Environmental Compliance

View the file

Other files for this federal contract opportunity

Other files attached to Base Wide Paint and Corrosion Control, newest first.
File Type Posted
Attachment_02,_Painting,_Exhibit_A_Pricing_Schedule_-_Copy.pdf PDF
Attachment_05,_Firm_Fixed_Price_TO_Worksheet.pdf PDF
Attachment_06,_VAFB__Facilities_Excellence_Stds_18_Apr_2017.pdf PDF
Draft_RFP.pdf PDF
Attachment_01,_Base_Wide_Paint_-Corrosion__SOW_2018.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 - Contract No. FA4610-17-R-5001

APPENDIX H

Vandenberg AFB Environmental Compliance Requirements

SECTION 01 57 20

ENVIRONMENTAL PROTECTION

TABLE OF CONTENTS Page Number

PART 1 GENERAL 22

1.1 REFERENCES

1.2 DEFINITIONS 25

1.2.1 Environmental Pollution and Damage 25

1.2.2 Environmental Protection 25

1.2.3 Contractor Generated Hazardous Waste 25

1.2.4 Pesticide 25

1.2.5 Pests 25

1.2.6 Land Application for Discharge Water 25

1.2.7 Surface Discharge 25

1.2.8 Waters of the United States 25

1.2.9 Wetlands 25

1.2.10 Sediment 25

1.2.11 Solid Waste 26

1.2.12 Garbage 26

1.2.13 Chemical Waste 26

1.2.14 Hazardous Waste 26

1.2.15 Hazardous Debris 26

1.2.16 Hazardous Materials 27

1.2.17 Waste Hazardous Material (WHM) 27

1.2.18 Oily Waste 27

1.2.19 Regulated Waste 27

1.2.20 Ozone Depleting Substance (ODS) 27

1.2.21 Universal Waste 28

1.3 SUBMITTALS 28

1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS 29

1.4.1 Conformance with the Environmental Management System 30

1.5 QUALITY ASSURANCE 30

1.5.1 Preconstruction Survey 30

1.5.2 Regulatory Notifications 30

1.5.3 Environmental Brief 30

1.5.4 Environmental Manager 30

1.5.5 Contractor 40 CFR Employee Training Records 31

PART 2 PRODUCTS 31

PART 3 EXECUTION 31

3.1 ENVIRONMENTAL COMPLIANCE REQUIREMENTS 31

3.1.1 Submittals 31

3.2 ENVIRONMENTAL PROTECTION PLAN 32

3.2.1 Environmental Protection Plan Review 32

3.2.2 Licenses and Permits 32

3.3 PROTECTION OF NATURAL RESOURCES 33

3.3.1 Erosion and Sediment Control Measures 33

3.3.1.1 Burnoff 33

3.3.1.2 Protection of Erodible Soils 33

3.4 GENERAL PERMIT, STORM WATER NOTICE OF INTENT 33

3.4.1 Storm Water 34

3.4.2 Construction General Permit Stormwater Requirements 35

3.4.3 Energy Independence and Security Act Section 438 35

3.5 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES MANAGEMENT 35

3.6 SOLID WASTE MANAGEMENT PLAN and PERMIT 35

3.6.1 Solid Waste Management Report 36

3.6.2 Control and Management of Solid Wastes 36

3.7 WHM/HW MATERIALS PROHIBITION 38

3.8 HAZARDOUS MATERIAL MANAGEMENT 38

3.8.1 Asbestos Management 41

3.8.2 Polychlorinated Biphenyls (PCBs) Management 43

3.8.3 Radioactive or Radionuclides Materials Management 43

3.8.4 Lead Based Paint (LBP) Management 44

3.9 PETROLEUM PRODUCTS AND REFUELING 44

3.9.1 Oily and Hazardous Substances 44

3.9.2 Inadvertent Discovery of Petroleum Contaminated Soil or Hazardous Wastes 44

3.10 FUEL TANKS 44

3.11 RELEASES/SPILLS OF OIL AND HAZARDOUS SUBSTANCES 44

3.12 CONTROL AND MANAGEMENT OF HAZARDOUS WASTES 45

3.12.1 Facility Hazardous Waste Generator Status 47

3.12.2 Regulated Waste Storage/Satellite Accumulation/90 Day Storage Areas 47

3.12.3 Class I [and II] ODS Prohibition 47

3.12.3.1 Universal Waste/e-Waste Management 47

3.13 WATER QUALITY REQUIREMENTS 48

3.13.1 Ambient Water 48

3.13.2 Drinking Water 48

3.13.3 Domestic Wastewater 48

3.13.4 Industrial Wastewater 49

3.13.5 Groundwater 49

3.13.6 Miscellaneous 49

3.14 AIR QUALITY MANAGEMENT 50

3.14.1 Demolition, Site Clearing, Grading, Excavation, Backfilling, and Trenching 50

3.14.2 Paving 50

3.14.3 Coating, Painting, Adhering, and Sealing 50

3.14.4 Abrasive Blasting and Corrosion Control 51

3.14.5 Use of Portable Equipment Powered by Internal Combustion Engines 51

3.14.6 Gasoline/E-85 Storage Tanks 51

3.14.7 Ozone Depleting Substances (ODS) 51

3.14.8 Operation of Vandenberg Owned Permitted Equipment 51

3.14.9 Installation of Boilers, Hot Water Heaters, Furnaces, Process Heaters, and Internal Combustion Engines 51

3.15 ABOVE GROUND STORAGE TANKS (AST) MANAGEMENT 52

3.16 UNDERGROUND STORAGE TANKS (UST) MANAGEMENT 53

3.16.1 SOIL CONTAMINATION MANAGEMENT 53

3.17 LANDSCAPING REQUIREMENTS 53

3.18 GREEN PROCUREMENT PROGRAM (GPP) 54

3.19 ENERGY USAGE MANAGEMENT 55

-- End of Section Table of Contents --

PART 1 GENERAL

1..1 REFERENCES

1.1.1. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. Unless otherwise noted, the latest published version and/or revision shall be used.

