Attach_1-Specifications.pdf
PDF 3 MB Posted
- Attached to
- Repair Fire Protection/Detection Systems, WSA Federal contract opportunity
- Solicitation number
- FA4613-13-R-0017
About this file
Attachment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2-Change_Response_Date.pdf | ||
| Amendment_1-Fire_Protection _Detection_Systems.pdf | ||
| Attach_3-WD-WY23.pdf | ||
| Attach_5-Past_Performance_Questionnaire.docx | DOCX document | |
| Attach_4-GHLN-11-1039_Drawings.pdf | ||
| Solicitation-Repair_Fire_Protection Detection_Systems_WSA.pdf | ||
| Attach_2-GHLN_11-1039_Schedule_of_Material_Submittals.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Repair Fire Protection/Detection Systems WSA Building 1151
PROJECT #: GHLN 11-1039
PREPARED BY:
90TH
CES/CEC
BASE CIVIL ENGINEERING SQUADRON
F.E. WARREN AIR FORCE BASE
DoD Unclassified Controlled Nuclear Information
Date: Mar 2013
Repair Fire Protection/Detection Systems WSA Bldg 1151
F.E. WARREN AFB, WY GHLN-11-1039 Mar 2013
TOC PAGE 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 41 00 BID SCHEDULES
DIVISION 01 - GENERAL REQUIREMENTS
10 00 GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16.00 20 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 75 00 STARTING AND ADJUSTING
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
DIVISION 09 - FINISHES
09 06 90 COLOR SCHEDULE
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 90 00 PAINTS AND COATINGS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
TOC PAGE 2
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 23 00 REFRIGERANT PIPING
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
-- End of Project Table of Contents --
SECTION 01 10 00 PAGE 1
SECTION 01 10 00
GENERAL REQUIREMENTS
PART- 1 GENERAL
1.1 SCOPE
1.1.1 Provide all labor, means, operations, materials, equipment, sales tax, accessories and incidentals necessary for the project entitled
REPAIR FIRE PROTECTION SYSTEMS BLDG 1151, Project number GHLN 11-1039 at F.E. Warren AFB, Wyoming, in strict accordance with these
Specifications, applicable Drawings, Other Attachments and the Terms and Conditions of the Contract.
1.1.2 Provide any special permits and licenses that may be required.
1.1.3 Refer to Bid Schedule as furnished by the Base Contracting Office for breakdown of bid items.
1.2 DESCRIPTION OF WORK:
1.2.1.1 The work includes but is not necessarily limited to the following principle features:
1.2.1.2 Selective demolition.
1.2.1.3 Prep existing facility for new sprinkler and alarm installations.
1.2.1.4 Provide new fire sprinkler systems and alarm devices with mass notification as indicated on the drawings.
1.2.1.5 Provide new HVAC system for communications room.
1.2.1.6 Patching and repair of finishes.
1.2.1.7 Electrical systems work to support new equipment.
1.2.1.8 Other items of work as indicated on the Drawings or in the
Specifications. Some minor portions of the work may not be described by the technical specifications, but shall be performed as indicated on the Drawings.
1.2.1.9 Related or incidental work which is manifestly necessary or customary to finish the project and provide a complete and functional facility.
1.3 GOVERNMENT-FURNISHED PROPERTY:
1.3.1 There are no materials / equipment furnished by the Government for installation by the Contractor on this project.
1.3.2 Refer to the Drawings for materials and equipment to be salvaged for reuse on this project.
SECTION 01 10 00 PAGE 2
1.4 OCCUPANCY AND OPERATION OF PROJECT FACILITY:
1.4.1 The project buildings will be occupied during the entire contract period.
1.4.2 Furniture, personal property and stored items will be removed as necessary from the building by the Government.
1.4.3 Coordinate work to cause minimal disruption for occupants of adjacent buildings and facilities.
1.4.4 Maintain safe access and egress for occupants and users at all times. Do not obstruct or close exit ways without authorization.
1.4.5 For Barricades, Fencing, Warning Signs, and Related Devices required see Art. 1.30 of this section.
1.4.6 During the construction phase, assume responsibility for maintenance and operation of the project facility until returned to control of the Government. Provide complete winterization during cold weather unless adequate heating is maintained.
1.5 EXISTING CONDITIONS AND HAZARDS:
1.5.1 Buildings involved in this project are historical structures located within the boundary of the F.E. Warren AFB National Historic
District. Coordinate with the Base Historic Preservation Officer at
90 CES / CEVH, 307-773-3667, prior to the start of construction for any special requirements.
1.5.2 Field verify all existing conditions, existing construction, dimensions, quantities, other pertinent requirements and suitability for the intended use prior to starting work activities, ordering materials or fabricating components. Determine special requirements or precautions required for items or structures to be renovated, removed, shored, braced or supported.
1.5.3 Prepare written inventory of portions of the facility where work will take place prior to starting work including condition, defects, and equipment present (for purposes of establishing liability for any damages or losses later).
1.5.4 Do not obstruct or close roadways, sidewalks or exit ways without authorization (See separate Article for road closings).
1.6 WORKING HOURS:
1.6.1 Normal working hours for the Contractor will be 7:30 a.m. to 4:30 p.m. excluding Saturdays, Sundays, and Federal holidays. Notify the
Contracting Officer three days in advance if work is desired during other time periods. If Inspectors will be available, a modified work period may be authorized. If Inspectors are required to work other than their normal duty/days solely for the benefit of the
Contractor, the actual cost of inspections at overtime rates will
SECTION 01 10 00 PAGE 3
the charged to the Contractor and an adjustment made to the contract price.
