Attachment - Questions and Answers.pdf

PDF 429 KB Posted

Attached to
Ross Kitchen Equipment Federal contract opportunity
Solicitation number
FA462022QA142
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Ross Kitchen Equipment, newest first.
File Type Posted
Amendment 3.pdf PDF
Attachment 1 - SOW with Salient Characteristics Revised 07JUL22.pdf PDF
Amendment 2.pdf PDF
Attachment 1 - SOW with Salient Characteristics Revised27JUN22.pdf PDF
FA462022QA142 Combo Revised27JUN22.pdf PDF
Amendment 1.pdf PDF
Attachment 1 - SOW with Salient Characteristics.pdf PDF
FA462022QA142 Combo.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA462022QA142 – Ross Kitchen Equipment

Questions and Answers

1. Government agencies usually dispose of equipment – Could you please confirm whether you require the contractor to dispose of old equipment? We will dispose of equipment.

2. Does the existing equipment that is being removed match the brands listed in the specs? No.

3. Can you provide the elevation of the site for purposes of gas equipment? Approximately 2,461 feet above sea level.

4. For CLIN 0007 (Gas tilting skillet braising pan), is a faucet needed? No, one is in place.

5. Is there a table/stand needed for CLIN 0010 (Countertop Griddle)? Stand is covered in CLIN 0011.

6. Is CLIN 0005 (Gas Combi Oven) and CLIN 0008 (Gas Fryer) Natural Gas as well? Yes.

7. Do you require gas hoses for the gas equipment? Gas hoses will be needed for installation. Yes.

8. Can you provide the door hinging to CLIN 0001 (Pass Thru Heated Cabinet)?

Please specify if front door is right-hinged or left-hinged Please specify if rear door is right-hinged or left-hinged Either is fine.

9. Regarding the Turbo Air Refrigeration (multiple items):

Turbo Air is the only manufacturer that offers the self-cleaning condenser in the refrigeration. Please confirm if this is a mandatory feature or if other similar items can be considered that do not have a self-cleaning condenser. Other similar items can be considered that do not have a self-cleaning condenser.

10. Will this be awarded per line item or as a whole? This will be awarded per line item.

11. Are we able to ship the equipment directly to the jobsite or does it need to be received and delivered by our installer as well? Not all of the items require installation. For items that do require installation it is preferred to be installed at time of delivery.

12. Solicitation states “Pricing shall include removal, disposal, installation, training, maintenance, and warranty of items..” What kind of maintenance is referred to here?

There is no maintenance aspect for this requirement. The word was entered in error. This amendment removes the word from the solicitation.

File details come from the government source that posted it. Updated .