Attach_2_Submittal_Schedule.xls
XLS spreadsheet 53 KB Posted
- Attached to
- Repair Steam Generators Federal contract opportunity
- Solicitation number
- FA4626-16-R-0017
About this file
Attach 2 Material Submittal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Response_to_Questions.docx | DOCX document | |
| Amendment_1.pdf | ||
| Site_Visit_Documents.pdf | ||
| Attach_1_Specifications.zip | ZIP file | |
| Attach_3_Schedule_of_Drawings.doc | DOC document | |
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Attach_4_Drawings.zip | ZIP file | |
| Attach_6_Base_Entry.pdf | ||
| Solicitation.doc | DOC document | |
| Attach_5_Wage_Determination.pdf | ||
| Attch_9_-_Subcontractor_Consent_Form.doc | DOC document | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 09-10039 | REPAIR STEAM GENERATORS, BUILDINGS 250 AND 1075 | FA4626-16-R-0017 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||||||
| 1 | 01 00 00 - 3.5.2 - Red Lines | 4 | PTFI | ||||||||||||||||||
| 2 | 01 00 00 - 3.5.2 - As Built Field Data | 2 | 3 PTFA | ||||||||||||||||||
| 3 | 01 00 00 - 3.8.1 - Contractor Furnished Equipment List | 4 | 3 PTFA | ||||||||||||||||||
| 4 | 01 00 00 - 3.8.2 - Guarantees | 4 | 10 PTFA | ||||||||||||||||||
| 5 | 01 00 00 - 3.10 - Shop Drawings as Required by Technical Specifications | 4 | 10 PTSA | ||||||||||||||||||
| 6 | 01 00 00 - 3.11 - Start of Work Notification | 1 | PTSW | ||||||||||||||||||
| 7 | 01 00 00 - 3.12 - Notice of Final Inspection | 1 | 14 PTFI | ||||||||||||||||||
| 8 | 01 00 00 - 3.13 Construction Near Utility Systems (AF Form 103) | 1 | PTSW | ||||||||||||||||||
| 9 | 01 00 00 - 3.14 - Utility Outage Notices | 1 | 14 PTO | ||||||||||||||||||
| 10 | 01 00 00 - 3.18.2 - Quality Control Plan | 4 | PTSW | ||||||||||||||||||
| 11 | 01 00 00 - 3.18.4 - Quality Control Records | 1 | EWD | ||||||||||||||||||
| 12 | 01 00 00 - 3.19 - 1354 Checklist (Property Inventory Checklist) | 4 | PTFI | ||||||||||||||||||
| 13 | 01 36 00 - 2.4 - Demolition Activities Notification | 4 | PTSW | ||||||||||||||||||
| 14 | 01 36 00 - 8.1.2 - Hazardous Materials Report EESOH-MIS 3952 | 4 | PTSW | ||||||||||||||||||
| 15 | 01 36 00 - 11.3 - Monthly Report of Solid Waste Disposal and Diversion | 4 | Monthly | ||||||||||||||||||
| 16 | 01 36 00 - 11.6 - Waste Management Plan | 4 | PTSW | ||||||||||||||||||
| 17 | 01 36 00 - 12.4 - Recovered Materials Written Determination Form | 4 | PTSW | ||||||||||||||||||
| 18 | 01 36 00 - 12.5 - Recycled Material Use Report | 4 | PTSW | ||||||||||||||||||
| DIVISION 02 - SITE CONSTRUCTION | |||||||||||||||||||||
| 19 | 02 07 00 1.3 Detailed Work Plan | 4 | PTSW | ||||||||||||||||||
| DIVISION 05 - METALS | |||||||||||||||||||||
| 20 | 05 51 00 1.4.A Product Data | 5 | PTSW | ||||||||||||||||||
| 21 | 05 51 00 1.4.B Shop Drawings | 5 | PTSW | ||||||||||||||||||
| 22 | 05 51 00 1.4.C Samples for Verification | 5 | PTSW | ||||||||||||||||||
| 23 | 05 51 00 1.4.D Delegated Design Submittal | 5 | PTSW | ||||||||||||||||||
| 24 | 05 51 00 1.6.A Installer Qualifications | 5 | PTSW | ||||||||||||||||||
| 25 | 05 51 00 1.6.C Welding Qualifications | 5 | PTSW | ||||||||||||||||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||||||
| 26 | 07 92 00 - 1.5.A Joint Sealants - Product Data | 4 | PTSW | ||||||||||||||||||
| 27 | 07 92 00 - 1.5.B Joint Sealants - Samples | 4 | PTSW | ||||||||||||||||||
| 28 | 07 92 00 - 1.5.C Joint Sealants - Product Certificates | 4 | PTSW | ||||||||||||||||||
| 29 | 07 92 00 - 1.5.D Joint Sealants - Compatibility and Test Adhesion Reports | 4 | PTSW | ||||||||||||||||||
| 30 | 07 92 00 - 1.5.E Joint Sealants - Product Test Reports | 4 | PTSW | ||||||||||||||||||
| DIVISION 08 - DOORS AND WINDOWS | |||||||||||||||||||||
| 31 | 08 31 13 1.5.A Product Data (door, frame) | 4 | PTSW | ||||||||||||||||||
| 32 | 08 31 13 - 1.3.B Shop Drawings | 4 | PTSW | ||||||||||||||||||
| 33 | 08 31 13 - 1.3.C Product Schedule | 4 | PTSW | ||||||||||||||||||
