ANSWERS FOR THE CONTRACTOR:
| Are Scaled Drawings available? |
| Some Scaled drawings should be available from the CEOBASE Section. |
| Are Ceilings Suspended? Or Hard Lid? |
| Some areas are open (mechanical rooms) some areas have drop ceiling and some areas have drywall ceilings. |
| Are there existing Cable Trays for wiring above ceilings? |
| Cable trays do not exist above ceilings everything is in conduit and will need to be in conduit. |
| Can Existing Wiring be utilized? |
| There is no existing wire between the new location of the panels and the mechroom so all wiring between existing and new would need to be new. |
| Is a “UPS” required? If so, What Time/Power Duration is required? |
| This question is answered in the SOW |
| Are “Or Equal” Equipment substitutions allowed? |
| This question is answered in the SOW any equipment installed shall to be compatible with the original fire panel to ensure reliability |
| Is “Plenum Wire” acceptable? |
| Plenum wire is acceptable in open ceiling applications to devices only and may be used in conduit runs and must be in conduit |
| Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t? |
| If after hours access is needed, please coordinate with customer upon award. |
| What is the height of Exterior Cameras? (If any) |
| N/A |
| Please provide/post other “Q & A” requests. |
| All questions asked are represented here. |
| Please provide a BILL OF MATERIALS |
| A bill of material will be the responsibility of the contractor to provide when they determine how they will make the repair/modifications to the fire detection system. |