Attch 2 Submittal Schedule.xls
XLS spreadsheet 55 KB Posted
- Attached to
- MAF Security Office Renovations Federal contract opportunity
- Solicitation number
- FA4626-10-R-0016
About this file
Attachment 2 (Material Submittal)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit List.pdf | ||
| 10-R-0016-AMD.zip | ZIP file | |
| Attch 3 Schedule of Drawings.pdf | ||
| Attch 4 Drawings.zip | ZIP file | |
| Attch 1 Specifications.zip | ZIP file | |
| Attch 5 Wage determination MT5.docx | DOCX document | |
| Attch 5 Wage determination MT6.docx | DOCX document | |
| Attch 5 Wage determination MT3.docx | DOCX document | |
| Attch 6 Past Performance Survey.docx | DOCX document | |
| Attch 7 - Subcontractor Consent Form - 10R0027.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 09-2001 | Missile Alert Facility Security Office Renovation | FA4626-10-R-0016 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO MISSILE ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| ARCHITECTURAL SUBMITTALS | |||||||||||||||||||||
| 1 | SPECIAL PROCEDURES - 01 00 00 1.6.B / 3.14 (Quality Control Plan) | 4 | 10 days ANTP | ||||||||||||||||||
| 2 | SPECIAL PROCEDURES - 01 00 00 3.3.A (Schedule of Materials Submittal) | 4 | 10 days ANTP | ||||||||||||||||||
| 3 | SPECIAL PROCEDURES - 01 00 00 3.7.B (Construction Schedule) | 4 | 10 days ANTP | ||||||||||||||||||
| 4 | SPECIAL PROCEDURES - 01 00 00 3.9.A (Work Notification) | 4 | Tues PTSW | ||||||||||||||||||
| 5 | SPECIAL PROCEDURES - 01 00 00 3.17 (As-Built Field Drawings) | 4 | EWD | ||||||||||||||||||
| 6 | SPECIAL PROCEDURES - 01 00 00 3.19.C (Storage Area Request) | 4 | Precon Conf | ||||||||||||||||||
| 7 | SPECIAL PROCEDURES - 01 00 00 3.22.A (Work Clearance Request) | 4 | PTSW | ||||||||||||||||||
| 8 | SPECIAL PROCEDURES - 01 00 00 3.27 (Temporary Security Office Trailer) | 4 | PT placing | ||||||||||||||||||
| 9 | SPECIAL PROCEDURES - 01 00 00 3.30 (Pre-Final Inspection Request) | 4 | PTFI | ||||||||||||||||||
| 10 | SPECIAL PROCEDURES - 01 00 00 Pg. 20-21 (Systems Checklist) | 4 | PTFI | ||||||||||||||||||
| 11 | SPECIAL PROCEDURES - 01 00 00 End of Section (Materials Approval Submittal) | 4 | PSS | ||||||||||||||||||
| 12 | MAF SECURITY - 01 10 01 3.1.A (EAL Data List) | 4 | 20 days PTSW | ||||||||||||||||||
| 13 | ENVIRONMENTAL PROCEDURES - 01 10 05 3.6.A (AF Form 3952 - Chemical/Hazardous Material Request / Authorization) | 4 | ACA | ||||||||||||||||||
| 14 | ENVIRONMENTAL PROCEDURES - 01 10 05 3.7.A (EPCRA Section 313 Form R - List of Hazardous Substances) | 4 | ACA | ||||||||||||||||||
| 15 | ENVIRONMENTAL PROCEDURES - 01 10 05 3.9 (Hazardous Waste Manifest) | 4 | 45 days SRO | ||||||||||||||||||
| 16 | ENVIRONMENTAL PROCEDURES - 01 10 05 3.10.E (Solid Waste Disposal Documents) | 4 | 20 days SRO | ||||||||||||||||||