1.7 PERFORMANCE PERIOD / WINTERTIME EXCLUSION PERIOD:
1.7.1 The performance period is established by the contracting officer.
The proposed period of performance (PoP) shall be 270 days and does not include days that fall under the winter exclusion period.
1.7.2 Work affected by cold weather will go into a “Wintertime Exclusion
Period” from 01 October to 30 May. The performance period for this work will be extended by the actual length of time it is within the
“Wintertime Exclusion Period”.
1.7.3 Work may be permitted during the “Wintertime Exclusion Period” if cold-weather precautions satisfactory to the Government are taken.
1.8 DRAWINGS:
1.8.1 The Drawings are based on record drawings, surveys, on-site observations and field measurements made by the Government and others.
1.8.2 Check and compare all Drawings immediately upon their receipt and notify the Contracting Officer of any discrepancies.
1.8.3 Verify all dimensions and quantities shown and adequacy of available spaces prior to construction or ordering materials.
1.8.4 Follow dimensions marked on Drawings in lieu of scaled measurements.
Do not scale drawings. If dimensions are missing or in doubt, notify C.O.R. by submitting the appropriate RFI.
1.8.5 See the table of contents sheet in the drawings for a complete list of all the sheets in the drawing set.
1.9 DEFINITIONS:
1.9.1 Use of certain phrases or words on the Drawings or Specifications have the following definitions:
1.9.1.1 The term "replace" means remove and dispose of existing material or item and furnish and install a similar new material or item that matches both the original material and remaining adjacent materials or items.
1.9.1.2 The term "reinstall" means remove existing material or item and reinstall same material or item properly aligned, plumb and secure to match existing adjacent materials or items.
1.9.1.3 The term "provide" means furnish and install unless otherwise indicated.
1.9.1.4 The term “Contracting Officer” shall mean the Contracting Officer or his/her authorized representative (C.O.R.).
SECTION 01 10 00 PAGE 4
1.10 SUBMITTALS:
1.10.1 Provide submittals called for by the Technical Specifications to the
Contracting Office. The Government will provide the Contractor with a summary list of these required submittals on AF Form 66. Transmit each Technical Submittal to the Contracting Office using AF Form
3000, “Material Approval Submittal”. Submittals received from sources other than the Contractor will be returned without action.
1.10.1.1 SHOP DRAWINGS, PRODUCT DATA, AND OTHER SUBMITTALS: Four (4) copies, maximum. The Government will retain two (2) copies and return the remainder to the Contractor, marked with action taken and corrections or modifications required. If contractor requires additional copies he/she will be responsible for reproducing copies from the package that is returned by the contracting officer.
1.10.1.2 SAMPLES: One (1) set, minimum or as specified in individual spec sections. The Government will retain at least one set.
1.10.2 Review of Technical Submittals by the Government will not be construed as a complete check, but indicates only that the submittals are in general conformance with the design concept and with the information given in the Contract Documents. This approval shall not relieve the Contractor from responsibility for errors and omissions. The Contractor is responsible for field measurements, dimensions, design of adequate connections, details, fabrication processes, and the means, methods, techniques, and procedures for satisfactory installation.
1.10.3 Confirm that the Product Data is in compliance with requirements of the Contract Documents before submitting.
1.10.4 No submittals for colors or finishes will be approved until all samples have been received. All samples will become the property of the Government.
1.10.5 Allow sufficient time for submittal review (four weeks for colors and finishes and two weeks minimum, for other submittals). Advise
Contracting Officer when processing time is critical to the progress of the work. The Government reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
1.10.6 Do NOT proceed with purchase, fabrication or installation until an approved submittal has been received. Do NOT proceed with work until an approved submittal has been received for that portion of the work.
1.10.7 After submittals have been approved, no re-submittals for the substitution of products will be considered without an acceptable explanation from the Contractor.
1.10.8 Submit PROGRESS SCHEDULE on Form 3064 provided by the Government.
SECTION 01 10 00 PAGE 5
1.11 GREEN PROCUREMENT PROGRAM
See section 01 10 10 AFFIRMATIVE PROCUREMENT for additional information.
1.11.1 This paragraph encompasses all Environmentally-friendly Purchasing
Requirements - The U.S. Federal Government is one of the largest purchasers in the world. As such, Congress and the President have passed into law a number of initiatives intended to encourage the development of markets for more environmentally friendly, or green, products. In addition to legal requirements, the Department of
Defense (DoD) and United States Air Force (USAF) have clarified requirements or sought to increase their contribution to the effort.
The various purchasing initiatives and requirements are brought under one umbrella program termed the Green Procurement Program.
1.11.2 The Green Procurement Program (GPP) encompasses seven program elements including: Recovered Materials (formerly referred to as
Affirmative Procurement, which addresses the Environmental
Protection Agency’s Comprehensive Procurement Guideline [CPG] requirements for recycled and reclaimed content of products);
Biobased Products; Energy and Water Efficient Products; Alternative
Fuels and Fuel Efficiency; Non-Ozone Depleting Substances (Non-ODS);
Priority Chemicals; and Environmentally Preferable Products (EPP).
