Attach 2, Submittal Schedule.doc

DOC document 85 KB Posted

Attached to
RECOVERY-- NZAS002003A - Repair Launch Facility Electrical Grounds Federal contract opportunity
Solicitation number
FA4626-09-R-0015
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 2: Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY-- NZAS002003A - Repair Launch Facility Electrical Grounds, newest first.
File Type Posted
Amendment 2-4, add RA Clauses.doc DOC document
Pre-Proposal Site Visit Agenda.doc DOC document
Amendment 3, wage determination.doc DOC document
Spec.zip ZIP file
Attch 4 Drawings.zip ZIP file
attch 6 Past Performance .docx DOCX document
Attch 3 Schedule of Drawings.doc DOC document
Solicitation.doc DOC document
DBA MT080001.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

FA4626- 09-R-0015

SUBMITTAL SCHEDULE

Repair Vehicle Ground Points at Launch Facilities
NZAS 00-2003A

SCHEDULED DATES

1
2
3
4
5
6
7
8
9
10
11
Sub.
Spec. Sec.-
Type
No. of
Date
Date
Date
To Contr.
Resubmittal
ID
Page No. &
of
Description of Material
Sub
Rec. Fr.
to
Ret Fr
Approved/
Due From
Remarks
No.
Para. No.
Submittal
Days
Contr.
CEL
CEL
Disapproved
Contracting
1
1000-8
Letter
Qual. Cont Pln
10 after NTP

Para 3.14-B

1000-12

Para 3.17-D

1001-1 Para 3.1-B Drawings & elec media

Data list AS-Built Drawings

Entry Authority List 10 WD after Final Inspection

20 Working Days before site work started

4
1360-11 Para 12.1
Filled in form
Qty of recycled products used on project
10 WD before final acceptance
5
2225-4-1
Data
Aggregate gradation and Plasticity Index
10 PSW

Para 1.2.1

6
2225-4-1
Cut sheets
Manufacturer data
10 PSW

Para. 1.2.2

7
2225-4-1
Work clear. Rqst
Digging Permit
10 PSW

Para 3.1

2225-4-2 Para 3.5 2225-4-3 Para 4.1 Test results Mix design Compaction tests soil-crete/lean-crete mix 5 WD prior to each site acceptance inspection

10 PSW

10
3300-4 Para II-F
Cut sheets
Manufacturer instructions for use of pre-mixed concrete product
10 PSW
11
16120-1
Cut sheet
Grounding receptacle
10 PSW

Para 1.2.1

12
16120-1
Cut sheet
Steel Rod
10 PSW

Para 1.2.2

13
16120-1 Para 3.1.2
Test results
Vibro ground Test from each site
5 WD prior to each site acceptance inspection
14
16130-1
Cut sheets
Manufacturer data on ½” conductor
10 PSW

Para 1.2.1

15
16130-1
Installation
Manufacturer instructions for crimping or
10 PSW
Para 1.2.2
Directions
Manufacturer instructions for exo. welding
16
16130-1
Cut sheets
Splice Kits
10 PSW

Para 1.2.3

CDR = Calendar Days after Receipt

PSW = Prior to Start of Work ATOS = After Taking Sample PFA = Prior to Final Acceptance

ANTP = After Notice to Proceed

PTS = Prior To Shipment PTI = Prior To Installation

SUBMITTAL SCHEDULE – 1

MALMSTROM AIR FORCE BASE