Attachment 1 - Air Compressor System Salient Characteristics.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- FA461022Q0038 Air Compressor System - Vandenberg Space Force Base Federal contract opportunity
- Solicitation number
- FA461022Q0038
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA461022Q00380001 Air Compressor RFQ Amend 1 20220802.pdf | ||
| Attachment 1 - Air Comp System Salient Characteristics v2 Dated 20220801.xlsx | XLSX spreadsheet | |
| Attachment 3 - VSFB Access Request Form.xlsx | XLSX spreadsheet | |
| Solicitation - FA461022Q0038.pdf | ||
| Attachment 2 - Question and Answer Template.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Salient Characteristics/Requirements |
| Item: Whole Facility Air Compressor System |
| Example of an Acceptable Brand Name: Atlas Copco |
| Example of Acceptable Model or Part Number: GA15VSD+ |
| Specifications and Requirements | Technical Review | ||||||||
| Meets Requirement Yes or No For every “no” entry, please provide a complete and detailed explanation at the end of the table | |||||||||
| Item | Specifications | Must be same as Preferred Brand name | Vender 1 | Vender 2 | Vender 3 | Vender 4 | |||
| or | or | or | Vender Name | ||||||
| Equal To | Greater Than | Lesser Than | Quote # | ||||||
| 1 | Shipping FOB Vandenberg SFB | X | |||||||
| 2 | Off-loading, rigging and placement | X | |||||||
| 3 | Setup and Installation of new equipment B8190 Vandenberg SFB, CA | X | |||||||
| 4 | Onsite Training of operators B8190 Vandenberg SFB, CA | X | |||||||
| 5 | Must include IUID tag plate per MIL-STD-130x | X | |||||||
| 6 | Required all start up Consumables, i.e. Fluids, oils, filters, etc.. | X | |||||||
| 7 | All Available Safety related equipment including Machine guarding | X | |||||||
| 8 | Oil injected rotary screw compressor 2 ea / with the following characteristics/requirements: | X | X | ||||||
| 10 | Capacity: 87.3 CFM @ 102 PSI | X | |||||||
| 9 | Max operating pressure 180 PSI | X | |||||||
| 10 | Motor: 20HP | X | |||||||
| 11 | Motor type: Synchronous interior permanent magnet | X | |||||||
| 13 | Sound Level: 64 dB(A) | X | |||||||
| 14 | 460V 3 phase | X | |||||||
| 15 | Auto restart after power failure | X | |||||||
| 15 | Electronic controls module | X | |||||||
| 16 | Vaiable speed | X | |||||||
| 17 | Refrerated air dryer 2 ea/ with the following characteristics/requirements | X | |||||||
| 18 | 20 HP | X | |||||||
| 19 | 115 VAC single phase | X | |||||||
| 20 | Air dryer capacity: 91 CFM | X | |||||||
| 21 | Max operating pressure: 233 PSI | X | |||||||
| 22 | Auto Drain | X | |||||||
| 23 | Alarm lights | X | |||||||
| 23 | Warrenty: 3 year bumper to bumper | X | |||||||
| 24 | 400 gallon 200 PSI vertical tank with pressure gauge and safety valve | X | |||||||
| 25 | Oil coalesing air filters 107 CFM 2 ea. | X | |||||||
| 26 | Oil and water seperator filters 105 CFM 2 ea. | X | |||||||
| 27 | System istallation to include the following: | X | |||||||
| 28 | Install air compressors, air dryers and receiver tank into specified locations. | X | |||||||
| 29 | Install pre and after filters with single 3 way bypass around system. | X | |||||||
| 30 | Provide and install all necessary piping between all equipment tying into 400 gallon tank. | X | |||||||
| 31 | Provide and install main piping header from 400 gal tank into existing main piping in facility. | X | |||||||
| 32 | Provide and install necessary condensation lines from all equip. to customer provided drain. | X | |||||||
| 33 | Hardwire air compressors to customer provided disconnect switch. | X | |||||||
| 34 | Hardwire air dryers to customer provided electrical service. | X | |||||||
| 35 | Provide and install all OSHA required inlet and outlet fittings. | X | |||||||
| 36 | |||||||||