| DIVISION 09 - FINISHES | |||||||||||||||||||||
| 34 | 09 22 16 - 1.3.A Non-structural Metal Framing - Product Data (studs, runners, straps, backing plates, bridging, fasteners, suspension systems) | 4 | 40 D PTSW | ||||||||||||||||||
| 35 | 09 29 00 - 1.3.A Gypsum Board - Product Data (gypsum board, trim, joint treatment, screws) | 4 | 40 D PTSW | ||||||||||||||||||
| 36 | 09 29 00 - 1.3.B Gypsum Board - Asbestos Certification | 4 | 40 D PTSW | ||||||||||||||||||
| 37 | 09 29 00 - 1.3.C Gypsum Board - Samples | 4 | 40 D PTSW | ||||||||||||||||||
| 38 | 09 91 23 - 1.5.A Interior Painting - Product Data (paint, primer) | 4 | 40 D PTSW | ||||||||||||||||||
| 39 | 09 91 23 - 1.5.B Interior Painting - Samples for Initial Selection | 4 | 40 D PTSW | ||||||||||||||||||
| 40 | 09 91 23 - 1.5.D Interior Painting - Product List | 4 | 40 D PTSW | ||||||||||||||||||
| DIVISION 15 - MECHANICAL | |||||||||||||||||||||
| Plumbing, Section 22 05 11, Equipment ID, Firestopping, Pipe Hangers | 4 | 4 | PTSW | ||||||||||||||||||
| Plumbing Valves, Section 22 05 23, Valves, Balancing & Check Valves | 4 | 4 | PTSW | ||||||||||||||||||
| Water Distribution, Section 22 11 00, Pipe and Fittings | 4 | 4 | PTSW | ||||||||||||||||||
| Water Heaters, 22 34 00, Equipment | 4 | 4 | 4 | PTSW | |||||||||||||||||
| HV&AC Common, 23 05 11, Supports | 4 | 4 | 4 | PTSW | |||||||||||||||||
| Test and Balance, 23 05 93, Test & Balance Report | 4 | PTFI | |||||||||||||||||||
| Insulation, 23 07 11, Insulation | 4 | 4 | PTSW | ||||||||||||||||||
| Temperature Controls, 23 09 23, Temperature Controls | 4 | 4 | 4 | PTSW | |||||||||||||||||
| Hydronic Piping, 23 21 13, Piping and Fittings, Valves, Strainers | 4 | 4 | PTSW | ||||||||||||||||||
| Hydronic Pumps, 23 21 23, Equipment | 4 | 4 | PTSW | ||||||||||||||||||
| HV&AC Ducts, 23 31 00, Ductwork and Accessories | 4 | 4 | PTSW | ||||||||||||||||||
| Air Terminal Units, 23 36 00, Equipment | 4 | 4 | PTSW | ||||||||||||||||||
| Air Outlets and Inlets, 23 37 00, Air Outlets and Inlets | 4 | 4 | PTSW | ||||||||||||||||||
| Boilers, 23 52 33, Equipment | 4 | 4 | PTSW | ||||||||||||||||||
| Convection Heating and Cooling, 23 82 00, Equipment | 4 | 4 | PTSW | ||||||||||||||||||
| DIVISION 26 - ELECTRICAL | |||||||||||||||||||||
| 41 | 26 05 19 - Low-Voltage Electrical Power Conductors and Cables | 4 | 20 D ANTP | ||||||||||||||||||
| 42 | 26 05 33 - Raceway and Boxes for Electrical Systems | 4 | 20 D ANTP | ||||||||||||||||||
| 43 | 26 27 26 - Wiring Devices | 4 | 4 | 20 D ANTP | |||||||||||||||||
| 44 | 26 28 00 - Low-Voltage Circuit Protective Devices | 4 | 4 | 4 | 20 D ANTP | ||||||||||||||||
| 45 | 26 28 16 - Enclosed Switches and Circuit Breakers | 4 | 4 | 4 | 20 D ANTP | ||||||||||||||||
| 46 | 26 29 13.13 - Across-the-Line Motor Controllers | 4 | 4 | 4 | 20 D ANTP | ||||||||||||||||
| 47 | 26 29 23 - Variable-Frequency Motor Controllers | 4 | 4 | 4 | 20 D ANTP | ||||||||||||||||
| 48 | 26 71 00 - Electric Motors | 4 | 4 | 4 | 20 D ANTP | ||||||||||||||||
| Schedule of Abbreviations: | |||||||||||||||||||||
| AWC | = After Work Completed | BMF | = | Before Material Delivery | |||||||||||||||||
| PTSW | = Prior to Starting Work | SN | = | Advance Notification | |||||||||||||||||
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence | |||||||||||||||||
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection | |||||||||||||||||
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | |||||||||||||||||
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work | |||||||||||||||||
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | |||||||||||||||||
| PTFA | = Prior to Final Acceptance | PTSA | = | Prior To Start of Action | |||||||||||||||||
| ACA | = After Contract Award | PSS | = | Per Submittal Schedule |
&L&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA&CAttachment 2 &L&"Times New Roman,Regular"&12AF Form 66 &F-&D&C&"Times New Roman,Regular"&12 01330a-&P
REQUIRED TECHNICAL SUBMITTALS