Header_Repair.doc
DOC document 26 KB Posted
- Attached to
- Remove, Manufacure and Replace two header water pipe Federal contract opportunity
- Solicitation number
- FA4626-16-Q-0013
About this file
Updated Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q__A.docx | DOCX document | |
| Circulation_Pump_Header.pptx | PPTX presentation | |
| Q_ _A.docx | DOCX document | |
| COMBO.docx | DOCX document | |
| Distribution_Pump_Header.pptx | PPTX presentation | |
| SOW.pdf | ||
| COMBO.docx | DOCX document | |
| WD.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Distribution Header Repair
GENERAL
1.1 SUMMARY OF WORK:
1.1.1 The contractor shall provide all labor, equipment and materials to replace 2 header sections of the 16” High Temperature Hot Water distribution pipe. The pipe headers consist of (9) 10”, (2) 12”, (2) 3” and (1) 6” pipe branches; (7) 16” x 10” tees (2) 16” x 12” tees; (2) 10” , (2) 3”, and (1) 6” weld o-lets; (2) ½” and (1) ¾” thread o-lets; (2) 2” weld o-lets with pipe drain and (4) 2” gate valves
1.1.2 Contractor shall replace pipe hangers as needed
1.1.3 Contractor shall insulate all piping with non-asbestos insulation.
1.1.4 Contractor shall dispose of all materials removed during repair.
1.1.5 Contractor shall provide all documentation and inspections required by State and Federal requirements.
1.2 Specifications:
Process:
High Temperature Hot Water
Temperature:
500 Degrees F.
Pressure:
500 PSI
Material:
Black Iron Schedule 40 (1/2” wall thickness)
Size:
16” pipe headers
1.3 Execution:
1.3.1 Remove and dispose of all piping, insulation and materials being replaced
1.3.2 Manufacture (2) 16” pipe headers with (9) 10”, (2) 12”, (2) 3” and (1) 6” pipe branches; (7) 16” x 10” and (2) 16” x 12” tees; (2) 10” , (2) 3”, and (1) 6” weld o-lets; (2) ½” and (1) ¾” thread o-lets; (2) 2” weld o-lets with pipe drain and (4) 2” gate valves
1.3.3 Install replacement headers to meet all State and Federal requirements
1.3.4 Insulate all piping with non-asbestos insulation
1.3.5 Hydrostatic test and file all required documentation for repair required by Federal and State requirements
1.4 Government Support:
1.4.1 The government will be responsible for removal of all auxiliary equipment that would impede the execution of the contract. Testing requirements will be assisted by the government.
1.5 Period of Performance
1.5.1 Period of performance will be between June- August of Central Heating Plant maintenance overhaul.