain: full name, SSN or INS-A number, contract number, citizenship or immigrant status verification, and driving privilege status. The EAL provided to the SSA will be verified/authenticated with original signature by the company’s site superintendent or security representative.
(2) Changes in visitor group employees will require amendments to the EAL. Deletions can be annotated on the EAL on file with the SSA. Additions will require a new
EAL with original signature.
(3) The Air Force industrial security program mgr/SSA will conduct an individual background investigation of contractor employees. Visitor group employees will complete an individual questionnaire, provide finger prints, and complete other required actions IAW applicable GFAFB security instructions prior to being issued access authorization.
(4) Unfavorable information will be adjudicated IAW DoD 5200.2 R Appendix I.
Employers will be notified of individuals who are not authorized to work on the installation and their associated disqualifying information; these individuals must be escorted off the base immediately. Employees denied access have a right to appeal under some circumstances IAW DoD 5200.2 R. The government may impose a penalty, fine or both on the employer for non-compliance and/or violations to include a “no entry” and “automatic” base debarment process. For all instances of perjury or falsification, penalties are without appeal provision. All delays for personal security clearances will be at the expense of the prime contractor; the contractor will not impose any liability for time lost on the contract to the US government.
d. Acceptable Proof of U.S. Citizenship or Immigrant Status and Identity for EAL. (Verified by Employer/Contractor)
(1) For individuals born in the United States, a valid birth certificate is the primary and preferred means of citizenship verification. Acceptable certificates must show that the birth record was filed shortly after birth and it must be certified with the registrar’s signature. It must bear the raised, impressed, or multicolored seal of the registrar’s office. The only exception is if a state or other jurisdiction does not issue such seals as a matter of policy. Uncertified copies of birth certificates are not acceptable. A delayed birth certificate is one created when a record was filed more than one year after the date of birth. Such a certificate is acceptable if it shows that the report of birth was supported by acceptable secondary evidence of birth. Secondary evidence may include: baptismal or circumcision certificates, hospital birth records, or affidavits of persons having personal knowledge about the facts of birth. Other documentary evidence can be early census, school, or family bible records, newspaper files, or insurance papers. All documents submitted as evidence of birth in the US shall be original or certified documents.
(2) If the individual claims citizenship by naturalization, a certificate of naturalization is acceptable proof of citizenship.
(3) If citizenship was acquired by birth abroad to a U.S. citizen parent or parents, the following are acceptable evidence: Certificate of Citizenship issued by the
Immigration and Naturalization Service (INS); or A Report of Birth Abroad of a
Citizen of the United States of America (Form FS-240); or A Certificate of Birth
(Form FS-545 or DS- 1350). A passport, current or expired, is acceptable proof of citizenship. A Record of Military Processing-Armed Forces of the United States
(DD Form 1966) is acceptable proof of citizenship, provided it reflects U.S.
citizenship.
(4) If the individual is an immigrant, a current INS work visa or permanent resident card with valid INS-A number is acceptable proof of legal immigration status.
e. Reports. The visitor group must immediately submit to the SSA, in writing, reports required under any of the situations outlined in AFI 31-601, Para 1.8 reporting requirement guidelines. Contractors shall establish such internal procedures as are necessary to ensure that cleared employees are aware of their responsibilities for reporting pertinent information to the SSA, the Federal Bureau of Investigation (FBI), or other Federal authorities as required by this manual, the terms of a contract, and US law. When the reports are unclassified and contain information pertaining to an individual, the Privacy Act of 1974 (5 U.S.C. 552a) permits withholding of that information from the individual only to the extent that the disclosure of the information would reveal the identity of a source who furnished the information to the US Government under an expressed promise that the identity of the source would be held in confidence. The fact that a report is submitted in confidence must be clearly marked on the report.
(1) Adverse Information. Contractors shall report any adverse information concerning any of their cleared employees. Adverse information is defined as any information that adversely reflects on the integrity or character of a cleared employee, that suggests his/her ability to safeguard sensitive information may be impaired, or that his/her access to the installation may not be in the interest of national security. Reports based on rumor or innuendo should not be made. The subsequent termination of employment does not obviate the requirement to submit this report. The report shall include the name and telephone number of the individual to contact for further information regarding the matter, signature, typed name, and title of the individual submitting the report. If the individual is employed on a federal installation, a copy of the report and its final disposition shall be furnished by the contractor to the commander or head of the installation.
(2) Suspicious Contacts. Contractors shall report efforts by any individual, regardless of nationality, to obtain critical information from an employee. In addition, all contacts by employees with known or suspected intelligence officers from any country or foreign organization, or any contact which suggests the employee concerned may be the target of an attempted exploitation by the intelligence services of another country or foreign organization, shall be reported and forwarded to Air Force Office of Special Investigation (OSI) for review.
