Attach_2_Submittal_Schedule.pdf
PDF 104 KB Posted
- Attached to
- Install Speed Tables Federal contract opportunity
- Solicitation number
- FA4626-18-R-0020
About this file
Attachment 2 Material Submittal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions-Answers_1.docx | DOCX document | |
| Amendment_0002.docx | DOCX document | |
| Amended_Speed_Tables_Drawings_1_thru_7.pdf | ||
| Amendment_0001.docx | DOCX document | |
| Attach_3_Schedule_of_Drawings.docx | DOCX document | |
| Attch_9_Subcontractor_Consent.doc | DOC document | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_4_Drawings.pdf | ||
| Attach_6_Installation_Perimeter_Access.pdf | ||
| Solicitation_18R0020.docx | DOCX document | |
| Attach_1_Specifications.pdf | ||
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Attach_5_Wage_Determination.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MALMSTROM AFB, MONTANA
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-18-R-0020
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
B
Y
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements - 3.5 As-Built Field Data 2 3 D PTFI
2 01 00 00 General Requirements - 3.5 Final As Built Data 1 30 D AFI
3 01 00 00 General Requirements - 3.7 O&M Manuals 2 1 30 D AFI
4 01 00 00 General Requirements - 3.8 Equipment List 1 10 D
PTFI
5 01 00 00 General Requirements - 3.8 Guarantees 1 30 D AFI
6 01 00 00 General Requirements - 3.11 Start of Work Notification X 14 D -
PTSW
7 01 00 00 General Requirements - 3.12 Pre Final Inspection X 14 D PTE
8 01 00 00 General Requirements - 3.12 Final Inspection X 14 D
PTFI
01 00 00 General Requirements - 3.13 Work Clearance Request
(AF Form 103) X
14 D
PTSW
10 01 00 00 General Requirements - 3.13 Digging Near Utilities X 3 D PTE
11 01 00 00 General Requirements - 3.14 Utility Outages X 14 D PTE
01 00 00 General Requirements - 3.18 Quality Control Plan and
Specified Quality Control Submittals X
10 D
ANP
13 01 00 00 General Requirements - 3.19 Project Schedule Form 3064 X bi-monthly
14 01 00 00 General Requirements - 3.19 Project Report Form 3065 X bi-monthly
Construct Speed Tables 10th Avenue N.
Gate
DATE CONTRACTOR NOTIFIED
Number of Copies Required
AF Form 66
Submittal Schedule-4/6/2018
01330a-1
REQUIRED TECHNICAL SUBMITTALS
FA4626-18-R-0020
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Construct Speed Tables 10th Avenue N.
Gate
DATE CONTRACTOR NOTIFIED
Number of Copies Required
01 00 00 General Requirements - 3.20 Property Inventory
Checklist Form 1354 X 10 D PTFI
16 01 00 00 General Requirements - 3.26 Nuclear Densometers X 30 D
PTSW
01 00 10 Site Security - 1.1 Contractor Entry Authorization List
(CEAL)
X
14 D
PTSW
EAL
01 36 00 Environmental Protection - 2.3 Copies of Environmental
Permits X
5 D
PTSW
19 01 36 00 Environmental Protection - 4.3 Notice of Intent Package X 10 D
PTSW
01 36 00 Environmental Protection - 8.1.1 List of Hazardous
Materials (1360-5) with MSDSs X
10 D
PTSW
01 36 00 Environmental Protection - 8.1.2 Authorization Request
Worksheets with MSDSs X
10 D
PTSW
01 36 00 Environmental Protection - 8.1.4 Final Report of Actual
Quantities of Hazardous Materials X
10 D
PTFI
01 36 00 Environmental Protection - 11.3 Report of Solid Waste
Disposal and Diversion Attac. 4 (1360-4) X by 10th of month
01 36 00 Environmental Protection - 11.3 Waste Management Plan
(Attachment 1)
X 10 D AFI
01 36 00 Environmental Protection - Recovered Materials Written
Determination Form (Attachment 2)
X 10 D AFI
01 36 00 Environmental Protection - Recycled Material Use
Report (Attachment 3)
X 10 D AFI
01 36 00 Environmental Protection - Monthly Report of Solid
Waste Disposal & Diversion (Attachment 4) X Monthly
01 36 00 Environmental Protection - Hazardous Material List
(Attachment 5)
X 10 D AFI
AF Form 66
Submittal Schedule-4/6/2018
01330a-2
FA4626-18-R-0020
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Construct Speed Tables 10th Avenue N.
Gate
DATE CONTRACTOR NOTIFIED
Number of Copies Required
01 50 00 - Temp. Construction Facilities - 1.3 Dust Control
Responsible Person X
10 D
ANP
30 01 55 26 Traffic Control - 1.1 Traffic Control Plan X 10 D
PTSW
DIVISION 03 - CONCRETE
31 03 30 00 1.3.A Concrete Mix Design X
D
PS
10 D
PTSW
32 03 30 00 1.3.B Product Data X X X
PS
W
BB
10 D
PTSW
33 03 30 00 1.3.C Shop Drawing X
PS
W
BB
10 D
PTSW
34 03 30 00 1.3.D Cold Weather Placing Plan X
PS
W
BB
10 D
PTSW
35 03 30 00 1.3.E Hot Weather Placing Plan X
PS
W
BB
10 D
PTSW
36 03 30 00 1.3.F Batch Tickets X B
D
10 D
PTSW
36 03 30 00 1.3.G Preconstruction Submittals X X
PS
W
BB
10 D
PTSW
37 03 30 00 2.4.1 Joint Filler X
PS
W
BB
10 D
PTSW
DIVISION 32 - EXTERIOR
IMPROVEMENTS
38 Site Plan SPEED TABLES sign X X 10 D
PTSW
39 Site Plan Sign post/breakaway mount X X 10 D
PTSW
AF Form 66
Submittal Schedule-4/6/2018
01330a-3
FA4626-18-R-0020
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Construct Speed Tables 10th Avenue N.
Gate
DATE CONTRACTOR NOTIFIED
Number of Copies Required
40 32 10 01 2.1 Sealant X X 10 D
PTSW
41 32 10 01 2.2 Backer Rod X X 10 D
PTSW
42 32 17 23 1.2 Paint X X 10 D
PTSW
43 32 17 23 1.2 Reflective Beads X X 10 D
PTSW
AFI = After Final Inspection
ANP= After Notice to Proceed
ATT= After Test Taken
AE= After Event PTFI= Prior to Final Inspection
BBCW= Before Beginning Concrete Work
PTB= Prior To Bid
PTE=Prior to Event
PTSW= Prior to Start of Work
BD= Before Delivery
AF Form 66
Submittal Schedule-4/6/2018
01330a-4