Attach_4_List_of_Submittals.xls

XLS spreadsheet 51 KB Posted

Attached to
RHS Snow Barn Fire Protection System Federal contract opportunity
Solicitation number
FA4626-16-T-0005
Issued by
Department of the Air Force Global Strike Command

About this file

Submittals

View the file

Other files for this federal contract opportunity

Other files attached to RHS Snow Barn Fire Protection System, newest first.
File Type Posted
Response_to_Questions__1.pdf PDF
RHS_Snow_Barn.pdf PDF
100__DESIGN_MALMSTROM_AFB_SNOW_BARN.pdf PDF
Clarification.docx DOCX document
Attach_6_Drawings.pdf PDF
Attach_1_Specifications.pdf PDF
Attach_5_Schedule_of_Drawings.pdf PDF
Attach_2_Wage_Determination.docx DOCX document
Attach_3_Base_Entry.pdf PDF
FA4626-16-T-0005.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 02-14041Snow Barn Fire ProtectionFA4626-16-T-0005
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST REPORTSOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 01 - GENERAL REQUIREMENTS
101 00 00 General Requirements - 3.5 B. As-Built Field Data23d - PFI
201 00 00 General Requirements - 3.5 F. As-Built Field Data130 d - AFIAutoCAD CD
301 00 00 General Requirements - 3.7 A. O&M Instructions121d - ATT1 hardcopy, 2 CD's - see individual sections as well
401 00 00 General Requirements - 3.8 A. Contractor Furnished Equipment Data10d - BDEquipment List & Guarantees
501 00 00 General Requirements - 3.11 A. Start of Work notificationX5 d - PTE
601 00 00 General Requirements - 3.12 A. Notice of Pre-Final and Final InspectionsX14d - PTERed line “As-Built” dwgs shall be provided by the Contractor at final inspection.
701 00 00 General Requirements - 3.14 A. Utility OutagesX14 d - PSW
801 00 00 General Requirements - 3.18 B. QC Submittals310d - ANPQuality Control Plan
901 00 00 General Requirements - 3.20 A. 1354 checklist110d - PFIChecklist to be delivered to the contractor at Pre-Construction conference
1001 00 10 Security - 1.1 A. Identification of Employees14d - PSWEAL
1101 36 00 2.3 Environmental PermitsX5d - PSW
DIVISION 21 - FIRE SUPPRESSION
1221 13 13 Wet Pipe Sprinkler System - 1.4A Submittal Data3315 d ANP
13DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
1428 31 76 - Interior Addressable Fire Alarm System - 1.4 A/B Submittals (substitute products)3320d - PSW
1528 31 76 - Interior Addressable Fire Alarm System - 1.4C420d - PSW
1628 31 76 - Interior Addressable Fire Alarm System - 1.4D320d - PSWList of address names and descriptions
1728 31 76 - Interior Addressable Fire Alarm System - 1.4F Record Drawings and O&Ms320d - PSW
1828 31 76 - Interior Addressable Fire Alarm System - 1.4G314d - PSWNICET Technician Certificates, Contractor and Instllater State licenses
1928 31 76 - Interior Addressable Fire Alarm System - 1.4I314d - PSWManufacturer's certification/contractor authorization
2028 31 76 - Interior Addressable Fire Alarm System - 1.4J337d - PTRed line As-Builts, System Device address list, Prelim Test Reports
2128 31 76 - Interior Addressable Fire Alarm System - 1.4K3337d - AFISpare Parts list, O&M manuals, Completed Gov trng, Warranty letter
D - DaysPSW - Prior to Start WorkPFI - Prior to Final Inspection
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBD - Before DeliveryPT - Prior to Testing
ATT - After Test is TakenPBC - Prior to Beginning ConstructionPTW - Prior to Event
PRI - Prior to Final InspectionSRO - After Each Occurrence

&L&"Times New Roman,Regular"&12Attachment 4&R&"Times New Roman,Regular"&12FA4626-16-T-0005

File details come from the government source that posted it. Updated .