REPAIR_MAF_WATER_WELLS_II_QUESTIONS_2.pdf
PDF 43 KB Posted
- Attached to
- MAF WATER WELL II Federal contract opportunity
- Solicitation number
- FA4626-19-R-A016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REPAIR_MAF_WATER_WELLS_II_QUESTIONS_1.pdf | ||
| Amendment_MAF_Water_Wells_II.pdf | ||
| Attch_4_Drawings_Part_A.pdf | ||
| Attch_5_Wage_Determinations.pdf | ||
| Attch_2_Submittal_Schedule.pdf | ||
| Attch_3_Schedule_of_Drawings.pdf | ||
| Attch_4_Drawings_Part_B.pdf | ||
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Attch_6_Installation_Perimeter_Access_Control.pdf | ||
| FA462619RA016.pdf | ||
| Attch_1_Specifications_Repair_MAF_Water_Wells.pdf | ||
| Attch_10_-_Section_L_&_M.pdf | ||
| Attch_9_Subcontractor_Consent.doc | DOC document | |
| Attch_7_Special_Contract_Requirements.docx | DOCX document | |
| Attch_2_Submittal_Schedule.pdf | ||
| Attch_1_Specifications_Repair_MAF_Water_Wells.pdf | ||
| Attch_3_Schedule_of_Drawings.pdf | ||
| FA462619RA016.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. On print f-01 electrical site plan it stats we are to reuse the existing feeders to the old well because the distance from the building but on the pump house plan it shows use installing the grounding to the new well head but to follow the effluent piping? Is there a place to ground at the new SSMH-1?
New ground cables are not required at Foxtrot and Golf. New ground cables are to be installed only at the sites that will be getting new wells drilled. Please disregard the reference to ground cables to be run to new well head in detail 2 on sheets E1.3 and E1.5.
File details come from the government source that posted it.