Attachment 2: Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2-4, add RA Clauses.doc | DOC document | |
| Pre-Proposal Site Visit Agenda.doc | DOC document | |
| Amendment 3, wage determination.doc | DOC document | |
| Spec.zip | ZIP file | |
| Attch 4 Drawings.zip | ZIP file | |
| attch 6 Past Performance .docx | DOCX document | |
| Attch 3 Schedule of Drawings.doc | DOC document | |
| Solicitation.doc | DOC document | |
| DBA MT080001.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
FA4626- 09-R-0015
SUBMITTAL SCHEDULE
| Repair Vehicle Ground Points at Launch Facilities |
| NZAS 00-2003A |
SCHEDULED DATES
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| Sub. |
| Spec. Sec.- |
| Type |
| No. of |
| Date |
| Date |
| Date |
| To Contr. |
| Resubmittal |
| ID |
| Page No. & |
| of |
| Description of Material |
| Sub |
| Rec. Fr. |
| to |
| Ret Fr |
| Approved/ |
| Due From |
| Remarks |
| No. |
| Para. No. |
| Submittal |
| Days |
| Contr. |
| CEL |
| CEL |
| Disapproved |
| Contracting |
| 1 |
| 1000-8 |
| Letter |
| Qual. Cont Pln |
| 10 after NTP |
Para 3.14-B
1000-12
Para 3.17-D
1001-1 Para 3.1-B Drawings & elec media
Data list AS-Built Drawings
Entry Authority List 10 WD after Final Inspection
20 Working Days before site work started
| 4 |
| 1360-11 Para 12.1 |
| Filled in form |
| Qty of recycled products used on project |
| 10 WD before final acceptance |
| 5 |
| 2225-4-1 |
| Data |
| Aggregate gradation and Plasticity Index |
| 10 PSW |
Para 1.2.1
| 6 |
| 2225-4-1 |
| Cut sheets |
| Manufacturer data |
| 10 PSW |
Para. 1.2.2
| 7 |
| 2225-4-1 |
| Work clear. Rqst |
| Digging Permit |
| 10 PSW |
Para 3.1
2225-4-2 Para 3.5 2225-4-3 Para 4.1 Test results Mix design Compaction tests soil-crete/lean-crete mix 5 WD prior to each site acceptance inspection
10 PSW
| 10 |
| 3300-4 Para II-F |
| Cut sheets |
| Manufacturer instructions for use of pre-mixed concrete product |
| 10 PSW |
| 11 |
| 16120-1 |
| Cut sheet |
| Grounding receptacle |
| 10 PSW |
Para 1.2.1
| 12 |
| 16120-1 |
| Cut sheet |
| Steel Rod |
| 10 PSW |
Para 1.2.2
| 13 |
| 16120-1 Para 3.1.2 |
| Test results |
| Vibro ground Test from each site |
| 5 WD prior to each site acceptance inspection |
| 14 |
| 16130-1 |
| Cut sheets |
| Manufacturer data on ½” conductor |
| 10 PSW |
Para 1.2.1
| 15 |
| 16130-1 |
| Installation |
| Manufacturer instructions for crimping or |
| 10 PSW |
| Para 1.2.2 |
| Directions |
| Manufacturer instructions for exo. welding |
| 16 |
| 16130-1 |
| Cut sheets |
| Splice Kits |
| 10 PSW |
Para 1.2.3
CDR = Calendar Days after Receipt
PSW = Prior to Start of Work ATOS = After Taking Sample PFA = Prior to Final Acceptance
ANTP = After Notice to Proceed
PTS = Prior To Shipment PTI = Prior To Installation
SUBMITTAL SCHEDULE – 1