100__DESIGN_MALMSTROM_AFB_SNOW_BARN.pdf
PDF 6 MB Posted
- Attached to
- RHS Snow Barn Fire Protection System Federal contract opportunity
- Solicitation number
- FA4626-16-T-0005
About this file
Updated Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Response_to_Questions__1.pdf | ||
| RHS_Snow_Barn.pdf | ||
| Clarification.docx | DOCX document | |
| Attach_4_List_of_Submittals.xls | XLS spreadsheet | |
| Attach_6_Drawings.pdf | ||
| Attach_1_Specifications.pdf | ||
| Attach_2_Wage_Determination.docx | DOCX document | |
| Attach_3_Base_Entry.pdf | ||
| FA4626-16-T-0005.doc | DOC document | |
| Attach_5_Schedule_of_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering Flight CC
Utilities Lead
Electrical Lead
EA Superintendent
HVAC Lead
Project Manager
CEM
Structures Lead
Airfield Lead
Commander
Project Engineer
Safety
COL SPENCER
CMSGT COOLEY
CAPT BENTLEY
CAPT RICHWINE
TSGT HARTSON
MSGT AYALA
SRA MOLY
SSGT QUIMBY
SSGT MEYER
SSGT RUDOLPH
TSGT BAILEY
SSGT CAMPBELL
819 RED HORSE SQUADRON
CONSTRUCT SNOW BARN
MALMSTROM AFB, MT
PROJECT
LOCATION
Sheet List Table Number Title Description
1 COVER SHEET CS
2 SITE PLAN C-1
3 GRADING PLAN C-2
4 FLOOR PLAN A-1
5 ELEVATIONS A-2
6 VESTIBULE DETAIL A-3
7 FOUNDATION PLAN S-1
8 FOUNDATION DETAILS 1 S-2
9 FOUNDATION DETAILS 2 S-3
10 FOUNDATION DETAILS 3 S-4
11 ANCHOR BOLT DETAILS S-5
12 SLAB PLAN S-6
13 HVAC PLAN M-1
14 DETAILS M-2
15 PROPOSED WATERLINE DETAILS M-3
16 ELECTRICAL LIGHTING PLAN E-1
17 ELECTRICAL OUTLET PLAN E-2
18 ELECTRICAL CIRCUIT AND PANEL SCHEDULE E-3
19 ELECTRICAL CIRCUIT AND PANEL SCHEDULE 2 E-4
20 ELECTRICAL DETAILS E-5
11 2 " P
OLY
ET
HY
LE
NE
SH
UT
O
FF
V
AL
VE
VA
LV
E
BO
X
G S-
RE
TA
IN
MEN
T W
AL
L
SE
CT
IO
NA
LIZ
ER
SN
OW B
AR
N
8" W
AT
ER
M
AI
N
B M-3
A M-3
C M-3
D M-3
SU
PP
LY
D
RI
VE41
THERMAL LINE
PROPOSED GAS LINE
PROPOSED ELECTRICAL LINE
WATER CONTROL VALVE
GAS FITTING
VALVE BOX
FIRE HYDRANT
ELECTRICAL SECTIONALIZER
STORM SEWER
HEAT AND COOL VALVE/TEE
ASPHALT
SEEDED
LEGEND
GAS LINE
ELECTRICAL LINE
WASTE WATER LINE
STORM SEWER LINE
MAIN WATER LINE
WATER LINE SERVICE
FENCE
BOLLARDS
SEWER MANHOLE
WATER FITTING
WASTE MANHOLE
TRANSFORMER PAD
PROPOSED WATER LINE
RE
TA
IN
MEN
T W
AL
L
' 7 3 4
1.
5%
1.
5%
1.