(3) Change in Cleared Employee Status. Contractors shall report (1) the death; (2) a change in name; (3) the termination of employment; and (4) change in citizenship.
Such changes shall be reported by submission of a CSA designated form.
(4) Representative of a Foreign Interest. Contractors shall report any cleared employee who becomes a representative of a foreign interest (RFI) or whose status as a RFI is materially changed.
(5) Citizenship by Naturalization. Contractors shall report non-US citizens granted access who becomes a citizen through naturalization. Submission of this report shall be made on a CSA designated form and include the (1) city, county, and state where naturalized; (2) date naturalized; (3) county and (4) certificate number.
(6) Security violations. SSA coordinates and/or reports security violations committed by visitor group employees to the base contracting office, the AF activity, and the visitor’s group HOF, if and when appropriate. The visitor group must keep the AF industrial security manager and SSA advised of any reports submitted per AFI 71-105, Counterintelligence Awareness and Briefing Program.
(a) The AF activity’s unit commander appoints inquiry or investigation officials. Inquiry or investigation officials coordinate findings and reports with the appointing official and SSA.
(b) The visitor group’s HOF will advise the SSA of any changes in management, location, address, or contractual performance requirements.
f. Contractor Restricted Area Badges. When required for contract performance, the AF Form 1199CD Series, USAF Restricted Area Badge, will be issued to visitor group personnel for entry into USAF Restricted Areas on Grand Forks AFB. Entry credentials are issued at the request of the AF activity. Request for badge issuance must be supported by a current EAL.
g. Contractor Local Area Badges. When required for contract performance locally developed installation badges AF Fm 1199CD will be issued to visitor group personnel for entry into designated areas. Entry credentials are issued at the request of the AF activity.
h. Security Checks. Visitor group personnel will be scheduled to perform end-of-day security checks within their assigned work areas in accordance with AFI 31-101, The Air Force Installation Security Program, or the AF activity’s security program OI.
i. Protection of Government Resources. The visitor group will comply with AFI 31-101, and other security and safety OIs of the AF activity.
j. Clarification of Security Requirements. The visitor group will address inquiries or questions pertaining to the provisions of DOD 5200.2-R, 31-101, and AFI 31-601 to the SSA.
k. Foreign Involvement: Under the terms of this agreement, the visitor group is required to notify the AF activity and contracting office prior to any foreign involvement, regardless of access requirements or the sensitivity of information to be disclosed (classified or unclassified).
l. Review of this Agreement. All parties must review this agreement at least annually for accuracy. The AF activity is responsible for keeping this agreement current. Copies of reports may be made available to the visitor group for their files.
m. Other:
(1) Forms. The AF activity furnishes all government forms and applicable AFIs, OIs, and/or unit security plans required in support of this agreement.
(2) Sub-contracts. A VGSA shall be initiated whenever the HOF or on-base visitor group enters into a sub-contract arrangement with another contractor for Grand
Forks AFB. This VGSA must address the sub-contractor operation separately. It will be the responsibility of the prime contractor to ensure all sub-contactors are meeting the VGSA criteria. The AF activity, visitor group, or its HOF as applicable, and all sub-contractors must sign the agreement.
(3) Notification. Notify the SSA 30 days prior to contract completion or shutdown on
Grand Forks AFB in order to review contractor’s operations to ensure proper procedures per AFI 31-101, AFI 31-601, and this security agreement.
(4) Government Liability. Nothing in this agreement shall be construed to impose any liability on the part of the US government for injury to the agents, employees of the contractor, its sub-contractors, assignees, or other individuals acting for, or on, behalf of the contractor to the property of the same, nor shall anything in this agreement be construed to modify the provisions of existing contracts.
(5) Expenditure of Funds for Security. This agreement is not an authorization for a commitment of funds. Nothing in this agreement shall be construed to impose any liability on the part of the US government for injury to the agents, employees of the visitor group, its sub-contractors, assignees, or other individuals acting for, or on, behalf of the visitor group to the property of the same, nor shall anything in this agreement be construed to modify the provisions of existing contracts.
Chief, Security Forces
Visitor Group - Executive Manager
Date: ___________________________
Date: __________________________
(b) To carry out this agreement and validate acceptability of personnel intended to be authorized access to the Air Force installation, the contractor and each subcontractor at any tier, shall interview each employee. The interview will be documented on an interview form and signed by interviewee and the interviewer/reviewing official. The interview form can be obtained from the installation security agency or the contracting officer.
(c) Any proposed employee found to be unacceptable for entry onto Grand Forks AFB may be denied access to the installation. Entry access may be denied if security screening or background checks reveal any of the following:
(1) U.S. citizenship, immigration status, or Social Security Account Number cannot be verified.
(2) Barred from entry/access to any military installation or facility.
(3) Wanted by federal or civil law enforcement authorities, regardless of offense or violation.