1.1.1.1. U.S. AIR FORCE (USAF)

AFI 23-204 Organizational Fuel Tanks

AFI 32-1053 (1999) Pest Management Program

AFI 32-7040 Air Quality Compliance

AFI 32-7044 Storage Tank Compliance

AFI 32-7064 Conservation and Management of Natural Resources

AFI 32-7065 Cultural Resources Management

AFI 32-7080 Compliance Assurance and Pollution Prevention

AFI 32-7086 Hazardous Materials Management

AFI 32-7086 Air Force Space Command Supplement, Hazardous Materials Management

AFI 40-201 Managing Radioactive Materials In The USAF

30 SW AFI 40-101 Managing Radioactive Materials

30 SWI 32-702 Environmental Management Air Emission Inventories

30 SW Plan 32-1002 Lead-Based Paint Management Plan

30 SW Plan 32-1052-A Asbestos Management Plan

30 SW Plan 32-1052-B Asbestos Operating Plan

30 SW Plan 32-4002-A HAZMAT Emergency Response Plan

30 SW Plan 32-4002-C Spill Prevention Control and Countermeasures Plan

30 SW Plan 32-7041-C Wastewater Management Plan

30 SW Plan 32-7042 Integrated Solid Waste Management Plan

30 SW Plan 32-7043-A Hazardous Waste Management Plan

30 SW Plan 32-7043-E Recoverable and Waste Petroleum Products Management Plan

30 SW Plan 32-7080 Green Procurement Program Plan

30 SW Plan 32-7086 Hazardous Materials Management Plan

Integrated Natural Resources Management Plan for Vandenberg AFB, Plan Period 2009-2013

Vandenberg AFB Energy Management Plan

Vandenberg AFB Facilities Excellence Plan & Standards

Vandenberg AFB Landscaping Guidelines

HQ AFSPC CEA Policy Letter P01009, Tracking and Reporting Solid Waste Disposal and Diversions (30 Apr 01)

VAFB Environmental Management System (EMS) Guide 2007

California Stormwater BMP Manual (2009, California Stormwater Quality Association)

Off-Highway Vehicle BMP Manual for Erosion and Sediment Control (2007, California Department of Parks and Recreation)

1.1.1.2. CALIFORNIA CODE OF REGULATIONS (CCR) & STATE OF CALIFORNIA

8 CCR, Chapter 3.22, Subchapter 2 Article 2.6 Asbestos Consultants and Site Surveillance Technicians, §341.15 Certification of Asbestos Consultants and Site Surveillance Technicians

8 CCR, Chapter 4, Subchapter 4 Article 4 Dusts, Fumes, Mists, Vapors, and Gases §1529Asbestos

17 CCR, Division 1, Chapter 8 Accreditation, Certification, and Work Practices for Lead-Based Paint and Lead Hazards

22 CCR, Chapters 1020 §66260-66270, Hazardous Waste Regulation

California Coastal Act Public Resources Code, Division 20

California Assembly Bill AB 939 California Integrated Waste Management Act of 1989

California Assembly Bill AB 32 California Global Warming Solutions Act

Santa Barbara County Air Pollution Control District (SBAPCD) Rules & Regulations

1.1.1.3. U.S. GOVERNMENT

Asbestos Hazard Emergency Public Law 99-519, 15 USC Section 2651 Response Act of 1986 (AHERA)

Archaeological Resource 16 U.S.C. 470 aa-mm Protection Act of 1979

Clean Water Act of 1972 33 U.S.C., §1251 et seq.

Comprehensive environmental Response, Compensation, and Liability Act (CERCLA)

Government’s Green Procurement Section 6002, Federal Procurement of the Resource Program Conservation and Recovery Act (RCRA)

Endangered Species Act Public Law 93-205, 35 U.S.C. §1531

Energy Policy Act Public Law 109-58

Environmental Protection Agency Comprehensive Procurement Guidelines (EPA-CPG)

Environmental Protection Agency Toxic Substances Control Act (TSCA)

Executive Order 13112 Invasive Species

Executive Order 11990 Protection of Wetlands

Executive Order 13150 Federal Workforce Transportation

Executive Order 13186 Responsibilities of Federal Agencies to Protect Migratory Birds

Executive Order 13211 Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution or Use

Executive Order 13221 Energy Efficient Standby Power Devices

Executive Order 13423 Strengthening Federal Environmental, Energy and Transportation Management

Executive Order 13514 Federal Leadership in Environmental, Energy and Economic Performance

Marine Mammal Protection Act 50 CFR Part 218

Migratory Bird Treaty Act 16 U.S.C. 703-712

National Historic Preservation 16 U.S.C. 470 et seq. Act of 1966

National Environmental Policy Act Public Law 91-190

Native American Graves Protection Public Law 101-601 and Repatriation Act of 1990

