Attachment 1 - Air Comp System Salient Characteristics v2 Dated 20220801.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- FA461022Q0038 Air Compressor System - Vandenberg Space Force Base Federal contract opportunity
- Solicitation number
- FA461022Q0038
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA461022Q00380001 Air Compressor RFQ Amend 1 20220802.pdf | ||
| Attachment 3 - VSFB Access Request Form.xlsx | XLSX spreadsheet | |
| Solicitation - FA461022Q0038.pdf | ||
| Attachment 2 - Question and Answer Template.docx | DOCX document | |
| Attachment 1 - Air Compressor System Salient Characteristics.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Salient Characteristics/Requirements |
| Item: Whole Facility Air Compressor System |
| Preferred Brand Name: Atlas Copco |
| Preferred Model or Part Number: GA15VSD+ The Brand Name and Model Number are an example of an acceptable Name and Model Number |
| Specifications and Requirements | Technical Review | ||||||||
| Meets Requirement Yes or No For every “no” entry, please provide a complete and detailed explanation at the end of the table | |||||||||
| Item | Specifications | Must be same as Preferred Brand name | Vender 1 | Vender 2 | Vender 3 | Vender 4 | |||
| or | or | or | Vender Name | ||||||
| Equal To | Greater Than | Lesser Than | Quote # | ||||||
| 1 | Shipping FOB Vandenberg SFB | X | |||||||
| 2 | Off-loading, rigging and placement | X | |||||||
| 3 | Setup and Installation of new equipment Building 8190 Vandenberg SFB, CA | X | |||||||
| 4 | Onsite Training of operators Building 8190 Vandenberg SFB, CA | X | |||||||
| 5 | Must include IUID tag plate per MIL-STD-130x | X | |||||||
| 6 | Required all start up Consumables, i.e. Fluids, oils, filters, etc.. | X | |||||||
| 7 | All Available Safety related equipment including Machine guarding | X | |||||||
| 8 | 2 ea. Stand alone Oil injected rotary screw compressor / with the following characteristics/requirements: | X | |||||||
| 9 | Capacity: 87.3 CFM @ 102 PSI | X | |||||||
| 10 | Max operating pressure 180 PSI | X | |||||||
| 11 | Motor: 20HP | X | |||||||
| 12 | Motor type: Synchronous interior permanent magnet | X | |||||||
| 13 | Sound Level: no greater than 64 dB(A) | X | |||||||
| 14 | 460V 3 phase | X | |||||||
| 15 | Auto restart after power failure | X | |||||||
| 16 | Electronic controls module w/ graphic display & I/O connections with the following features: | X | |||||||
| 17 | 1 Ethernet & 2 CAN connections | X | |||||||
| 18 | Remote control and connectivity | X | |||||||
| 19 | 10 Digital inputs | X | |||||||
| 20 | 5 Temperature & 2 Pressure analog inputs | X | |||||||
| 21 | 9 digital outputs | X | |||||||
| 22 | RS485 connection | X | |||||||
| 23 | IO Expansion connection | X | |||||||
| 24 | 2 ea. Separate non interrogated Refrigerated air dryer/ with the following characteristics/requirements: | X | |||||||
| 25 | 115 VAC single phase | X | |||||||
| 26 | Air dryer capacity: 91 CFM | X | |||||||
| 27 | Max operating pressure: 233 PSI | X | |||||||
| 28 | Auto Drain | X | |||||||
| 29 | Electronic controls module w/ graphic display & I/O connections for remote alarm indication | X | |||||||
| 30 | Warranty: 3 years on all components of air compressor system including Air dryers | X | |||||||
| 31 | 240 gallon 200 PSI vertical tank with pressure gauge and safety valve & auto drain (Wet) | X | |||||||
| 32 | 400 gallon 200 PSI vertical tank with pressure gauge and safety valve & auto drain (Dry) | X | |||||||
| 33 | 2 ea. Electrically operated Automatic Drains. One for each tank | X | |||||||
| 34 | 2 ea. Oil coalescing air filters 107 CFM. Installed before each Air dryers | X | |||||||
| 35 | 2 ea. Water separator filters 105 CFM. Installed before each Air dryers | X | |||||||
| 36 | System installation to include the following: | X | |||||||
| 37 | Install air compressors, air dryers and receiver tank into specified locations. | X | |||||||
| 38 | Install pre and after filters with single 3 way bypass around system. | X | |||||||
| 39 | Provide and install all necessary piping between all equipment tying into air tanks. | X | |||||||
| 40 | Provide and install main piping header from 400 gal tank into existing main piping in facility. | X | |||||||
| 41 | Provide and install necessary condensation lines from all equip. to customer provided drain. | X | |||||||
| 42 | Hardwire air compressors to customer provided disconnect switch. | X | |||||||
| 43 | Hardwire air dryers to customer provided electrical service. | X | |||||||
| 44 | All isolation/shut off values must be ball style values | X | |||||||
| 45 | All electrical and plumbing line must be installed off the ground and not create tripping hazards | X | |||||||
| 46 | Provide and install all OSHA required inlet and outlet fittings. | X | |||||||
| 47 | |||||||||
| 48 | |||||||||
| 49 | |||||||||
| 50 | Price: |
Notes: Line Item Explanation of “No” Evaluation
File details come from the government source that posted it. Updated .