| 17 | ENVIRONMENTAL PROCEDURES - 01 10 05 3.10.F (Non-Hazardous Solid Waste Diversion Report) | 4 | 10 days PTFA | ||||||||||||||||||
| 18 | ENVIRONMENTAL PROCEDURES - 01 10 05 Pg 13 (Waste Management Plan) | 4 | PTSW | ||||||||||||||||||
| 19 | MINOR DEMOLITION FOR REMODELING - 02 41 19 1.2B (Demolition Schedule) | 4 | 20 days ANTP | ||||||||||||||||||
| 20 | MINOR DEMOLITION FOR REMODELING - 02 41 19 1.2C | 4 | PTSW | ||||||||||||||||||
| 21 | MINOR DEMOLITION FOR REMODELING - 02 41 19 1.3B (Project Record Documents) | 4 | AFI | ||||||||||||||||||
| 22 | METAL FABRICATIONS - 05 50 00 1.3B | 4 | 20 days AFI | ||||||||||||||||||
| 23 | FINISH CARPENTRY - 06 20 00 1.3B | 4 | 20 days AFI | ||||||||||||||||||
| 24 | ARCHITECTURAL WOOD CASEWORK - 06 41 00 1.3B | 4 | 20 days AFI | ||||||||||||||||||
| 25 | ARCHITECTURAL WOOD CASEWORK - 06 41 00 1.3C | 4 | 20 days AFI | ||||||||||||||||||
| 26 | SOLID SURFACING FABRICATIONS - 06 61 16 1.3B | 4 | 20 days AFI | ||||||||||||||||||
| 27 | SOLID SURFACING FABRICATIONS - 06 61 16 1.3C | 4 | 20 days AFI | ||||||||||||||||||
| 28 | SOLID SURFACING FABRICATIONS - 06 61 16 1.4B | 4 | At FI | ||||||||||||||||||
| 29 | FOAMED-IN-PLACE INSULATION - 07 21 19 1.3B | 4 | 20 days PTSW | ||||||||||||||||||
| 30 | FOAMED-IN-PLACE INSULATION - 07 21 19 1.3C | 4 | PTSW | ||||||||||||||||||
| 31 | FOAMED-IN-PLACE INSULATION - 07 21 19 1.3D | 4 | 20 days PTSW | ||||||||||||||||||
| 32 | BULLET RESISTANT PANELS - 07 42 45 1.4B | 4 | 30 days PTSW | ||||||||||||||||||
| 33 | BULLET RESISTANT PANELS - 07 42 45 1.4C (Test Reports) | 4 | 30 days PTSW | ||||||||||||||||||
| 34 | BULLET RESISTANT PANELS - 07 42 45 1.4D | 2 | 10 days PTSW | ||||||||||||||||||
| 35 | BULLET RESISTANT PANELS - 07 42 45 1.4E | 4 | PTSW | ||||||||||||||||||
| 36 | BULLET RESISTANT PANELS - 07 42 45 1.4F | 4 | 30 days PTSW | ||||||||||||||||||
| 37 | JOINT SEALERS - 07 90 00 - 1.3B | 4 | 20 days PTSW | ||||||||||||||||||
| 38 | JOINT SEALERS - 07 90 00 - 1.3C | 4 | PTSW | ||||||||||||||||||
| 39 | JOINT SEALERS - 07 90 00 - 1.3D | 4 | PTSW | ||||||||||||||||||
| 40 | STANDARD STEEL FRAMES - 08 12 14 1.3B | 4 | 20 day AFI | ||||||||||||||||||
| 41 | STANDARD STEEL FRAMES - 08 12 14 1.3C | 4 | 20 days PTSW | ||||||||||||||||||
| 42 | STANDARD STEEL FRAMES - 08 12 14 1.3D | 4 | PTSW | ||||||||||||||||||
| 43 | STANDARD STEEL FRAMES - 08 12 14 1.3E | 4 | 20 days PTSW | ||||||||||||||||||
| 44 | FLUSH WOOD DOORS - 08 14 16 1.3B | 4 | 20 days AFI | ||||||||||||||||||
| 45 | FLUSH WOOD DOORS - 08 14 16 1.3C | 4 | 20 days PTSW | ||||||||||||||||||
| 46 | FLUSH WOOD DOORS - 08 14 16 1.3C1 | 2 | 10 days PTSW | ||||||||||||||||||
| 47 | FLUSH WOOD DOORS - 08 14 16 1.3D | 4 | PTSW | ||||||||||||||||||
| 48 | FLUSH WOOD DOORS - 08 14 16 1.3E | 4 | 20 days PTSW | ||||||||||||||||||