American Indian Religious Freedom Public Law 95-341Act of 1978

White House Memorandum, Environmentally and Economically Beneficial Practices on Federal Landscaped Grounds

1.1.1.4. U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2003) Safety -- Safety and Health Requirements

WETLAND MANUAL Corps of Engineers Wetlands Delineation Manual Technical Report Y-87-1

1.1.1.5 U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

10 CFR 19 Notices, Instructions and Reports to Workers: Inspection and Investigations

10 CFR 20 Standards for Protection Against Radiation

10 CFR 36 Licenses and Radiation Safety Requirements for Irradiators

10 CFR 39 Licenses and Radiation Safety Requirements for Well Logging

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1910.120 Hazardous Waste Operations and Emergency Response

29 CFR 1926 Safety and Health Regulations for Construction

33 CFR 328 Definitions of Waters of the United States

40 CFR 61 National Emission Standards for Hazardous Air Pollutants (NESHAPS)

40 CFR 68 Chemical Accident Prevention Provisions

40 CFR 82 Protection of Stratospheric Ozone

40 CFR 112 Oil Pollution Prevention

40 CFR 122.26 Storm Water Discharges (Applicable to State NPDES Programs, see section 123.25)

40 CFR 152 - 186 Pesticide Programs

40 CFR 190 Environmental Radiation Protection Standards for Nuclear Power Operations

40 CFR 191 Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes

40 CFR 192 Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings

40 CFR 241 Guidelines for Disposal of Solid Waste 40 CFR 243 Guidelines for the Storage and Collection of residential, Commercial, and Institutional Solid Waste

40 CFR 258 Subtitle D Landfill Requirements

40 CFR Parts 260-273 Hazardous Waste Regulations

40 CFR 279 Standards for the Management of Used Oil

40 CFR 28 Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks (UST)

40 CFR 300 National Oil and Hazardous Substances Pollution Contingency Plan

40 CFR 302 Designation, Reportable Quantities, and Notification

40 CFR 355 Emergency Planning and Notification

40 CFR 372-Subpart D Specific Toxic Chemical Listings

40 CFR 761 PCB Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions

40 CFR 763 Asbestos-Containing Materials in Schools

49 CFR 171 – 178 Hazardous Materials Regulations

1.2. DEFINITIONS

1.2.1. Environmental pollution and damage: the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.

1.2.2. Environmental protection: the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.2.3. Contractor Generated Hazardous Waste: materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners, excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.

1.2.4. Pesticide: any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.

1.2.5. Pests: arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.

1.2.6. Land Application: for discharge water implies that the Contractor must discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur.

Land Application must be in compliance with all applicable Federal, State, and local laws and regulations.

1.2.7. Surface Discharge: implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "waters of the United States" and would require a permit to discharge water from the governing agency.

1.2.8. Waters of the United States: All waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR 328.

1.2.9. Wetlands: Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, and bogs. Official determination of whether or not an area is classified as a wetland must be done in accordance with all applicable Federal, State, and local laws and regulations.

1.2.10. Sediment: Soil and other debris that have eroded and have been transported by runoff water or wind.

1.2.11. Solid Waste: Garbage, refuse, debris, sludge, or other discharged material, including solid, liquid, semisolid, or contained gaseous materials resulting from domestic, industrial, commercial, mining, or agricultural operations. Types of solid waste typically generated at construction sites may include:

1.2.11.1. Green waste: The vegetative matter from landscaping, land clearing and grubbing, including but not limited to, grass, bushes, scrubs, small trees and saplings, tree stumps and plant roots. Marketable trees, grasses and plants that are indicated to remain, be re-located, or be re-used are not included.

1.2.11.2. Surplus soil: Existing soil that is in excess of what is required for this work, including aggregates intended, but not used, for on-site mixing of concrete, mortars and paving. Contaminated soil meeting the definition of hazardous material or hazardous waste is not included.

1.2.11.3. Debris: Non-hazardous solid material generated during the construction, demolition, or renovation of a structure which exceeds 60 mm 2.5 inch particle size that is: a manufactured object; plant or animal matter; or natural geologic material (e.g. cobbles and boulders), broken or removed concrete, masonry, and rock asphalt paving; ceramics; roofing paper and shingles. Inert materials [may] [may not] be reinforced with or contain ferrous wire, rods, accessories and weldments. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.

1.2.11.4. Wood: Dimension and non-dimension lumber, plywood, chipboard, hardboard. Treated and/or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included.

1.2.11.5. Scrap metal: Scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe and wire that are recovered or collected and disposed of as scrap. Scrap metal meeting the definition of hazardous material or hazardous waste is not included.

1.2.11.6. Paint cans: Metal cans that are empty of paints, solvents, thinners and adhesives. If permitted by the paint can label, a thin dry film may remain in the can.

1.2.11.7. Recyclables: Materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable. Metal meeting the definition of lead contaminated or lead based paint contaminated [may] [may not] be included as recyclable if sold to a scrap metal company. Paint cans [may] [may not] be included as recyclable if sold to a scrap metal company.

1.2.11.8. Hazardous Waste: By definition, to be a hazardous waste a material must first meet the definition of a solid waste. Hazardous waste and hazardous debris are special cases of solid waste. They have additional regulatory controls and must be handled separately. They are thus defined separately in this document.

