Answers_to_Questions.docx

DOCX document 15 KB Posted

Attached to
Repair Earth Covered Magazines Federal contract opportunity
Solicitation number
FA4626-15-R-0014
Issued by
Department of the Air Force Global Strike Command

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Repair Earth Covered Magazines, newest first.
File Type Posted
Answers_to_Questions_2.docx DOCX document
201508251417.pdf PDF
Specifications.zip ZIP file
Wage_Determination.pdf PDF
Attch_7_-_Subcontractor_Consent_Form_-_10R0027.docx DOCX document
Base_Entry_Policy_Letter.pdf PDF
15-R-0014.pdf PDF
Submittal_Schedule.pdf PDF
SCHEDULE_OF_DRAWINGS.docx DOCX document
Drawings.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Answers to Questions

1. This is a request for clarification of the bid document specification’s sections 07 12 00, and 07 13 53. These sections specify many different types of water proofing. Please clarify the application relationship between these two specification sections with regards to Bid Item #0009 Install Magazine Waterproofing.

Answer:

Item #0009 is install magazine waterproofing system. Detail 3 on sheet C3.0 shows how to do this. Spec sections 07 13 53 and 07 12 00 define the requirements of the materials that are used detail 3.

2. Spec. sectections 07 12 00, & 07 13 53 specify four different types of water proofing systems. All of which are to be attached to clean and prepared concrete surface with a back fill protection board attached. The plans are asking for one system from spec.section 07 12 00, and one system from spec. section 07 13 53 be applied in no certain order. How is this to be achieved?

Answer:

1. Prepare the magazine vault exterior surface as described on Plate C20, Demolition Notes and Section 07 12 00.3.2.A.

2. Apply Elastomeric Sheet Waterproofing according to manufacturer's printed installation instructions per Sections 07 13 53.3.3. through 3.6.

3. Apply Built-up Bituminous Waterproofing per Sections 07 12 00.3.3 and 3.4.A. Water test described in 3.4.B is not required.

4. Apply protective covering prior to backfilling per Section 07 12 00.3.5. Protective covering may consist of fiberboard or other suitable protective covering as submitted by the Contractor and approved by the Contracting Officer.