| 49 | DOOR HARDWARE - 08 71 00 1.4B | 4 | 20 days AFI | ||||||||||||||||||
| 50 | DOOR HARDWARE - 08 71 00 1.4C (Hardware Schedule) | 4 | 20 days PTSW | ||||||||||||||||||
| 51 | DOOR HARDWARE - 08 71 00 1.4D | 4 | PTSW | ||||||||||||||||||
| 52 | DOOR HARDWARE - 08 71 00 1.5A | 4 | At FI | ||||||||||||||||||
| 53 | DOOR HARDWARE - 08 71 00 1.5B (Keys) | 4 | At FI | ||||||||||||||||||
| 54 | GLAZING - 08 80 00 1.3B | 4 | 20 days PTSW | ||||||||||||||||||
| 55 | GLAZING - 08 80 00 1.3C | 4 | 20 days PTSW | ||||||||||||||||||
| 56 | GYPSUM BOARD ASSEMBLIES - 09 21 16 1.3B | 4 | 20 days PTSW | ||||||||||||||||||
| 57 | ACOUSTICAL PANEL CEILINGS - 09 51 13 1.3B | 4 | 20 days AFI | ||||||||||||||||||
| 58 | ACOUSTICAL PANEL CEILINGS - 09 51 13 1.3C | 4 | 20 days PTSW | ||||||||||||||||||
| 59 | ACOUSTICAL PANEL CEILINGS - 09 51 13 1.3D | 2 | 10 days PTSW | ||||||||||||||||||
| 60 | ACOUSTICAL PANEL CEILINGS - 09 51 13 1.3E | 2 | 10 days PTSW | ||||||||||||||||||
| 61 | ACOUSTICAL PANEL CEILINGS - 09 51 13 1.3F | 4 | PTSW | ||||||||||||||||||
| 62 | FLUID-APPLIED FLOORING - 09 67 00 1.3B | 4 | 30 days PTSW | ||||||||||||||||||
| 63 | FLUID-APPLIED FLOORING - 09 67 00 1.3C | 2 | 20 days PTSW | ||||||||||||||||||
| 64 | FLUID-APPLIED FLOORING - 09 67 00 1.3D | 4 | 30 days PTSW | ||||||||||||||||||
| 65 | FLUID-APPLIED FLOORING - 09 67 00 1.3E | 4 | PTSW | ||||||||||||||||||
| 66 | FLUID-APPLIED FLOORING - 09 67 00 1.4B | 4 | At FI | ||||||||||||||||||
| 67 | PAINTING AND COATING - 09 90 00 1.4B | 4 | 20 days PTSW | ||||||||||||||||||
| 68 | PAINTING AND COATING - 09 90 00 1.5B | 4 | At FI | ||||||||||||||||||
| 69 | FOOD SERVICE EQUIPMENT - 11 40 00 1.3B | 4 | 30 days PTSW | ||||||||||||||||||
| 70 | FOOD SERVICE EQUIPMENT - 11 40 00 1.3C | 4 | 30 days PTSW | ||||||||||||||||||
| 71 | FOOD SERVICE EQUIPMENT - 11 40 00 1.4B | 4 | At FI | ||||||||||||||||||
| 72 | MONITOR MOUNTS - 11 52 15 1.3B | 4 | 30 days PTSW | ||||||||||||||||||
| 73 | MONITOR MOUNTS - 11 52 15 1.4B | 4 | 20 days AFI | ||||||||||||||||||
| 74 | WINDOW SHADES - 12 21 15 1.2B | 4 | 20 days AFI | ||||||||||||||||||
| 75 | WINDOW SHADES - 12 21 15 1.2C | 4 | 20 days PTSW | ||||||||||||||||||
| 76 | WINDOW SHADES - 12 21 15 1.2D | 2 | 10 days PTSW | ||||||||||||||||||
| MECHANICAL SUBMITTALS | |||||||||||||||||||||
| 77 | Pipe materials, fittings and accessories - 22 11 00 1.3 and 22 13 00 1.3 | 4 | 20 days PTSW | ||||||||||||||||||
| 78 | Plumbing fixture, WC-1, including flush valve and faucet - 22 40 00 1.3 | 4 | 20 days PTSW | ||||||||||||||||||
| 79 | Refrigerant pipe insulation - 23 07 00 1.3 | 4 | 20 days PTSW | ||||||||||||||||||
| 80 | Refrigerant pipe - 23 23 00 1.4 | 4 | 20 days PTSW | ||||||||||||||||||
| 81 | Exhaust fan EF-1 - 23 34 00 1.3B | 4 | 30 days PTSW | ||||||||||||||||||
| 82 | Heat pump EVAP-1/CU-1 23 81 43 1.4 | 4 | 30 days PTSW | ||||||||||||||||||