1.2.11.9. Material not regulated as solid waste: Nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended; suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges; regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.

1.2.12. Garbage: Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

1.2.13. Chemical Waste: This includes salts, acids, alkalizes, herbicides, pesticides, and organic chemicals.

1.2.14. Hazardous Waste: Any discarded material, liquid, solid, or gas, which meets the definition of hazardous material or is designated hazardous waste by the Environmental Protection Agency or State Hazardous Control Authority as defined in 40 CFR 260, 40 CFR 261, 40 CFR 262, 40 CFR 263, 40 CFR 264, 40 CFR 265, 40 CFR 266, 40 CFR 268, 40 CFR 270, 40 CFR 271, 40 CFR 272, 40 CFR 273, 40 CFR 279, and 40 CFR 280.

1.2.15. Hazardous Debris: As defined in Solid Waste paragraph, debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) per 40 CFR 261; or debris that exhibits a characteristic of hazardous waste per 40 CFR 261.

1.2.16. Hazardous Materials: Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172.

Hazardous material is any material that: Is regulated as a hazardous material per 49 CFR 173, or Requires a Material Safety Data Sheet (MSDS) per 29 CFR 1910.120, or During end use, treatment, handling, packaging, storage, transpiration, or disposal meets or has components that meet or have potential to meet the definition of a hazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D. Designation of a material by this definition, when separately regulated or controlled by other instructions or directives, does not eliminate the need for adherence to that hazard-specific guidance which takes precedence over this instruction for "control" purposes. Such material include ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs). Nonetheless, the exposure may incur incident to manufacture, storage, use and demilitarization of these items.

1.2.17. Waste Hazardous Material (WHM): Any waste material which because of its quantity, concentration, or physical, chemical, or infectious characteristics may pose a substantial hazard to human health or the environment and which has been so designated. Used oil not containing any hazardous waste, as defined above, falls under this definition.

1.2.18. Oily Waste: Those materials which are, or were, mixed with used oil and have become separated from that used oil. Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, used oil and may be appropriately tested and discarded in a manner which is in compliance with other State and local requirements. This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that:

It is not prohibited in other State regulations or local ordinances, the amount generated is "de minimis" (a small amount), it is the result of minor leaks or spills resulting from normal process operations, all free-flowing oil has been removed to the practical extent possible large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, a hazardous waste determination must be performed prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.

1.2.19. Regulated Waste: Those solid waste that have specific additional Federal, state, or local controls for handling, storage, or disposal.

1.2.20. Ozone Depleting Substance (ODS): Class I ODS is defined in Section 602(a) of The Clean Air Act and includes the following chemicals:

chlorofluorocarbon-11 (CFC-11) chlorofluorocarbon-12 (CFC-12) chlorofluorocarbon-13 (CFC-13) chlorofluorocarbon-111 (CFC-111) chlorofluorocarbon-112 (CFC-112) chlorofluorocarbon-113 (CFC-113) chlorofluorocarbon-114 (CFC-114) chlorofluorocarbon-115 (CFC-115) chlorofluorocarbon-211 (CFC-211) chlorofluorocarbon-212 (CFC-212) chlorofluorocarbon-213 (CFC-213) chlorofluorocarbon-214 (CFC-214) chlorofluorocarbon-215 (CFC-215) chlorofluorocarbon-216 (CFC-216) chlorofluorocarbon-217 (CFC-217) chlorofluorocarbon-500 (CFC-500) chlorofluorocarbon-502 (CFC-502) chlorofluorocarbon-503 (CFC-503) halon-1211 halon-1301 halon-2402 carbon tetrachloride methyl bromide methyl chloroform

Class II ODS is defined in Section 602(s) of The Clean Air Act includes the following chemicals:

hydrochlorofluorocarbon-21 (HCFC-21) hydrochlorofluorocarbon-22 (HCFC-22) hydrochlorofluorocarbon-31 (HCFC-31) hydrochlorofluorocarbon-121 (HCFC-121) hydrochlorofluorocarbon-122 (HCFC-122) hydrochlorofluorocarbon-123 (HCFC-123) hydrochlorofluorocarbon-124 (HCFC-124) hydrochlorofluorocarbon-131 (HCFC-131) hydrochlorofluorocarbon-132 (HCFC-132) hydrochlorofluorocarbon-133 (HCFC-133) hydrochlorofluorocarbon-141 (HCFC-141) hydrochlorofluorocarbon-142 (HCFC-142) hydrochlorofluorocarbon-221 (HCFC-221) hydrochlorofluorocarbon-222 (HCFC-222) hydrochlorofluorocarbon-223 (HCFC-223) hydrochlorofluorocarbon-224 (HCFC-224) hydrochlorofluorocarbon-225 (HCFC-225) hydrochlorofluorocarbon-226 (HCFC-226) hydrochlorofluorocarbon-231 (HCFC-231) hydrochlorofluorocarbon-232 (HCFC-232) hydrochlorofluorocarbon-233 (HCFC-233) hydrochlorofluorocarbon-234 (HCFC-234) hydrochlorofluorocarbon-235 (HCFC-235) hydrochlorofluorocarbon-241 (HCFC-241) hydrochlorofluorocarbon-242 (HCFC-242) hydrochlorofluorocarbon-243 (HCFC-243) hydrochlorofluorocarbon-244 (HCFC-244) hydrochlorofluorocarbon-251 (HCFC-251) hydrochlorofluorocarbon-252 (HCFC-252) hydrochlorofluorocarbon-253 (HCFC-253) hydrochlorofluorocarbon-261 (HCFC-261) hydrochlorofluorocarbon-262 (HCFC-262) hydrochlorofluorocarbon-271 (HCFC-271)