1.11.3 This project is subject to GPP requirements and requires the purchase of GPP-compliant products as well as documentation verifying compliant purchasing. Product specifications within their respective divisions will detail any applicable requirements. For example, appliances may be required to have the Energy Star® label or carpet may be required to have minimum recycled content. The
Green Products Determination Form (GPDF) included in this section highlights products that are subject to GPP requirements. The GPDF is considered a summary of affected products to supplement the project specifications, and any discrepancies between the list and project specifications shall be reported to 90 CES. Listed items marked with an “R” are required for consideration in this project.
The Contractor may change the “R” designation to “E1”, “E2”, “E3” or
“E4” when justified as indicated below (Definitions of “E” designations are listed on the GPDF).
1.11.4 All submittal packages shall be required to include documentation verifying GPP requirements are met as specified in the product specifications. Substitutions are not allowed for products not complying with GPP requirements, including recycled content specifications, without documenting the background for the substitution request and receiving written approval from 90 CES.
Justification for substitution must state at least one of the following:
1.11.4.1 A product is not available competitively and within a reasonable time frame. This may be because the item is not available in the local area.
SECTION 01 10 00 PAGE 6
1.11.4.2 The product does not meet appropriate performance standards, or
1.11.4.3 The product is only available at an unreasonable price.
1.11.5 Contractor is responsible for packaging complete documentation and submitting as part of closeout materials. The final as-built and
O&M package shall document any products not meeting GPP requirements including the written substitution approvals.
1.11.6 The Contractor must compile a report for each category of recycled materials purchased for the Green Procurement Manager upon completion of construction. The report is to be issued in an original and three (3) copies to the Contracting Officer for each delivery order.
1.12 NEW AND RECYCLED MATERIALS AND EQUIPMENT:
1.12.1 All materials and equipment shall be new or newly manufactured using recycled materials unless otherwise indicated. All materials (both new and recycled) shall be the most suitable and highest grade and type for the intended use unless otherwise indicated. They shall be produced by a manufacturer regularly engaged in manufacturing or fabricating similar products with a history of successful production acceptable to the Contracting Officer.
1.12.2 The specific product(s) called out by Manufacturer and Model is the basis for the design but is not intended to limit competition.
Products by other manufacturers may be used subject to the following:
1.12.2.1 The product meets or exceeds the quality level of the specified product.
1.12.2.2 The warranty is the same as for the specified products.
1.12.2.3 The Government determines that the product(s) is equivalent to the specified product, is otherwise suitable for the intended use and approves its use in writing.
1.12.2.4 The Contractor coordinates the installation and makes any necessary changes at no additional cost to the Government.
1.12.2.5 The Contractor waives claims for any time extension associated with the use of the product.
1.12.3 Sole Source Justification:
1.12.3.1 Specific products have been sole source justified by F.E. Warren AFB and substitutions for these items will not be allowed where indicted within the specification. Examples include, but are not limited to, Automated Logic Controls Toshiba VFDs, and Trane air handling equipment and water chillers .
1.12.4 Recycled products:
1.12.4.1 Comply with requirements of paragraph 1.11 Green Procurement
Program.
SECTION 01 10 00 PAGE 7
1.12.4.2 Compile a "Recycled Products Report" for the Resource Recovery and
Recycling Manager at 90 CES/CEV listing the total quantity recycled products used. Submit the report through the Contracting Officer at the end of the contract period or at the end of the calendar year, whichever comes first.
1.12.5 UNACCEPTABLE MATERIALS: Any finish material that has been discontinued or will be discontinued within two (2) years is unacceptable.
1.12.6 If any proposed usage or installation method does not comply with the recommendations or specifications of the Manufacturer, notify the Contracting Officer.
1.12.7 Protect materials during delivery, storage, handling and installation per manufacturer's printed instructions. Place on blocking and cover when necessary to protect from water, dust, direct exposure to sunlight and other elements. Deliver in original containers or packaging with labels intact. Storage locations shall not interfere with work of other trades. Maintain acceptable temperature and humidity conditions. Work areas shall be enclosed, weather tight, and heated as necessary to protect finish materials during and after installation.
1.13 INDUSTRY STANDARDS:
1.13.1 General Applicability of Standards: Applicable standards of the construction industry have the same force and effect (and are made a part of the contract documents when referenced) as if copied directly into contract documents, or as if published copies were bound herewith.
1.13.2 Standards apply only to the technical aspects of manufacture, design and construction. No provision of any referenced standard, manual, or code shall change or increase the duties and responsibilities of the Government or the Contractor.
1.13.3 Reference standards (referenced directly in contract documents or by governing regulations) have precedence over nonreferenced standards which are recognized in industry for applicability to work.
1.13.4 Nonreferenced standards recognized in the construction industry are hereby defined, except as otherwise limited in contract documents, to have direct applicability to the work and will be so enforced for performance of the work
1.13.5 Publication Dates: Comply with standard in effect as of date of contract documents.
1.13.6 Copies of Standards: Provide where needed for proper performance of the work; obtain directly from publication sources.
SECTION 01 10 00 PAGE 8
1.14 BUILDING CODES, LAWS, AND REGULATIONS:
1.14.1 Comply with the latest editions of the LIFE SAFETY CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL, MECHANICAL CODE, INTERNATIONAL PLUMBING CODE and the NATIONAL ELECTRICAL CODE.
1.14.2 Comply with the UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS).
1.14.3 Comply with the AMERICANS WITH DISABILITIES ACT OF 1990 (ADA).
1.14.4 Comply with all other FEDERAL, STATE, and LOCAL LAWS and REGULATIONS that apply to this project including those listed in the Drawings.