5%
.5
1.5%
1.5%
1.5%
1.5%
1.5%
EXTENT OF DEMOLITION
' 6
/4
LEGEND
ASPHALT
SEEDED
LIMITS OF DEMOLITION
NOTE: SE GRADING SHALL NOT EXCEED 3H:1V
AFTER INITIAL 1.5% SLOPE FOR 10'
NOTES :
1. 4" TOPSOIL TO BE PLACED
IN SEEDED AREAS,
MINIMUM 85%
COMPACTION.
2. 1 CY OF COMPOST TO BE
MIXED INTO TOPSOIL PER
1000 SQUARE FEET.
3. DRYLAND GRASS SEED TO
BE PLACED IAW
MANUFACTURER'S
SPECIFICATIONS.
PIT WITH COVER
TRENCH DRAINS
33'
SUMP PUMP
1-1/4" X 24' DISCHARGE HOSE
6"
325 GAL ABOVE GROUND HOLDING TANK
20'-71 2" 17'-11
2" 25' 25' 17'-11 2" 20'-71
2"
24'-8" 25' 25' 25' 24'-8"
125'
90'
42'-3"
3'-2"
5'-8"
10"
10"
3" SCH 40 PVC 1% SLOPE
1 3 3 3 2
10"
10"
A
B
C
M-2
M-2
DOOR SCHEDULE
SYMBOL W H DOOR SWING
1 3'-0" 7'-0" LH
2 3'-0" 7'-0" RH
3 20'-0" 18'-0"
FINISHED FLOOR ELEVATION: 3382' 6 1/4"
M-2
11'-11"
22'
18'
4'
125'
18'-5" 5' 4'-71 2" 20' 4'-51
2" 20' 4'-51 2" 20' 4'-71
2"
3'
8'-8"
9"
5' 18'-5"
12'' 3''
46'
11'-6"
5"
22'
12'-3" 90'
6'
8'-8"
9"
8'3'-81 2"
25'6'
9"
5'
6'
10'
8'
FINISHED FLOOR
CMU BLOCK
SILL PLATE ATTACHED
W/ ANCHOR BOLTS
2"x4" FRAMING ATTACHED W/
GANG PLATES & HURRICANE STRAPS
16" O.C.
8'-8"
CORRUGATED ROOFING
6"X6"X10G WIRE MESH
4" MINUS BASE COURSE
IWA MT PUBLIC WORKS
SECTION 02235
SPECIFICATION
6"
12''
5''
6"
1'
NOTES: 1.SPLIT FACE BLOCK, 8", MEETS ASTM C90, ANTIQUE LINEN
FINISH FLOOR ELEVATION: 3382' 6 1/4"
2.MORTAR, >1800 PSI, MEETS ASTM C90
B
15'
20'
20'
20'
15'
24'-8" 25' 25' 25' 24'-8"
C
D
E
F
6 5 4 3 2 1
COVER:
CONCRETE CAST AGAINST PERMANENTLY
EXPOSED TO EARTH. 3"
CONCRETE EXPOSED TO EARTH OR WEATHER
#6 BAR + 2"
#5 BAR - 1 1/2"
6,000 PSI CONCRETE FOR PIER FOUNDATION
4,000 PSI CONCRETE FOR CONCRETE SLAB
48"
12"
16"
6'
4 #6 BARS
W/ 9" HOOK
6 #4 STIRRUPS
2 PLACED W/I 5" OF
TOP OF COLUMN
1 PLACED W/I 6"
OF TOP OF FOOTING
6'
6'16"
16"
8 #4 REBAR
EACH WAY
48"
12"
28"
8'
6 #8 REABAR
W/ 12" HOOK
5 #4 STIRRUPS
2 PLACED W/I 5" OF
TOP OF COLUMN
1 PLACED W/I 8"
OF TOP OF FOOTING