1.2.21. Universal Waste: The universal waste regulations streamline collection requirements for certain hazardous wastes in the following categories: batteries, pesticides, mercury-containing equipment (e.g., thermostats) and lamps (e.g., fluorescent bulbs). The rule is designed to reduce hazardous waste in the municipal solid waste (MSW) stream by making it easier for universal waste handlers to collect these items and send them for recycling or proper disposal. These regulations can be found at 40 CFR 273.

1.3 SUBMITTALS.

The Contractor shall submit the following to 30 CES/CEAN and the Contracting Officer for Government review in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

Environmental Protection Plan: G, 30 CES/CEAN (Section 3.2).

Air Emissions data: G, 30 CES/CEAN (Section 3.6).

Source Profile Form for boilers/hot water heaters, 30 SW Form 155/156; G, 30 CES/CEAN (Section 3.6).

Boiler Emission Standards and/or source test with applicable compliance certifications data that complies with applicable SBAPCD rule requirements; G, 30 CES/CEAN (Section 3.6).

Monthly Hazardous Material (HAZMAT) usage totals; G, 30 CES/CEAN (Section 3.8.c).

HAZMAT Business Plan or HAZMAT Disclaimer; G, 30 CES/CEAN (Section 3.8.d).

A Recovered Materials Determination Form (RMDF); G, 30 CES/CEAN (Section 3.18.b).

An Estimate of Percentage of Recovered Material Content for EPA-Designated Products; G, 30 CES/CEAN (Section 3.18.d).

Monthly Solid Waste Report, to include the weight and quantity of the Solid Waste and Construction & Demolition debris disposed of off-base for recycling and reuse and not disposed in a local landfill; G, 30 CES/CEAN (Section 3.5.2.c. 8).

Industrial Wastewater Treatment Pond Processing Request; G, 30 CES/CEAN (Section 3.3.4).

Discharge to Grade Characterization Form; G, 30 CES/CEAN (Section 3.3.6).

Notice of Intent (NOI) to comply with the Terms of the General Permit to Discharge Storm Water Associated with Construction Activity; G, 30 CES/CEAN (Section 3.4.3).

Risk Assessment; G, 30 CES/CEAN (Section 3.4.2)

Draft and Final Storm Water Pollution Prevention Plan (SWPPP) and amendments; G, 30 CES/CEAN (Section 3.4.2).

Annual SWPPP Report; G, 30 CES/CEAN (Section 3.4.2).

Notice of Termination of Coverage under the Storm Water Construction General Permit (NOT) (Section 3.4.2).

Inspection Reports; G, 30 CES/CEAN (Section 3.4.2)

Noncompliance Reports; G, 30 CES/CEAN (Section 3.4.2)

Aboveground Storage Tank (AST) technical information; G, 30 CES/CEAN (Section 3.15.b)

30 SW Form 160 Air Quality Recordkeeping Form Fuel Storage Tanks; G, 30 CES/CEAN

1.4. ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, State, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution. The Contractor may be required to promptly conduct tests and procedures for the purpose of assessing whether construction operations are in compliance with Applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

1.4.1. Conformance with the Environmental Management System: The Contractor shall perform work under this contract consistent with the policy and objectives identified in the installation's Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to objectives and targets, environmental programs and operational controls identified by the EMS. The Contractor will provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, the Contractor shall take corrective and/or preventative actions. In addition, the Contractor shall ensure that its employees are aware of their roles and responsibilities under the EMS and how these EMS roles and responsibilities affect work performed under the contract. The Contractor is responsible for ensuring that their employees receive applicable environmental and occupational health and safety training, and keep up to date on regulatory required specific training for the type of work to be conducted onsite. All on-site Contractor personnel, and their subcontractor personnel, performing tasks that have the potential to cause a significant environmental impact shall be competent on the basis of appropriate education, training or experience. Upon contract award, the Contracting Officer's Representative will notify the installation's EMS coordinator to arrange EMS training. Refer to the Installation’s EMS Coordinator for additional site specific EMS requirements related to construction. The installation's EMS coordinator shall identify training needs associated with environmental aspects and the EMS, and arrange training or take other action to meet these needs. The Contractor shall provide training documentation to the Contracting Officer.

The EMS coordinator shall retain associated records.

1.5. QUALITY ASSURANCE:

1.5.1. Preconstruction Survey: Not used unless directed by the Contracting Officer. Environmental Impact Analysis is conducted via AF Form 813 for all construction activities.

1.5.2. Regulatory Notifications: The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Air Force must also provide public notification (such as storm water permitting), the Contractor must coordinate with the Contracting Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer prior to commencement of work activities. Typically, regulatory notifications must be provided for the following (this listing is not all inclusive): demolition, renovation, NPDES defined site work, remediation of controlled substances (asbestos, hazardous waste, lead paint).