1.15 SAFETY STANDARDS:
1.15.1 Comply with requirement of the BASE SAFETY OFFICE for the protection of Air Force Personnel and Property.
1.15.2 Comply with the rules, regulations, standards and requirements of the DEPT. OF DEFENSE (DOD), WYOMING DEPT. OF ENVIRONMENTAL QUALITY
(DEQ), EPA AND OSHA regarding disturbing, removing and disposing of
HAZARDOUS MATERIALS INCLUDING, BUT NOT LIMITED TO ASBESTOS, LEAD-
BASED PAINTS, PIGEON DROPPINGS, BAT EXCREMENT and OTHER HAZARDOUS
MATERIALS.
1.15.3 Comply with CORPS OF ENGINEERS SAFETY & HEALTH REQUIREMENTS MANUAL
EM 385-l-l (Oct 1992), OSHA STANDARDS, and other applicable rules, regulations, standards and requirements regarding WORKER SAFETY.
1.15.4 Comply with WYOMING OCCUPATIONAL HEALTH AND SAFETY RULES AND
REGULATIONS FOR CONSTRUCTION.
1.16 WORK SITE ACCESS-SECURED AREA
1.16.1 The work site for this project is in the WSA at F.E. Warren AFB, WY.
The WSA is considered a secure area in which Contractor personnel shall be escorted at all times. A U.S. Government Escort Official
(military or Civil Service) shall be responsible for on-site security for work within the WSA. For access onto F.E. Warren AFB, the Contractor shall contact the CO or authorized representative for instructions.
1.16.2 For access into the WSA, the Contractor shall provide proper identification of workforce and ensure timely coordination of entry procedures with the CO or authorized representative prior to commencement of work. The Contractor shall maintain strict control over his personnel and equipment on base and in the WSA to ensure full compliance with all aspects of security and safety. Facilities in the WSA will remain on alert status during the performance period of this project. The Air Force requires that these facilities be available for operations or maintenance at all times.
SECTION 01 10 00 PAGE 9
1.16.3 During all work within the WSA, Contractor personnel shall be accompanied and continuously monitored by a U.S. Government Escort
Official. Failure to remain within any area being monitored is a serious breach of security and safety regulations. The Contractor shall take all necessary actions to ensure compliance with these regulations. Should Contractor personnel and the Escort Official become separated for any reason, the unescorted Contractor personnel shall report immediately to any military Security Forces member or
U.S. Civil Service member and await further instructions.
1.16.4 The CO or authorized representative reserves the right to deny entry onto the Base or into the WSA to any Contractor personnel who refuses to comply with the security and safety regulations governing the installation. Delays resulting from such entry shall not result in any cost to the Government.
1.16.5 For access into the WSA, Contractor personnel shall be listed on an
Entry Authorization List (EAL), identified by a Security Forces member, physically searched and escorted on-site by an Escort
Official. Once the “Notice to Proceed” has been issued, the Prime
Contractor shall submit to the CO or authorized representative a list of names of companies (i.e., prime contractor, subcontractor, etc.), and the full name, title, social security number account number (SSAN), birth date and driver's license state/number of each person employed for work in the WSA. This list shall be type written on the Contractor’s company letterhead and shall be provided a minimum of ten (10) working days prior to the commencement of work within the WSA. This list shall be used to generate the EAL.
1.16.5.1 Deletions to the EAL can be made without preparing a new list.
However, for additions or corrections to the EAL, the Contractor shall submit a new list on company letterhead with all the required information. All requested changes to an approved EAL shall be submitted to the CO or authorized representative a minimum of ten
(10) working days before any changes are scheduled to occur.
1.16.5.2 A minimum of ten (10) working days prior to the commencement of work, the Contractor shall submit a letter on company letterhead to the CO or authorized representative identifying the on-site superintendent. The on-site superintendent shall ensure that all
Contractor personnel receive safety briefings and training, and that all safety inspections, practices and procedures are implemented and enforced.
1.16.5.3 A minimum of ten (10) working days prior to the commencement of work, the Contractor shall submit to the CO or authorized representative a list of the license plate numbers, make, model and year of each Contractor vehicle that requires entry into the WSA during the performance period of a this project. (Privately owned vehicles shall not be authorized in the WSA). This information shall be submitted at the same time as the information for the EAL.
Company identification (e.g., name, logo, etc) shall be clearly displayed on each side of all vehicles. Vehicles without such identification shall be denied access to the WSA.
1.16.5.4 Once equipment and supplies are brought inside the WSA perimeter fence, the Escort Official is required to accompany and advise
SECTION 01 10 00 PAGE 10
Contractor personnel on the placement and removal of such items. The
Government shall not be held responsible for loss or damage of any
Contractor materials, machines, tools or equipment. Prior to the completion of all daily scheduled tasks, all scaffolding, ladders etc., shall be removed from all buildings. In addition, no
Contractor vehicles shall be left inside the WSA overnight.
1.16.5.5 On a weekly basis, the Contractor shall prepare and submit to the
CO or authorized representative a proposed and updated work schedule for daily activities in the WSA. Each schedule shall cover two (2) working weeks from the day of submittal in order to coordinate activities for this project. Each schedule shall be on a form or in a format approved by the CO or authorized representative and shall include, but not be limited to, identification of each daily job site (i.e., buildings), disruptions to facility access (i.e., sidewalks, doors, overhead doors, etc.), utility requirements, tests and inspections to be performed.