8'
8'28"
28"
11 #4 REBAR
EACH WAY
48"
12"
22"
6'
6 #6 BARS
W/ 9" HOOK
6 #4 STIRRUPS
2 PLACED W/I 5" OF
TOP OF COLUMN
1 PLACED W/I 6"
OF TOP OF FOOTING
6'
6'22"
22"
8 #4 REBAR
EACH WAY
3"
2"
2"
3" 61 2"61
2"
16"
16"
3"
2"
2"
3" 91 2"91
2"
22"
22"
4"
4"
12"
12"
12"12"
28"
28"
1-B,1-E,1-F, 6-A, 6-B, 6-E, 6-F 1-C, 1-D, 6-C, 6-D 2-F, 3-A, 3-F, 4-F, 4-A, 5-A, 5-F
48"
12"
6'
6 #8 REABAR
W/ 12" HOOK
5 #4 STIRRUPS
2 PLACED W/I 5" OF
TOP OF COLUMN
1 PLACED W/I 8"
OF TOP OF FOOTING
6'
6'22"
2"
8 #4 REBAR
EACH WAY
2"
48"
12"
34"
8'
8 #8 REABAR
W/ 12" HOOK
5 #4 STIRRUPS
2 PLACED W/I 5" OF
TOP OF COLUMN
1 PLACED W/I 8"
OF TOP OF FOOTING
8'
8'
11 #4 REBAR
EACH WAY
4"
34"
4"4"
2"141
4"81 4"
34"
4"
8"
4"
8" 123
4"
3"3"4"
4"
9"133 4"
4"
9"
9"
22"
2-A 1-A
8"
6"
4"
16" X 34" DIA DOWEL
@ 12" O.C.
1/2"
3/4"
1/2"2"
6"
8"
1/2"
3/4"
1/2"2"
4"
3"
15"
#4 REBAR @ 9" 0.C.
EACH WAY
ELEVATION 3381' 7 3
4 "
1'
TOPSOIL
ASPHALT
3"
4'
8'
6"
8"
15" BASECOURSE
10 MIL VAPOR
BARRIER
WIRE MESH
4" EXPANSION BOARD
SLAB
FOOTER
3" ASPHALT
8"
6"
4'
3'
3"
2"
1" MIN.
1" WIDE RED REFLECTOR TAPE
8"Ø STD. GALV. SCH. 40
STEEL POST (PAINT SAFETY YELLOW)
FILL PIPE W/CONC.
F'C = 3000 PSI. (MIN.)
CONCRETE COLLAR
F'C =3000 PSI. (MIN)
1'-8"
ROUND OR SQUARE
RETAINING WALL DETAIL
CONSTRUCTION JOINT CONTRACTION JOINT
CONCRETE SLAB TO EXTERIOR DETAIL
ISOLATION JOINT
BOLLARD DETAIL
D
G
F
E
10 MIL VAPOR BARRIER
10 MIL VAPOR BARRIER
NOTES: 1. 6"X6"X10G WIRE MESH.
2. 34" MINUS BASE COURSE IAW MT PUBLIC
WORKS SECTION 02235 SPECIFICATION PLACED IN 4"
LIFTS, MINIMUM 95% COMPACTION.
3. 58" MINUS ASPHALT, 93-97% COMPACTION
REQUIRED.
4. NATURAL MATERIAL REPLACED IN 6" LIFTS,
MINIMUM 95% COMPACTION.
5. MODIFIED PROCTOR USED FOR BASECOURSE
AND NATURAL MATERIAL. 50 BLOW MARSHALL TEST
USED FOR ASPHALT
JOINT SEALANT
2" BACKER ROD
15'
15'
15'
15'
15'
15'
15'-71 2" 15'-71
2" 15'-71 2" 15'-71
2"15'-71 2" 15'-71
2" 15'-71 2"
NOTES:
BROOM FINISH.