1.5.3. Environmental Brief: Attend an environmental brief to be included in the preconstruction meeting.

Provide the following information: types, quantities, and use of hazardous materials that will be brought onto the activity; types and quantities of solid wastes and/or wastewater that may be generated during the contract. Discuss the results of the Environmental Impact Analysis at this time. Prior to initiating any work on site, meet with the Contracting Officer and activity environmental staff to discuss the proposed Environmental Management Plan. Develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural resources, required reports, required permits, permit requirements, and other measures to be taken.

1.5.4. Environmental Manager: Appoint in writing an Environmental Manager for the project site. The Environmental Manager will be directly responsible for coordinating contractor compliance with Federal, State, local, and station requirements. The Environmental Manager will ensure compliance with Hazardous Waste Program requirements (including hazardous waste handling, storage, manifesting, and disposal are all conducted in accordance with installation requirements and applicable laws and regulations); implement the Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials (authorizations, storage, handling, and reporting) requirements; and coordinate any remediation of regulated substances (lead, asbestos, PCB transformers). This can be a collateral position; however the person in this position must be trained to adequately accomplish the following duties:

ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements in accordance with their position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

1.5.5. Contractor 40 CFR Employee Training Records - Prepare and maintain employee training records throughout the term of the contract meeting applicable 40 CFR requirements. [The Contractor will ensure every employee completes a program of classroom instruction or on-the-job training that teaches them to perform their duties in a way that ensures compliance with Federal, State and local regulatory requirements for RCRA Large Quantity Generator. The Contractor will provide a Position Description for each employee, by subcontractor, based on the Davis-Bacon Wage Rate designation or other equivalent method, evaluating the employee's association with hazardous and regulated wastes. This Position Description will include training requirements as defined in 40 CFR 265 for a Large Quantity Generator facility.] Submit these training records to the Contracting Officer at the conclusion of the project, unless otherwise directed.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION

3.1. ENVIRONMENTAL COMPLIANCE REQUIREMENTS

3.1.1. Submittals:

3.1.2. General: Vandenberg Air Force Base (VAFB) Contractors, and their subcontractors, shall comply with the most stringent federal, state, and local environmental laws, regulations, and Air Force policies, instructions, and plans. The federal Government is not exempt from compliance with environmental regulations. The Contractor shall maintain an awareness of changing environmental regulatory requirements to avoid environmental deficiencies for activities on VAFB.

3.1.3. Environmental Coordination: The 30th Civil Engineer Squadron, Asset Management Flight (30 CES/CEAN) is the single point of contact for coordination with all environmental regulatory agencies.

Prior to coordinating with any environmental regulatory agency, the contractor shall obtain approval from 30 CES/CEAN. The Contractor shall provide copies of any regulatory agency notification, report, consultation, permit, and/or regulatory document to 30 CES/CEAN. Obtaining and complying with all environmental permits and commitments required by Federal, State, Regional, and local environmental laws and regulations is the Contractor's responsibility.

(1) The Contractor shall comply with all permit conditions and consultation requirements.

(2) The Contractor shall provide all required testing analysis and monitoring.

(3) The contractor may obtain VAFB environmental documents and plans from 30 CES/CEAN.

3.1.4. Environmental Planning: The Contractor shall comply with all testing, monitoring, record keeping, reporting, mitigation, and protection measure requirements resulting from the National Environmental Policy Act (NEPA), the Environmental Impact Analysis Process (EIAP), and the VAFB 332 process. To initiate NEPA and EIAP, submit an AF Form 813 to the Planning Office in 30 CES/CEAO. Completion of the NEPA and EIAP processes can take between three weeks to one year to complete. Early coordination is highly advised.

3.1.5. Environmental Audits/Inspections: The Contractor shall support the Government with all federal, state, local, and Air Force environmental inspections, audits, or assessments.

3.1.6. Notices of Violations (NOV): The Contractor shall be liable for any Notices of Violation (NOV), enforcement action, fine, penalty, and/or corrective action imposed by federal, state, or local environmental regulatory agencies for activities under the Contractor’s control. The Contractor shall provide verbal notification to 30 CES/CEAN and the Contracting Officer within 24-hours of receiving an NOV followed by written notification within three (3) working days.

3.2 ENVIRONMENTAL PROTECTION PLAN: Prior to initiating any work on site, the Contractor will meet with the Contracting Officer to discuss the proposed Environmental Protection Plan and develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural resources, required reports, and other measures to be taken. The Contractor's Environmental Plan shall incorporate construction related objectives and targets from the installation's Environmental Management System. The Environmental Management Plan will be submitted in the following format and shall include the elements specified below.

a. Description of the Environmental Protection Plan

(1) The Contractor’s EPP shall include a Scope of Work, Environmental Impact Analysis document (Base Civil Engineer Work Request, AF Form 813 or Finding of No Significant Impact), Contractor contact information and shall describe how they will meet environmental compliance requirements and address their methods, procedures, and practices pertaining to: Air quality, to include a listing of all combustion source equipment with appropriate CARB registration and SBCAPCD permits, ozone depleting substances (ODS) and greenhouse gases (GHG); Hazardous waste management; Hazardous materials management, to include spill/release management; Lead-based paint management; Asbestos management; Green Procurement; Solid waste and construction debris management, to include recycled/recovered materials;

Water quality to include waste water, drinking water and storm water; Cultural resources protection;

Natural resources protection; PCBs; Underground storage tanks; and Contaminated Soils Managment. The Contractor shall maintain a copy of the EPP on-site. The Contractor shall brief their personnel of the contents and procedures in the EPP and ensure pertinent information is disseminated to subcontractors in order to maintain compliance.