1.16.5.6 The Contractor shall provide a way for the CO or authorized representative to contact him after normal working hours in the event of emergency or unplanned changes to the schedule. These changes shall include those implemented by Security Forces that effect entry/exit or other security procedures described in this section. The Contractor shall provide any or all of the following as a means for emergency communications: telephone number, pager, fax number, e-mail address, etc.
1.16.6 When the mission dictates, Contractor personnel may be required to vacate the designated work area or evacuate the WSA itself. These interruptions could be for national emergencies, security reasons, exercises, natural disasters, maintenance, etc., and could last for an indefinite period. Depending on the interruption, Contractor personnel may be accommodated in a secure location within the WSA until the event concludes. In the event the WSA must be evacuated, Contractor personnel and equipment shall not be allowed back into the work area until it has been cleared for re-entry. Upon clearance for reentry, Contractor personnel and equipment shall reprocess into the WSA and return to the work site under escort. These potential delays shall not result in any cost to the Government or a schedule delay.
1.16.6.1 The CO or authorized representative shall make a good faith effort
(when practical) to provide the Contractor with sufficient notification of any interruptions so that the Contractor can defer scheduled work for another time. Because of these interruptions, it is imperative that the Contractor follow the guidance provided in this section.
1.16.7 Upon arrival at the WSA, Contractor personnel shall park in designated areas only, remaining clear of all fences and gates, and await the arrival of the Escort Official and security personnel.
Security Forces personnel shall identify all Contractor personnel.
To enter the WSA, all Contractor personnel shall present two (2) forms of identification. Both forms of identification are required to meet the following:
SECTION 01 10 00 PAGE 11
a. Contractor personnel identification shall exactly match the corresponding information on the EAL.
b. At least one form of identification shall have the individual's picture and SSAN. Any form of identification that does not have a picture shall present physical characteristics of that person.
1.16.7.1 To assist with identification, the Contractor may provide each of his personnel with a company identification badge, with current photograph, company ID number and the employee's SSAN. Photo IDs submitted for the EAL shall be the same ID that is used for entry and/or exit to the site.
1.16.7.2 If Contractor personnel are not listed on the EAL, or those who are listed cannot provide proper identification, they shall not be permitted into the WSA. Delays caused by improper EAL data or improper identification shall not result in any cost to the
Government or a schedule delay.
1.16.7.3 The Entry Controller shall control access into the WSA and hand over
Contractor personnel to the Escort Official. Processing into the WSA shall take about 30 minutes and shall not result in any cost to the
Government or a schedule delay. Personnel shall be escorted at all times within the perimeter fence. If Contractor vehicles are required to enter the WSA, Contractor personnel and vehicles shall be verified via the EAL and searched by Security Forces prior to entry.
1.16.7.4 Contraband (illegal or prohibited) items shall not be transported on base or into the WSA. A list of items is displayed at the Entry
Control Point (i.e., the Entrapment Area). If these items are discovered or if Contractor personnel refuse to remove any items for inspection, the Entry Controller shall terminate all entry/exit procedures, and the subject(s) shall be detained or removed from the
Base. Delays resulting from such violations shall not result in any cost to the Government or schedule delay.
1.16.7.5 Common photographic or video equipment, cellular telephones with photographic capability or other devices with photographic capability shall not be brought into the WSA. If these items are discovered, they shall be confiscated, and the individual shall be detained or removed from the Base. Delays resulting from such violations shall not result in any cost to the Government or schedule delay.
1.16.7.6 Smoking is authorized in designated smoking areas only. Failure to comply with this restriction could result in removal from the WSA.
Delays resulting from any such violation shall not result in any cost to the Government or schedule delay.
1.16.7.7 The Entry Controller shall control the exit from the WSA. Processing out of the WSA shall take about 30 minutes and shall not result in any cost to the Government or a schedule delay. Personnel shall be escorted at all times during out-processing. Contractor vehicle and personnel shall be searched by Security Forces personnel prior to site exit.
SECTION 01 10 00 PAGE 12
1.16.8 Contractor personnel shall not take pictures on base or inside the
WSA. If photographs are necessary, the Contractor shall coordinate requirements with the CO or authorized representative.
1.17 STORAGE, STAGING AND PARKING:
1.17.1 When space is available at the project site, it may be used for the
Contractor's storage, staging and parking areas upon coordination with contracting officer’s authorized representative. Otherwise, space at another location will be designated by the Contracting
Officer. A consolidated contractor staging area is located on the south side of the Base. Contractor may be assigned space at this location when available.
1.17.2 No sodded or landscaped areas or exit ways shall be used for storage, staging, or parking.
1.18 TEMPORARY FUELING FACILITY:
1.18.1 NOT applicable to this project
1.19 TEMPORARY UTILITIES:
1.19.1 The Government will furnish utilities (water, gas, electricity) to the Contractor at no cost from existing points of connections.
1.19.1.1 All costs of making connections and extensions shall be paid by the
Contractor.
1.19.1.2 Contractor shall remove all temporary utility connections at the end of the project and restore conditions for such connections to previous state.
1.20 TEMPORARY HEAT, VENTILATION, POWER AND LIGHTING:
1.20.1 It is anticipated that work under this contract will be accomplished during the time period that the central heat plant is normally shut down. Any work that may be accomplished during the winter exclusion period will be contingent on the facility involved being heated by a secondary means. Provide sufficient heat to keep facility at normal occupied temperatures.
1.20.2 Provide temporary power and lighting when necessary to support construction operations and facility occupation. Use the permanent systems when they are operational.