ISOLATION JOINTS AROUND
ALL COLUMNS
DOWEL @12" O.C
FINISH FLOOR ELEVATION:
3382' 6 1/4"
TROUGH ELEVATION:
3382' 2 3/4"
15'-71
S-4
F S-4
E S-4
SLAB LEGEND
CONSTRUCTION JOINTS
CONTRACTION JOINTS
DOWEL, 34" D, 16" L
SLOPE, MIN 1%
2 " BLACK IRON GAS LINE
25'
60'
5'
THERMOSTAT
T T
NOTES:
HEATERS/EXHAUST FANS PLACED AT 22'
HEATERS HUNG WITH UNI-STRUT
LEGEND
GAS LINE
NG INFRARED TUBE
MECHANICAL EQUIPMENT SCHEDULE
TYPE DESCRIPTION CAPACITIES ELECTRICAL
100K BtuH 120V
EXHAUST FAN 800 CFM @0" SP 1/25HP,120V,1-PH
SIDEWALL VENTING KIT 4" N/A N/A
N/A N/A
18" X 18" LOUVER 779 CFM N/A
NG INFRARED TUBE HEATER
ELSTER AL-425 TC-10 METER WITH
TEMPERATURE COMPENSATOR
ELSTER I813C PRESSURE REGULATOR
1'-117 8"
6-1/16"
6"
6"
ISOLATION JOINT
#4 REBAR
6"6" 18"
14"
36"
24"
1" 2" O.C.
6"
2"
2"
44" 36"
2"
2"
2"
2"
8"
2"
26"
2"
2"X2"X1
4" ANGLE IRON
2"
2" 2"
2"
8"
3"
8"
2"
10"10"
2"
36"
6" 6" 6"
TRENCH DRAIN CROSS SECTIONA
TRENCH DRAIN DETAIL
SUMP PIT DETAIL SUMP PIT CROSS SECTIONB DRAIN TO SUMP PIT SECTIONC
NOTES: 1. 1/3 HP SUBMERSIBLE SUMP PUMP, SENSOR ROD SWITCH, 1 1/2" DISCHARGE NPT, 31 FT MAX HEAD
2. TRENCH DRAIN GRATE RATED FOR HEAVY EQUIPMENT , 326PSI
3. SUMP PIT GRATE RATED FOR HEAVY EQUIPMENT, MAX RECOMMENDED LOAD OF 12,400 PSF W/12' SPAN
C M-3
B M-3
NOTE:
6" POST INDICATOR VALVE
NOTE:
MAIN LINE CONNECTION
COORDINATES:
N = 1196068.54
E = 1554190.52
EXIT SIGN COMBO
8-5/32"H X19-1/4"W,NICD LED
PENDANTHIGH BAY INDUCTION 125W INDUCTION
E
WALL
UNIVERSAL
150W INDUCTIONWALL PACK
WALL PACK 42W WALL
METALLIC WARNING TAPE 6" WIDE
CONDUCTIVE AND INDUCTIVE
NATIVE BACKFILL 85% COMPACTION
PLACED IN LAYERS NOT TO EXCEED 8"
CONCRETE
NOTES:
HIGH BAY INDUCTION LIGHTS HUNG AT 22'
WITH UNI-STRUT
CONTACTOR COIL IS 120V
SURFACE REPAIRED TO PRIOR STATE
MODIFIED PROCTOR USED FOR NATIVE BACKFILL
E
P
E
PHOTOCELL
S
S
CONTACTOR
STUB UP 2"
4" 157' RIGID PVC
THATS CONNECTED TO SECTIONALIZER
6'
6'
45 KVA 120/208 TRANSFORMER
DUCTBANK DETAIL
P
All OUTLET
PROTECTED BY
GFCI BREAKER
DEDICATED SUMP PUMP OUTLET
DEDICATED AIR COMPRESSOR DISCONNECT
NOTE:COVERS ARE PROTECTED
ON EXTERIOR OUTLETS
EXHAUST FAN
HEATER
SUB PANEL 1,3,5 SUB PANEL 2,4,6
SUB PANEL 7,9,11
1 2
6,8
SUB PANEL
13,15,17
DISCONNECT
NUMBER REFERS TO CIRCUIT
SCHEDULE
File details come from the government source that posted it. Updated .