3.2.1 Environmental Protection Plan Review: Within thirty days after the Contract award date, submit the proposed Environmental Protection Plan for further discussion, review, and approval. Commencement of work will not begin until the Environmental Protection Plan has been approved.

3.2.2 Licenses and Permits: Obtaining and complying with all environmental permits and commitments required by Federal, State, Regional, and local environmental laws and regulations is the Contractor's responsibility. The following existing permits will be followed by the Contractor:

a. State Water Resources Control Board National Pollutant Discharge Elimination System (NPDES) General Permit Order No. 2009-0009-DWQ (Construction General Permit); However, Contractor is required to obtain coverage if applicable. Refer to Section 3.4.2.

b. NPDES Permit for Pesticides

c. VAFB Landfill Permit

d. Clean Water Act 401/402/404 Permits (if applicable)

e. Lompoc Publicly Owned Treatment Works (POTW) Permit (Permit # I004)

(1) The following permits will be obtained by the contractor: California Air Resource Board (CARB) Registration and SBCAPCD Permits.

(2) The Contractor is responsible for conforming to all permit requirements and performing all quality control inspections of the work in progress, and to submit notifications and certifications to the applicable regulatory agency via the Contracting Officer.

3.3 PROTECTION OF NATURAL RESOURCES: Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work.

a. General: The Contractor shall comply with, but not limited to: the National Environmental Policy Act (NEPA); the Endangered Species Act; the Marine Mammal Protection Act, the Migratory Bird Treaty Act, Executive Order 11990, Protection of Wetlands; Executive Order 13112, Executive Order 13186, California Coastal Act of 1976; AFI 32-7064, Conservation and Management of Natural Resources; and Vandenberg's Integrated Natural Resources Management Plan. If the work is near streams, lakes, or other waterways, conform to the national permitting requirements of the Clean Water Act. The Contractor shall keep activities under surveillance and control to minimize disturbances and damage to the natural resources on VAFB.

b. Notification: The Contractor shall immediately notify 30 CES/CEAN, Chief of Natural Resources, if the Contractor or their biological monitors suspect the presence and impacts to any federally listed endangered or threatened species or their habitat. Vandenberg currently manages for 15 threatened and endangered species, including but not limited to the California red-legged frog, unarmored three-spine stickleback, western snowy plover, California least tern, Gaviota tar plant, and fairy shrimp.

c. Encountering Natural Resources: The Contractor shall not feed wild animals or cause litter (especially from lunch activities). The Contractor shall not travel in unauthorized areas in order to avoid disturbing sensitive resources or potentially coming in contact with ticks, hantavirus, wild animals, unstable coastline areas, and unsafe water situations.

d. Nesting Sites: The Contractor shall immediately notify 30 CES/CEAN of any nesting sites for avian species, nesting sites containing eggs and/or chicks, or roosting bats.

e. Disturbance of Plants: Contractors shall adhere to requirements stated in the AF Form 332, AF Form 813 or Environmental Assessment with respect to disturbance or removal of all plants and trees on VAFB.

Mitigation may be required.

3.3.1. Erosion and Sediment Control Measures

When soil disturbance is one acre or more refer to Section 3.4.2 Construction General Permit Stormwater Requirements . Refer to Section 3.17, Landscaping.

3.3.1.1 Burnoff: Burnoff of the ground cover is not permitted.

3.3.1.2 Protection of Erodible Soils and Sediment Control:

a. Provide erosion control for side slopes and back slopes upon completion of final grading. Plan and conduct earthwork to minimize the duration of exposure of unprotected soils.

b. Refer to Section 3.17, Landscaping and Section 3.4.1, Storm Water Best Management Practices. If soil disturbance is one acre or more, refer to Section 3.4.2, Construction General Permit Stormwater Requirements.

3.4 GENERAL PERMIT, STORM WATER NOTICE OF INTENT

3.4.1 Storm Water Best Management Practices (BMPs): The Contractor shall implement and maintain BMPs in or similar to the 2009 California Stormwater BMP Manual (California Stormwater Quality Association) to effectively prevent sediment, chemicals, or other pollutants from migrating into the storm water system, Waters of the U.S. and surface waters via stormwater, non-stormwater or wind. The 2007 Off-Highway Vehicle BMP Manual for Erosion and Sediment Control (California Department of Parks and Recreation) may also be referenced for erosion and sediment control. BMPs will include erosion and sediment controls, tracking controls, vehicle and equipment fueling and maintenance, spill prevention and control, concrete waste management, solid waste management, liquid waste management and stockpile management.

a. Exposed soils remaining upon completion of construction shall be permanently stabilized with vegetation to prevent erosion due to wind and rain. Refer to Section 3.17, Landscaping. When the construction activity is covered by the Construction General Permit refer to Section 4.3.2 and the Construction General Permit for Conditions for Termination of Coverage.

b. Netting of fiber rolls (wattles) and erosion control blankets shall be of biodegradable material only.

c. Do not use sand bags as inlet and drainage protection. Use gravel bags, inlet protection devices, inlet covers or absorbents as applicable.

d. Do not use straw bales for sediment control.