1.21 TEMPORARY SANITARY FACILITIES:
1.21.1 Provide portable self-contained sanitary toilets at a location determined by the Contracting Officer.
SECTION 01 10 00 PAGE 13
1.22 TEMPORARY FIRE PROTECTION:
1.22.1 Provide and maintain temporary fire extinguishers as determined adequate by the Base Fire Department.
1.23 FIELD OFFICE AND TELEPHONE:
1.23.1 Field Office is required.
1.23.2 Provide temporary job phone, cell phones are acceptable.
1.24 PROJECT SIGN:
1.24.1 No project sign is permitted.
1.25 PROJECT SUPERVISION:
1.25.1 Provide a competent superintendent for the project. This person, or a designated representative, must be readily available at all times and must have the authority to make decisions and enter into agreements for the contract holding company. Each Subcontractor shall maintain a competent foreman or representative on the job when work is in progress for their portion of the contract. Together they shall cooperate and be responsible for the proper and timely layout, coordination, erection and completion of the work.
1.25.2 Each trade shall lay out and install its work at such time and manner to avoid delay or interference with other work. Anticipate and resolve conflicts before work begins. Submit questions through the prime General Contractor to the Contracting Officer or authorized representative for resolution before proceeding with the work in question.
1.26 PROJECT MEETINGS:
1.26.1 Conduct coordination/ progress meetings at the project site at weekly intervals. Attendees shall include the Government’s
Representatives, Subcontractors and others concerned with project progress, coordination or performance. These representatives shall be familiar with the Project and authorized to conclude matters relating to coordination & progress.
1.26.2 Conduct a pre-installation meeting at the site before major or special construction activity that requires significant coordination with other construction. The Installer and representatives of
Manufacturers, Fabricators, other Subcontractors involved in or affected by the installation and Government Representatives shall attend the meeting.
1.26.3 At the pre-installation meeting, review the progress of other construction activities, preparations for the particular activity
SECTION 01 10 00 PAGE 14
under consideration and other relevant considerations. Consider the following:
1.26.3.1 Options.
1.26.3.2 Purchases.
1.26.3.3 Deliveries.
1.26.3.4 Status of Submittals, Shop Drawings, Product Data and quality control Samples.
1.26.3.5 Possible conflicts.
1.26.3.6 Compatibility problems.
1.26.3.7 Time schedules.
1.26.3.8 Weather limitations.
1.26.3.9 Manufacturer's recommendations.
1.26.3.10 Compatibility of materials.
1.26.3.11 Acceptability of substrates.
1.26.3.12 Temporary facilities.
1.26.3.13 Space and access limitations.
1.26.3.14 Governing regulations.
1.26.3.15 Safety.
1.26.3.16 Inspection and testing requirements.
1.26.3.17 Required performance results.
1.26.3.18 Recording requirements.
1.26.3.19 Protection.
1.26.3.20 Interface requirements.
1.26.3.21 Sequences.
1.26.3.22 Deliveries.
1.26.3.23 Off-site fabrication problems.
1.26.3.24 Site utilization.
1.26.3.25 Temporary facilities and services.
1.26.3.26 Hours of work.
1.26.3.27 Hazards and risks.
1.26.3.28 Housekeeping.
1.26.3.29 Quality and work standards.
1.26.3.30 Modifications.
1.26.3.31 Documentation of information for payment requests.
1.27 CONSTRUCTION METHODS AND MEANS:
1.27.1 The Contractor is solely responsible for construction means, methods, techniques, procedures, fabrication processes, sequences, scheduling, coordination, safety precautions, safety programs and other necessary precautions during construction. The Government will NOT assume responsibility for any of these.
1.28 FIELD ENGINEERING:
1.28.1 The General Contractor shall do construction staking and establish horizontal and vertical control elevations for construction including earthwork, site grading, curbs and gutters, sidewalks, paving, and concrete footings. Fitting of new equipment and necessary modifications to existing facilities as required to provide a complete a finished product shall be planned and accomplished by the contractor.
SECTION 01 10 00 PAGE 15
1.29 QUALITY CONTROL AND INSPECTION:
1.29.1 The General Contractor shall employ and pay an independent testing laboratory or firm (approved by the Government) to perform field sampling, quality control testing and to submit test reports required by the Technical Specifications during construction for earthwork, surfacings, paving, concrete, test and balance, etc.
1.29.2 The Contractor shall ensure that all work has been inspected by a
Government Inspector prior to concealment.
1.29.3 The Contractor shall employ Inspectors certified by ASSE, AWWA or other recognized agency to test backflow preventer work as required.
1.30 BARRICADES, FENCING, WARNING SIGNS AND RELATED DEVICES:
1.30.1 Erect barricades, safety barriers, barrels, fencing, signs, warning lights, flagging, flag persons and devices as appropriate to control traffic and to warn and protect the workmen, users, occupants and the public. All signs shall be professional quality. Comply with latest edition of MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
1.30.2 Barricade and lock doors and place warning signs when doors open onto/into hazardous work areas or when overhead work is occurring
(such as roofing or eave and gutter work). Coordinate with Fire
Dept. (90CES / CEF - 775-2931 ) to assure that adequate egress is maintained.
1.31 SHORING AND BRACING:
1.31.1 Install temporary shoring, bracing, and structural supports at existing and new structures and improvements as necessary to resist all loads including wind, snow, rain and temporary construction loads.
1.32 CUTTING, PATCHING, AND REPAIRING:
1.32.1 Cut openings in existing construction as required. Trades requiring openings shall supply, in advance, proper and detailed information thereof.