| 83 | PROJECT RECORD DRWINGS - 22 05-00 1.12 | 4 | 20 days AFI | ||||||||||||||||||
| 84 | OPERATION AND MAINTENANCE DATA - 22 05 00 1.13 | 4 | 10 days PTFI | ||||||||||||||||||
| 85 | Potable water certificate - 22 11 00 3.4 | 4 | AFI | ||||||||||||||||||
| ELECTRICAL SUBMITTALS | |||||||||||||||||||||
| 86 | GENERAL PROVISIONS FOR ELECTRICAL WORK 26 05 00 - 2.01A | 4 | 20 days PTSW | ||||||||||||||||||
| 87 | GENERAL PROVISIONS FOR ELECTRICAL WORK 26 05 00 - 2.01A (Installation layout drawings) | 4 | 20 days AFI | ||||||||||||||||||
| 88 | GENERAL PROVISIONS FOR ELECTRICAL WORK 26 05 00 - 2.01B | 4 | 20 days PTSW | ||||||||||||||||||
| 89 | GENERAL PROVISIONS FOR ELECTRICAL WORK 26 05 00 - 2.02 (Project Record Documents) | 4 | 10 days AFI | ||||||||||||||||||
| 90 | GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.05B | 4 | 20 days PTSW | ||||||||||||||||||
| 91 | GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.05C (Test Reports) | 4 | 20 days PTSW | ||||||||||||||||||
| 92 | GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.05D | 4 | 20 days PTSW | ||||||||||||||||||
| 93 | GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 16060 - 1.06B (Project Record Documents) | 4 | EWD | ||||||||||||||||||
| 94 | HANGERS & SUPPORTS 26 05 29 - 1.03B | 4 | 20 days PTSW | ||||||||||||||||||
| 95 | HANGERS & SUPPORTS 26 05 29 - 1.03C | 4 | PTSW | ||||||||||||||||||
| 96 | ELECTRICAL IDENTIFICATION - 26 05 29 - 1.03B | 4 | 20 days PTSW | ||||||||||||||||||
| 97 | ELECTRICAL IDENTIFICATION - 26 05 29 - 1.03C | 4 | 10 days AFI | ||||||||||||||||||
| 98 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 26 05 19 - 1.03B | 4 | 20 days PTSW | ||||||||||||||||||
| 99 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 26 05 19 - 1.03C (Test Reports) | 4 | 20 days PTSW | ||||||||||||||||||
| 100 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 26 05 19 - 1.03D | 4 | PTSW | ||||||||||||||||||
| 101 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 26 05 19 - 1.03E (Project Record Documents) | 4 | EWD | ||||||||||||||||||
| 102 | CONDUIT 26 05 32 - 1.03B | 4 | 20 days PTSW | ||||||||||||||||||
| 103 | CONDUIT 26 05 32 - 1.03C (Project Record Documents) | 4 | PTSW | ||||||||||||||||||
| 104 | BOXES 26 05 33 - 1.03B | 4 | 20 days PTSW | ||||||||||||||||||
| 105 | BOXES 26 05 33 - 1.03C (Project Record Documents) | 4 | EWD | ||||||||||||||||||
| 106 | WIRING DEVICES 26 27 26 - 1.03B | 4 | 20 days PTSW | ||||||||||||||||||
| 107 | WIRING DEVICES 26 27 26 - 1.03C | 4 | PTSW | ||||||||||||||||||
| 108 | EQUIPMENT WIRING CONNECTIONS 26 05 03 - 1.03B | 4 | 20 days PTSW | ||||||||||||||||||
| 109 | EQUIPMENT WIRING CONNECTIONS 26 05 03 - 1.03C | 4 | PTSW | ||||||||||||||||||
| 110 | EQUIPMENT WIRING CONNECTIONS 26 05 03 - 1.04B (Project Record Documents) | 4 | EWD | ||||||||||||||||||