3.4.2. Construction General Permit Stormwater Requirements

a. The contractor shall obtain coverage under the State Water Resources Control Board (SWRCB) NPDES General Permit CAS000002 (Order No. 2009-0009-DWQ) (Construction General Permit) for construction activities of one acre or greater of disturbed soil. Contact 30 CES/CEA Water Resources one month prior to construction to begin the process.

b. A Storm Water Pollution Prevention Plan (SWPPP) and Risk Assessment shall be developed by a Qualified Developer per the Construction General Permit. The Contractor shall provide a draft and final copy of their SWPPP and Risk Assessment to 30 CES/CEA for review and certification by 30 CES/CC or

CD.

c. The Contractor shall assist 30 CES/CEANQ with electronic filing of Permit Registration Documents (NOI, Risk Assessment, SWPPP, and Signed Certification Statement) with the SWRCB. The Contractor shall file the associated annual fee with the SWRCB.

d. SWPPP Implementation: The Contractor shall implement a SWPPP, including but not limited to BMPs, inspections, reporting and Sampling and Analysis requirements, in accordance with the Construction General Permit. Contractor personnel implementing SWPPPs shall meet Permit requirements for Qualified Stormwater Inspectors and shall have attended one storm water Construction General Permit compliance and BMP training within the last five years. The Contractor shall maintain a current copy of their SWPPP at the construction site per the permit requirements and shall provide a copy of any amendments to 30 CES/CEA Water Resources. The Contractor shall provide copies of required inspection forms, Construction Site and Run-on Evaluations and effluent monitoring results (as applicable) to 30 CES/CEA Water Resources.

e. Annual Report:

The Contractor shall provide 30 CES/CEA Water Resources, an unsigned Annual Report by 15 August every year that the permit is active (between 1 July of the current year and 30 June of the previous year and for which a Notice of Termination (NOT) has not been submitted). 30 CES/CEA will obtain certification from 30 CES/CC or CD. 30 CES shall electronically file the Annual Report with the SWRCB by the due date of 1 September. As part of the annual report, The Contractor shall electronically submit water quality sampling results to the SWRCB. The Contractor shall pay their annual fee before the end of their billing month every year until the NOT has been approved. This requirement may be waived by the SWRCB upon 30 CES/CEA request.

f. Notice of Termination of Coverage under the General Construction Storm Water Permit (NOT). The Construction General Permits’ Conditions for Termination of Coverage have been met prior to NOT submittal. Vegetation shall cover 70 percent of 100 percent of the disturbed soil area or it must be demonstrated that the site will not pose any additional sediment discharge risk per the Construction General Permit Conditions. Refer to Section 3.17, Landscaping. The Contractor shall submit the unsigned NOT and photos of the entire stabilized disturbed soil area to 30 CES/CEA Water Resources. 30 CES/CEA will obtain the required certification signature from 30 CES/CC or CD. 30 CES shall electronically file the NOT with the SWRCB. It may take several months before a NOT can be approved by the SWRCB.

Permit requirements are still enforceable until the NOT is approved by the Regional Water Quality Control Board. Once construction is completed, the Contractor will be required to perform storm water inspection monitoring, Best Management Practice maintenance and may be required to repair erosion, reseed, mulch and provide irrigation to ensure seeded or planted areas achieve 70 percent soil coverage. This may affect your contract closure efforts and the Contract Officer should be notified.

3.4.3. Energy Independence and Security Act (EISA) Section 438 If the project involves development or redevelopment of a footprint that exceeds 5,000 square feet use site design and storm water management controls for the site drainage area or areas to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the drainage area or areas with regard to the temperature, rate, volume, and duration of flow. Development or redevelopment refer to action that results in the alteration of the landscape during construction of buildings or other infrastructure such as parking lots, roads, etc.

Provide Maximum Extent Technically Feasible Determination to 30 CES/CEA Water Resources.

3.5. HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES MANAGEMENT

a. General: The Contractor shall comply with, but not limited to: the National Historic Preservation Act of 1966, Archaeological Resources Protection Act of 1979, Native American Graves Protection and Repatriation Act of 1990, American Indian Religious Freedom Act of 1978, State of California Health and Safety Statutes; and AFI 32-7065, Cultural Resources Management.

b. Base Historic Preservation Officer (BHPO): The Contractor shall not disturb any historical, archaeological, or cultural sites or collect any prehistoric and/or historic artifacts on VAFB without proper authorization from 30 CES/CEAN, BHPO.

c. Cultural Resources: Cultural resources are sites, structures, features, artifacts, and other human derived items. These include, but are not limited to: arrowheads and other flaked stone tools, beads, ornaments, sacred objects such as charmstones, hammerstones, stone bowls, bone tools, human remains, non-human bone, charcoal concentrations, unnatural concentrations of stone, shellfish remains, fossils, asphaltum,old bottles, cans, coins, buttons, antiques, foundations, early military materials, and other historical items. As a general rule, any cultural resource item over 50 years of age is protected. If any previously unidentified materials of these types are found individually or in concentrated deposits within the project area, the Contractor shall report these to the on-site CEAN environmental representative archaeological monitor, CEAN, or the BHPO. Cultural resources are not to be collected or disturbed without approval from the on-site archaeological monitor or the BHPO.

d. Avoidance and Mitigation: The Contractor is responsible, unless otherwise noted, for implementation of any cultural resources avoidance or mitigation measures assigned to projects as a condition of approval for their activities.