1.32.2 Each trade shall do all drilling, cutting, fitting or patching as necessary to install new work and coordinate with the work of other trades, as shown or reasonably implied from the drawings and specifications. Methods and procedures shall minimize damage to other work.
1.32.3 Seal construction voids for the full thickness wherever any pipe, conduit, ducts, equipment or any material penetrates or passes through a wall, ceiling, floor or roof. Install flashing as required to maintain weather tightness. Restore fire or smoke-rated walls and floors to their original integrity using approved fire-stopping methods. Fire/smoke rating of fire-stopping material:
SECTION 01 10 00 PAGE 16
Not less than that of the surrounding construction. Finish to match adjacent surfaces.
1.32.4 Patch, repair, replace or restore all finished or unfinished surfaces cut, disturbed or damaged by demolition and construction activities or operations including mechanical and electrical work.
Fill, seal or close all holes, voids and openings remaining after demolition activities. Finish to match adjacent surfaces in color, texture and appearance. When adjacent surfaces and finishes cannot be matched, refinish entire surface to nearest intersection.
1.33 PROTECTION AND RESTORATION OF PROPERTY:
1.33.1 Protect the existing facilities, all materials and equipment to be incorporated therein, completed work, site improvements, trees, landscaping, utilities, public ways and other facilities.
1.33.2 Promptly remedy all damage or loss resulting from activities or operations under this contract. Restore equivalent to original conditions.
1.33.3 Restore disturbed areas to a condition equivalent to or better than that which existed previously.
1.33.4 When indicated on the Drawings, protect trees to remain with a 6-ft.
high fence not less than 5 feet from the trunks.
1.33.5 Protect tree roots during trenching per article “Special
Requirements for Site Utilities”.
1.34 SPECIAL ALTERATION AND RENOVATION REQUIREMENTS:
1.34.1 When existing finish materials or surfaces will be visible in renovated rooms and spaces, protect from damage. Cover if necessary. Refinish each material or surface as specified for comparable new work.
1.34.2 Cut, move, remove, modify or prepare existing items, surfaces and finishes as necessary for completion of alteration and renovation work. Minimize damage to other work.
1.34.3 Make smooth, even and neat transitions between new and existing work.
1.34.4 Where removal of partitions or walls results in adjacent spaces becoming one, rework floors, walls and ceiling to smooth planes without breaks, steps, offsets or bulkheads.
1.34.5 Trim existing doors as necessary to clear new floor finishes.
Refinish trim as required.
1.34.6 Reinstall materials, equipment or items that are disturbed or removed temporarily. Comply with workmanship and other applicable provisions of technical specification sections for comparable new
SECTION 01 10 00 PAGE 17
work. Use new screws and other fastening devices. Remove and replace blinds, shades and drapes as necessary for access to the work areas.
1.35 SPECIAL REQUIREMENTS FOR SITE UTILITIES:
1.35.1 Place a color-coded plastic warning tape at least 4" wide within the trench above all buried utility lines. A continuous printed inscription on the tape shall describe the specific utility:
1.35.1.1 RED Electric.
1.35.1.2 YELLOW Gas, oil, dangerous material.
1.35.1.3 ORANGE Communications.
1.35.1.4 BLUE Water.
1.35.1.5 GREEN Sewer.
1.35.2 Avoid trenching near trees so as to minimize root damage. Stay at
15 ft. from center of large trees (36” diameter or larger at 4 ft.
above the ground), 12 ft. from 24” to 36” diameter trees, 10 ft.
from 18” to 24” diameter trees, 8 ft. from 12” to 18” diameter trees and 5 ft. from trees under 12” in diameter. Consult with the Base
Natural Resources Officer.
1.36 UTILITY SERVICE INTERRUPTIONS AND ROAD CLOSINGS:
1.36.1 Notify the Government in writing at least two (2) weeks prior to the interruption of utility or communication services to or within the project building or to facilities used by others. No outage shall exceed four (4) hours. The Government will coordinate the time and duration of all outages with the Using Agency and others.
1.36.2 Roads may be closed one lane at a time with vehicular traffic allowed to pass through the construction area. If an entire street is to be closed notify the Government in writing at least two (2) weeks prior to the closing. Comply with separate Article
"Barricades, Fencing, Warning Signs and Related Devices.
1.37 DIGGING PERMITS AND EXCAVATION:
1.37.1 A "Digging Permit" is required for all types of excavation, digging and borings regardless of depth. Make application on "Base Civil
Engineering Work Clearance Request", AF Form 103, through the Civil
Engineering Customer Service Office, (90 CES / CEOC), Bldg. 318, 307-773-3227, at least two (2) weeks before work will begin.
Permits must be renewed each month.
1.37.2 Only hand digging is permitted within five feet of communication lines.
SECTION 01 10 00 PAGE 18
1.38 DEQ PERMITS FOR SITEWORK AND UTILITIES:
1.38.1 Comply with National Pollutant Discharge Elimination System (NPDES) regulations and obtain a NPDES Permit from the Wyoming Department of
Environmental Quality (DEQ) prior to the start of construction when the area of the construction site or disturbed area is five (5) acres or more. NPDES regulations regulate storm water runoff. POC for submitting permit application is 90 CES / CEV, Bldg. 367, (307)
775-2213.
1.38.2 NO WORK requiring a permit may begin until the permit has been received.
1.38.3 The Contractor shall comply with DEQ regulations and other conditions attached to the permit and shall provide a DEQ-certified
"System Operator” (supervisor) for all water and sewer system work requiring a DEQ permit. The "System Operator's" certification and duties shall be in accordance with Wyoming Dept. of Environmental
Quality (DEQ) Water Quality Rules and Regulations, Chapter V. The
"System Operator" shall have the day-to-day on-site responsibility for directing the work and for making on-site inspections to ensure conformance with DEQ requirements.
1.38.4 Design shall be in accordance with DEQ rules and regulations.
Drawings submitted to DEQ shall be stamped by a Professional
Engineer registered in the State of Wyoming.
1.38.4.1 Provide four (4) copies of DEQ packages ready to submit to the
State of Wyoming for permitting, complete with all applicable drawings, specifications, design analysis and other data. Provide four (4) copies of additional data or revisions as requested by
DEQ pursuant to their review. Incorporate all DEQ comments into the Design Documents until the permit is issued.
1.39 CONFINED SPACE ENTRY:
1.39.1 Comply with OSHA (20 CFR 1910.146) and AFOSH STD 91-25 (Nov. 1994) for confined space entry. Manholes, vaults, tunnels, tanks, pipes, certain pits and other spaces with limited openings for entry/exit or with limited space and not meant for continuous occupancy are considered confined spaces. All are to be considered "permit-required confined spaces" with one or more serious safety or health hazards until they have been determined to be "non-permit-required confined spaces" free of safety or health hazards.
1.39.2 Contractor shall develop and use a written confined-space entry program meeting OSHA requirements that includes permit processing, use of fully qualified and trained personnel and assumes all emergency rescue responsibilities. Permitting process shall include any Air Force personnel that may be required to enter confined spaces.
SECTION 01 10 00 PAGE 19
1.39.3 Prior to entry, notify and coordinate with the Base Safety, Fire
Dept. and Bioenvironmental Agencies to verify any special precautions or procedures necessary and to determine whether any hazardous contents or conditions exist within these spaces. The
Entry Supervisor shall fill out and sign a written Entry Permit, making sure all necessary hazard controls are considered. Brief
Base Bioenvironmental upon completion of entry operations regarding
“lessons learned” and hazards or problems encountered.
1.40 NUCLEAR DEVICES AND RADIOACTIVE MATERIALS:
1.40.1 Comply with AFI 40-201 (July 1994), Managing Radioactive Materials in the USAF, regarding posting Notices to Workers, proper use of equipment and other requirements therein.
1.40.2 Submit written request on company letterhead to the Contracting
Officer prior to bringing onto the Base or using any nuclear devices or radioactive materials. Include description, location and estimated dates of proposed activities; applicable specification pages; copy of current NRC or Agreement State license; name, address and telephone number of responsible local representative and radiation safety officer (RSO) named on the license; and an acknowledgment that the RSO can make periodic checks to ensure
Contractor compliance and suspend operations deemed unsafe. Action on the request will be taken by the Base Environmental (90 AMS /
SGPB).
1.41 WELDING, CUTTING AND BRAZING PERMITS:
1.41.1 A permit is required for any welding, torch cutting, sweating, brazing or similar operation using an open flame. Make application on AF Form 592 through the Base Fire Department (90 CES / CEFT), Bldg. 324. Permits must be renewed each month. Fire extinguishers must be on hand during these operations.
1.41.2 Comply with AFOSH STD 91-25 (Nov. 1994).
1.42 SPILL PREVENTION AND RESPONSE:
1.42.1 Develop a plan for spill prevention and for spill detection, reporting, containment, cleanup and disposal. A manifest indicating proper disposal is required. All workers shall be familiar with this plan.
1.42.2 Submit copy of this plan to the Base Environmental (90 CES/CEV) for approval.
1.43 DISPOSAL AND CLEANUP:
See section 01 10 10 for additional requirements.
SECTION 01 10 00 PAGE 20
1.43.1 Remove all debris, waste and surplus materials from the immediate work areas each day and from the premises at suitable intervals and at final completion of the project. Disposal shall be at an off-base location at an established landfill or other site approved for the type of material being removed. Burning or burial at the project site are not acceptable disposal methods.
1.43.2 When the materials are hazardous, dangerous or unsanitary, handle separately from other waste and place in appropriate containers.
Provide evidence that all required permits and arrangements for transportation and disposal have been obtained. Provide evidence that the disposal landfill is EPA-approved. Provide copy of letter from landfill operator agreeing to accept the waste and documentation regarding proper disposal including waste manifests and landfill receipts.
1.43.3 On completion of the project, leave interior and exterior surfaces including site and streets in a clean, sanitary, odor-free, acceptable condition, ready for operation and occupancy.
1.43.4 Remove temporary labels, foreign matter, dirt, dust, sawdust, fingerprints, marks, stains, streaks, splatters, water spots, films, cleaning residue, paint drippings or overspray, cobwebs, mold and mildew from exposed surfaces and accessible spaces.
1.43.5 Mop hard-surfaced floors (tile, concrete). Vacuum carpets.
1.43.6 Wash and polish glass and glossy surfaces.
1.43.7 Clean or replace filters of mechanical equipment.
1.43.8 Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication and other substances. Clean plumbing fixtures to a sanitary condition. Clean light fixtures, diffusers and lamps.
1.43.9 Hose down and broom all concrete slabs, walks, and paved areas.
1.43.10 Rake clean other exterior ground surfaces.
1.43.11 Use cleaning materials and procedures as recommended by the manufacturer of the surface being cleaned.
1.44 EXTRA FINISH MATERIALS:
1.44.1…