(4) Conviction of firearms or explosives violation within the past three years.
(5) Incarcerated for 12 months or longer within the past three years, regardless of offense or violation.
(6) Conviction of espionage, sabotage, treason or terrorism, murder, sexual assault, armed assault/robbery, rape, child molestation, drug possession with intent to sell, or drug distribution.
(7) Name appears on any federal agency’s “watch list” or “hit list” for criminal behavior or terrorist activity.
(d) If any of the 7 factors identified in paragraph (c)are identified on a security or background check for an individual already under employment, that employee may be escorted off the installation immediately.
(e) Contractor may request exceptions to entry access by an individual through the contracting officer for any of the disqualifying factors identified in paragraph (c) on a case be case basis, and the installation commander must approve all exceptions before entry will be granted.
(f) In accordance with the termination clauses in this contract, the government may terminate this contract in whole or in part if the Contractor fails to comply with any provisions of this clause or executed visitor group security agreement.
(End of Clause)
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
| 52.202-1 |
| Definitions |
| JUL 2004 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| APR 1984 |
| 52.203-7 |
| Anti-Kickback Procedures |
| JUL 1995 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| JAN 1997 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| JAN 1997 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| SEP 2007 |
| 52.204-4 |
| Printed or Copied Double-Sided on Recycled Paper |
| AUG 2000 |
| 52.204-7 |
| Central Contractor Registration |
| APR 2008 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| SEP 2006 |
| 52.215-2 |
| Audit and Records--Negotiation |
| JUN 1999 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-11 |
| Price Reduction for Defective Cost or Pricing Data--Modifications |
| OCT 1997 |
| 52.219-3 |
| Notice of Total HUBZone Set-Aide |
| JAN 1999 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| MAY 2004 |
| 52.219-14 |
| Limitations On Subcontracting |
| DEC 1996 |
| 52.219-28 |
| Post-Award Small Business Program Rerepresentation |
| JUN 2007 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-4 |
| Contract Work Hours and Safety Standards Act - Overtime Compensation |
| JUL 2005 |
| 52.222-6 |
| Davis Bacon Act |
| JUL 2005 |
| 52.222-7 |
| Withholding of Funds |
| FEB 1988 |
| 52.222-8 |
| Payrolls and Basic Records |
| FEB 1988 |
| 52.222-9 |
| Apprentices and Trainees |
| JUL 2005 |
| 52.222-10 |
| Compliance with Copeland Act Requirements |
| FEB 1988 |
| 52.222-11 |
| Subcontracts (Labor Standards) |
| JUL 2005 |
| 52.222-12 |
| Contract Termination-Debarment |
| FEB 1988 |
| 52.222-13 |
| Compliance with Davis-Bacon and Related Act Regulations. |
| FEB 1988 |
| 52.222-14 |
| Disputes Concerning Labor Standards |
| FEB 1988 |
| 52.222-15 |
| Certification of Eligibility |
| FEB 1988 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| FEB 1999 |
| 52.222-26 |
| Equal Opportunity |
| MAR 2007 |
| 52.222-27 |
| Affirmative Action Compliance Requirements for Construction |
| FEB 1999 |
| 52.222-35 |
| Equal Opportunity For Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans |
| SEP 2006 |
| 52.222-36 |
| Affirmative Action For Workers With Disabilities |
| JUN 1998 |
| 52.222-37 |
| Employment Reports On Special Disabled Veterans, Veterans Of The Vietnam Era, and Other Eligible Veterans |
| SEP 2006 |
| 52.222-50 |
| Combating Trafficking in Persons |
| AUG 2007 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| AUG 2003 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-14 |
| Toxic Chemical Release Reporting |
| AUG 2003 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.226-1 |
| Utilization Of Indian Organizations And Indian-Owned Economic Enterprises |
| JUN 2000 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.228-2 |
| Additional Bond Security |
| OCT 1997 |
| 52.228-5 |
| Insurance - Work On A Government Installation |
| JAN 1997 |
| 52.228-11 |
| Pledges Of Assets |
| FEB 1992 |
| 52.228-14 |
| Irrevocable Letter of Credit |
| DEC 1999 |
| 52.228-15 |
| Performance and Payment Bonds--Construction |
| NOV 2006 |
| 52.229-3 |
| Federal, State And Local Taxes |
| APR 2003 |
| 52.229-4 |
| Federal, State, And Local Taxes (State and Local Adjustments) |
| APR 2003 |
| 52.232-5 |
| Payments under Fixed-Price Construction Contracts |
| SEP 2002 |
| 52.232-17 |
| Interest |
| OCT 2008 |
| 52.232-23 |
| Assignment Of Claims |
| JAN 1986 |
| 52.232-27 |
| Prompt Payment for Construction Contracts |
| OCT 2008 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--Central Contractor Registration |
| OCT 2003 |
| 52.233-1 |
| Disputes |
| JUL 2002 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.236-2 |
| Differing Site Conditions |
| APR 1984 |
| 52.236-3 |
| Site Investigation and Conditions Affecting the Work |
| APR 1984 |
| 52.236-5 |
| Material and Workmanship |
| APR 1984 |
| 52.236-6 |
| Superintendence by the Contractor |
| APR 1984 |
| 52.236-7 |
| Permits and Responsibilities |
| NOV 1991 |
| 52.236-8 |
| Other Contracts |
| APR 1984 |
| 52.236-9 |
| Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements |
| APR 1984 |
| 52.236-10 |
| Operations and Storage Areas |
| APR 1984 |
| 52.236-11 |
| Use and Possession Prior to Completion |
| APR 1984 |