| 111 | ENCLOSED SWITCHES 26 05 03 - 1.03B | 4 | 20 days PTSW | ||||||||||||||||||
| 112 | ENCLOSED SWITCHES 26 05 03 - 1.03C (Project Record Documents) | 4 | EWD | ||||||||||||||||||
| 113 | ENCLOSED SWITCHES 26 05 03 - 1.03D | 4 | 20 days AFI | ||||||||||||||||||
| 114 | ENCLOSED SWITCHES 26 05 03 - 1.03E (Operation and Maintenance Manuals) | 4 | 20 days AFI | ||||||||||||||||||
| 115 | INTERIOR LUMINAIRES 26 51 00 - 1.03B | 4 | 20 days AFI | ||||||||||||||||||
| 116 | INTERIOR LUMINAIRES 26 51 00 - 1.03C | 4 | 20 days PTSW | ||||||||||||||||||
| 117 | INTERIOR LUMINAIRES 26 51 00 - 1.03D | 4 | PTSW | ||||||||||||||||||
| 118 | INTERIOR LUMINAIRES 26 51 00 - 1.03E (Operation and Maintenance Data) | 4 | AFI | ||||||||||||||||||
| 119 | STRUCTURED TELECOMMUNICATIONS CABLING & ENCLOSURES 27 13 43 - 1.03B | 4 | 20 days PTSW | ||||||||||||||||||
| 120 | STRUCTURED TELECOMMUNICATIONS CABLING & ENCLOSURES 27 13 43 - 1.03C | 4 | 20 days PTSW | ||||||||||||||||||
| 121 | STRUCTURED TELECOMMUNICATIONS CABLING & ENCLOSURES 27 13 43 - 1.03D (MANUFACTURER'S QUALIFICATIONS) | 4 | 20 days PTSW | ||||||||||||||||||
| 122 | STRUCTURED TELECOMMUNICATIONS CABLING & ENCLOSURES 26 13 43 - 1.03E (INSTALLER QUALIFICATIONS) | 4 | 20 days PTSW | ||||||||||||||||||
| 123 | STRUCTURED TELECOMMUNICATIONS CABLING & ENCLOSURES 26 13 43 - 1.03F (TEST PLAN) | 4 | 30 days PTFI | ||||||||||||||||||
| 124 | STRUCTURED TELECOMMUNICATIONS CABLING & ENCLOSURES 26 13 43 - 1.03G (Field Test Reports) | 4 | 20 days AFI | ||||||||||||||||||
| 125 | STRUCTURED TELECOMMUNICATIONS CABLING & ENCLOSURES 26 13 43 - 1.03H (PROJECT RECORD DOCUMENTS) | 4 | EWD | ||||||||||||||||||
| 126 | STRUCTURED TELECOMMUNICATIONS CABLING & ENCLOSURES 26 13 43 - 1.03I (Operation and Maintenance Data) | 4 | 20 days AFI | ||||||||||||||||||
| Schedule of Abbreviations: | |||||||||||||||||||||
| AWC | = After Work Completed | BMF | = | Before Material Delivery | |||||||||||||||||
| PTSW | = Prior to Starting Work | SN | = | Advance Notification | |||||||||||||||||
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence | |||||||||||||||||
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection | |||||||||||||||||
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | |||||||||||||||||
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work | |||||||||||||||||
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | |||||||||||||||||
| PTFA | = Prior to Final Acceptance | PT | = | Prior To | |||||||||||||||||
| ACA | = After Contract Award | PSS | = | Per Submittal Schedule |
&L&"Times New Roman,Regular"&12Attachment 2&C&"Times New Roman,Regular"&12PROJECT TITLE&R&"Times New Roman,Regular"&12FA4626-xx-R-xxxx &L&"Times New Roman,Regular"&12AF Form 66 02:
&F-&D&C&"Times New Roman,Regular"&12 SS-&P
REQUIRED TECHNICAL SUBMITTALS