Questions-Answers_1.docx

DOCX document 13 KB Posted

Attached to
Install Speed Tables Federal contract opportunity
Solicitation number
FA4626-18-R-0020
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to Install Speed Tables, newest first.
File Type Posted
Amendment_0002.docx DOCX document
Amended_Speed_Tables_Drawings_1_thru_7.pdf PDF
Amendment_0001.docx DOCX document
Attach_2_Submittal_Schedule.pdf PDF
Attach_3_Schedule_of_Drawings.docx DOCX document
Attch_9_Subcontractor_Consent.doc DOC document
Attach_7_Special_Contract_Requirements.docx DOCX document
Attach_4_Drawings.pdf PDF
Attach_6_Installation_Perimeter_Access.pdf PDF
Solicitation_18R0020.docx DOCX document
Attach_1_Specifications.pdf PDF
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attach_5_Wage_Determination.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4626-18-R-0020

Questions/Answers Voulme 1

1. Please clarify the 3/4" x 16" dowels are spaced 12" on center and are set at 4" off the bottom of the speed table. Are the rebar mats set 3" off the bottom of the speed table?

Our intent was to have the rebar mat 3" from the bottom of the speed table and the 3/4" x 16" dowels 4" from the bottom of the speed table.

2. What does Malmstrom want for the control joint cut pattern?

We did not specify a control joint pattern. Our intent was no individual slab with dimensions greater than 10 ft x 10 ft.

3. The control joint detail shows a tapered saw cut. Can a straight cut be substituted?

A straight cut can be substituted, but it will still need to be sealed. Our experience on the airfield is that the beveled edge is less susceptible to spalling than a straight edge. In this case, however, most of the cuts will likely be made in the direction of travel of snow removal equipment.

4. Is the construction joint detail to be used where the speed table is placed adjacent to the existing concrete curb?

Yes. We request the construction joint detail be used when placing the speed table against the existing curb. Dowels are requested only within the speed table itself.