| 52.236-12 |
| Cleaning Up |
| APR 1984 |
| 52.236-13 |
| Accident Prevention |
| NOV 1991 |
| 52.236-14 |
| Availability and Use of Utility Services |
| APR 1984 |
| 52.236-15 |
| Schedules for Construction Contracts |
| APR 1984 |
| 52.236-17 |
| Layout of Work |
| APR 1984 |
| 52.236-21 |
| Specifications and Drawings for Construction |
| FEB 1997 |
| 52.236-26 |
| Preconstruction Conference |
| FEB 1995 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.242-14 |
| Suspension of Work |
| APR 1984 |
| 52.243-4 |
| Changes |
| JUN 2007 |
| 52.243-5 |
| Changes and Changed Conditions |
| APR 1984 |
| 52.244-5 |
| Competition In Subcontracting |
| DEC 1996 |
| 52.246-21 |
| Warranty of Construction |
| MAR 1994 |
| 52.248-3 |
| Value Engineering-Construction |
| SEP 2006 |
| 52.249-2 Alt I |
| Termination for Convenience of the Government (Fixed-Price) (May 2004) - Alternate I |
| SEP 1996 |
| 52.249-10 |
| Default (Fixed-Price Construction) |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 Alt A |
| Central Contractor Registration (52.204-7) Alternate A |
| SEP 2007 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| DEC 1991 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country |
| DEC 2006 |
| 252.215-7000 |
| Pricing Adjustments |
| DEC 1991 |
| 252.223-7006 |
| Prohibition On Storage And Disposal Of Toxic And Hazardous Materials |
| APR 1993 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| DEC 2008 |
| 252.227-7033 |
| Rights in Shop Drawings |
| APR 1966 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.236-7000 |
| Modification Proposals-Price Breakdown |
| DEC 1991 |
| 252.236-7006 |
| Cost Limitation |
| JAN 1997 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| MAR 1998 |
| 252.247-7023 |
| Transportation of Supplies by Sea |
| MAY 2002 |
| 252.247-7024 |
| Notification Of Transportation Of Supplies By Sea |
| MAR 2000 |
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 calander days. The time stated for completion shall include final cleanup of the premises.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $257.33 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
(a) "Hazardous material", as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).
(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.
Material
Identification No.
(If none, insert "None")
(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.
(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.
(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.
(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.
(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.
(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:
(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to--
(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;
(ii) Obtain medical treatment for those affected by the material; and
(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.
(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.
(3) The Government is not precluded from using similar or identical data acquired from other sources.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)
As required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C. 6962(c)(3)(A)(i)), the offeror certifies, by signing this offer, that the percentage of recovered materials content for EPA-designated items to be delivered or used in the performance of the contract will be at least the amount required by the applicable contract specifications or other contractual requirements.
(End of provision)
CLAUSES INCORPORATED BY FULL TEXT
52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)
(a) Definitions. As used in this clause--
Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall--
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to 319th Contracting Squadron
Attn: Jeremiah Snedker
575 Tuskegee Airmen Blvd., Bldg 418
Grand Forks AFB, ND 58205-6436
(End of clause)
52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (JAN 2005)
(a) Definitions. As used in this clause--
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States, if the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to the construction material or components listed by the Government as follows: None
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) \1\
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation Supplement (48 CFR Ch. 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
252.204-7006 BILLING INSTRUCTIONS (OCT 2005)
When submitting a request for payment, the Contractor shall--
(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and
(b) Separately identify a payment amount for each contract line item included in the payment request.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (MAR 2008)
(a) Definitions. As used in this clause--
(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal Acquisition Regulation.
(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.
(3) Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when--
(1) The Contracting Officer authorizes use of another electronic form. With such an authorization, the Contractor and the Contracting Officer shall agree to a plan, which shall include a timeline, specifying when the Contractor will transfer to WAWF;
(2) DoD is unable to receive a payment request or provide acceptance in electronic form;
(3) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment; or
(4) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System).
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .