Painting Exhibit A, Pricing Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_05,_Firm_Fixed_Price_TO_Worksheet.pdf | ||
| Attachment_06,_VAFB__Facilities_Excellence_Stds_18_Apr_2017.pdf | ||
| Draft_RFP.pdf | ||
| Attachment_01,_Base_Wide_Paint_-Corrosion__SOW_2018.pdf | ||
| Attachment_03,__Evironmental_Compliance.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4610-12-R-0004
Attachment 6
Exhibet A, Pricing Schedule
SUBLINE
ITEM TASK ESTIMATED
WORKLOAD
UNIT OF
MEASURE UNIT PRICE ESTIMATED AMOUNT
3001AA Exterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1 890,500 SF $ - 3001AB Second coat of finish, exterior. Par: 1.2.9.2 890,500 SF $ - 3001AC Contaminant testing and reports. Par: 1.2.9.3 15 EA $ - 3001AD Power wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4 890,500 SF $ -
3001AE Power wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.5 3,600
SF
3001AF Wet scraping. Par: 1.2.9.6 3,500 SF $ - 3001AG Power tooling. Par: 1.2.9.7 5,500 SF $ - 3001AH Exterior bond prep. Par: 1.2.9.8 155,025 SF $ - 3001AJ Rust inhibiting primer. Par: 1.2.9.9 89,000 SF $ - 3001AK Block sealing. Par: 1.2.10 16,000 SF $ - 3001AL Elastomeric coating Par: 1.2.11 11,750 SF $ - 3001AM Coating, Rust Bond FC: 1.2.13.1 52,000 SF $ - 3001AN Coating, Carbomastic 15: 1.2.13.2 52,000 SF $ - 3001AO Coating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.3 52,000 SF $ - 3001AP Abrasive blast cleaning: Par 1.2.14 5,500 SF $ - 3001AQ Stucco repair. Par: 1.2.15 20 EA $ - 3001AR Basewide traffic striping. Par: 1.3.1 130,945 LF $ - 3001AS Parking lot striping. Par: 1.3.2 15,250 LF $ - 3001AT Directional arrows. Par: 1.3.3 30 EA $ - 3001AU Handicapped parking. Par: 1.3.4 25 EA $ - 3001AV Other traffic markings. Par: 1.3.5 7,500 SF $ - 3001AW Striping and marking of airfields & helipads. Par: 1.3.6 12,000 SF $ - 3001AX Interior protective coating, one coat of finish. Par: 1.4.3 78,125 SF $ - 3001AY Hospital interior, one coat of finish. Par: 1.4.4 1,000 SF $ - 3001AZ Bed and tape drywall surfaces. Par: 1.4.5 950 SF $ - 3001BA Apply texture, hand or machine. Par: 1.4.6 2,375 SF $ - 3001BB Prime interior walls. Par: 1.4.7 78,500 SF $ - 3001BC Patch holes in drywall up to one square foot each in size. Par: 1.4.8 30 EA $ - 3001BD Wallpaper removal. Par: 1.4.9 2,500 SF $ - 3001BE Epoxy coating. Par: 1.5.1 8,575 SF $ - 3001BF Urethane coating: Par. 1.5.2 8,575 SF $ - 3001BG Nonskid coating. Par: 1.5.3 3,000 SF $ - 3001BH Concrete floor layout and painting. Par: 1.5.4 600 LF $ - 3001BJ Work other than normal duty hours multiplier: Par. 1.6 2,010 SF $ - 3001BK Non priced items: Para. 1.7 5,000 SF $ -
$ - Estimated Total
DRAFT
SUBLINE
ITEM TASK ESTIMATED
WORKLOAD
UNIT OF
MEASURE UNIT PRICE ESTIMATED AMOUNT
0001AA Exterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1 890,500 SF $ - 0001AB Second coat of finish, exterior. Par: 1.2.9.2 890,500 SF $ - 0001AC Contaminant testing and reports. Par: 1.2.9.3 15 EA $ - 0001AD Power wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4 890,500 SF $ -
0001AE Power wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.5 3,600
SF
0001AF Wet scraping. Par: 1.2.9.6 3,500 SF $ - 0001AG Power tooling. Par: 1.2.9.7 5,500 SF $ - 0001AH Exterior bond prep. Par: 1.2.9.8 155,025 SF $ - 0001AJ Rust inhibiting primer. Par: 1.2.9.9 89,000 SF $ - 0001AK Block sealing. Par: 1.2.10 16,000 SF $ - 0001AL Elastomeric coating Par: 1.2.11 11,750 SF $ - 0001AM Coating, Rust Bond FC: 1.2.13.3 52,000 SF $ - 0001AN Coating, Carbomastic 15: 1.2.13.2 52,000 SF $ - 0001AO Coating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.3 52,000 SF $ - 0001AP Abrasive blast cleaning: Par 1.2.14 5,500 SF $ - 0001AQ Stucco repair. Par: 1.2.15 20 EA $ - 0001AR Basewide traffic striping. Par: 1.3.1 130,945 LF $ - 0001AS Parking lot striping. Par: 1.3.2 15,250 LF $ - 0001AT Directional arrows. Par: 1.3.3 30 EA $ - 0001AU Handicapped parking. Par: 1.3.4 25 EA $ - 0001AV Other traffic markings. Par: 1.3.5 7,500 SF $ - 0001AW Striping and marking of airfields & helipads. Par: 1.3.6 12,000 SF $ - 0001AX Interior protective coating, one coat of finish. Par: 1.4.3 78,125 SF $ - 0001AY Hospital interior, one coat of finish. Par: 1.4.4 1,000 SF $ - 0001AZ Bed and tape drywall surfaces. Par: 1.4.5 950 SF $ - 0001BA Apply texture, hand or machine. Par: 1.4.6 2,375 SF $ - 0001BB Prime interior walls. Par: 1.4.7 78,500 SF $ - 0001BC Patch holes in drywall up to one square foot each in size. Par: 1.4.8 30 EA $ - 0001BD Wallpaper removal. Par: 1.4.9 2,500 SF $ - 0001BE Epoxy coating. Par: 1.5.1 8,575 SF $ - 0001BF Urethane coating: Par. 1.5.2 8,575 SF $ - 0001BG Nonskid coating. Par: 1.5.3 3,000 SF $ - 0001BH Concrete floor layout and painting. Par: 1.5.4 600 LF $ - 0001BJ Work other than normal duty hours multiplier: Par. 1.6 2,010 SF $ - 0001BK Non priced items: Para. 1.7 5,000 SF $ -
$ - Basic Period Estimated Total
WORKLOAD
UNIT OF
MEASURE UNIT PRICE ESTIMATED AMOUNT
1001AA Exterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1 890,500 SF $ - 1001AB Second coat of finish, exterior. Par: 1.2.9.2 890,500 SF $ - 1001AC Contaminant testing and reports. Par: 1.2.9.3 15 EA $ - 1001AD Power wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4 890,500 SF $ -
1001AE Power wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.5 3,600
SF
1001AF Wet scraping. Par: 1.2.9.6 3,500 SF $ - 1001AG Power tooling. Par: 1.2.9.7 5,500 SF $ - 1001AH Exterior bond prep. Par: 1.2.9.8 155,025 SF $ - 1001AJ Rust inhibiting primer. Par: 1.2.9.9 89,000 SF $ - 1001AK Block sealing. Par: 1.2.10 16,000 SF $ - 1001AL Elastomeric coating Par: 1.2.11 11,750 SF $ - 1001AM Coating, Rust Bond FC: 1.2.13.1 52,000 SF $ - 1001AN Coating, Carbomastic 15: 1.2.13.2 52,000 SF $ - 1001AO Coating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.3 52,000 SF $ - 1001AP Abrasive blast cleaning: Par 1.2.14 5,500 SF $ - 1001AQ Stucco repair. Par: 1.2.15 20 EA $ - 1001AR Basewide traffic striping. Par: 1.3.1 130,945 LF $ - 1001AS Parking lot striping. Par: 1.3.2 15,250 LF $ - 1001AT Directional arrows. Par: 1.3.3 30 EA $ - 1001AU Handicapped parking. Par: 1.3.4 25 EA $ - 1001AV Other traffic markings. Par: 1.3.5 7,500 SF $ - 1001AW Striping and marking of airfields & helipads. Par: 1.3.6 12,000 SF $ - 1001AX Interior protective coating, one coat of finish. Par: 1.4.3 78,125 SF $ - 1001AY Hospital interior, one coat of finish. Par: 1.4.4 1,000 SF $ - 1001AZ Bed and tape drywall surfaces. Par: 1.4.5 950 SF $ - 1001BA Apply texture, hand or machine. Par: 1.4.6 2,375 SF $ - 1001BB Prime interior walls. Par: 1.4.7 78,500 SF $ - 1001BC Patch holes in drywall up to one square foot each in size. Par: 1.4.8 30 EA $ - 1001BD Wallpaper removal. Par: 1.4.9 2,500 SF $ - 1001BE Epoxy coating. Par: 1.5.1 8,575 SF $ - 1001BF Urethane coating: Par. 1.5.2 8,575 SF $ - 1001BG Nonskid coating. Par: 1.5.3 3,000 SF $ - 1001BH Concrete floor layout and painting. Par: 1.5.4 600 LF $ - 1001BJ Work other than normal duty hours multiplier: Par. 1.6 2,010 SF $ - 1001BK Non priced items: Para. 1.7 5,000 SF $ -
WORKLOAD
UNIT OF
MEASURE UNIT PRICE ESTIMATED AMOUNT
2001AA Exterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1 890,500 SF $ - 2001AB Second coat of finish, exterior. Par: 1.2.9.2 890,500 SF $ - 2001AC Contaminant testing and reports. Par: 1.2.9.3 15 EA $ - 2001AD Power wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4 890,500 SF $ -
2001AE Power wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.5 3,600
SF
2001AF Wet scraping. Par: 1.2.9.6 3,500 SF $ - 2001AG Power tooling. Par: 1.2.9.7 5,500 SF $ - 2001AH Exterior bond prep. Par: 1.2.9.8 155,025 SF $ - 2001AJ Rust inhibiting primer. Par: 1.2.9.9 89,000 SF $ - 2001AK Block sealing. Par: 1.2.10 16,000 SF $ - 2001AL Elastomeric coating Par: 1.2.11 11,750 SF $ - 2001AM Coating, Rust Bond FC: 1.2.13.1 52,000 SF $ - 2001AN Coating, Carbomastic 15: 1.2.13.2 52,000 SF $ - 2001AO Coating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.3 52,000 SF $ - 2001AP Abrasive blast cleaning: Par 1.2.14 5,500 SF $ - 2001AQ Stucco repair. Par: 1.2.15 20 EA $ - 2001AR Basewide traffic striping. Par: 1.3.1 130,945 LF $ - 2001AS Parking lot striping. Par: 1.3.2 15,250 LF $ - 2001AT Directional arrows. Par: 1.3.3 30 EA $ - 2001AU Handicapped parking. Par: 1.3.4 25 EA $ - 2001AV Other traffic markings. Par: 1.3.5 7,500 SF $ - 2001AW Striping and marking of airfields & helipads. Par: 1.3.6 12,000 SF $ - 2001AX Interior protective coating, one coat of finish. Par: 1.4.3 78,125 SF $ - 2001AY Hospital interior, one coat of finish. Par: 1.4.4 1,000 SF $ - 2001AZ Bed and tape drywall surfaces. Par: 1.4.5 950 SF $ - 2001BA Apply texture, hand or machine. Par: 1.4.6 2,375 SF $ - 2001BB Prime interior walls. Par: 1.4.7 78,500 SF $ - 2001BC Patch holes in drywall up to one square foot each in size. Par: 1.4.8 30 EA $ - 2001BD Wallpaper removal. Par: 1.4.9 2,500 SF $ - 2001BE Epoxy coating. Par: 1.5.1 8,575 SF $ - 2001BF Urethane coating: Par. 1.5.2 8,575 SF $ - 2001BG Nonskid coating. Par: 1.5.3 3,000 SF $ - 2001BH Concrete floor layout and painting. Par: 1.5.4 600 LF $ - 2001BJ Work other than normal duty hours multiplier: Par. 1.6 2,010 SF $ - 2001BK Non priced items: Para. 1.7 5,000 SF $ -
WORKLOAD
UNIT OF
MEASURE UNIT PRICE ESTIMATED AMOUNT
4001AA Exterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1 890,500 SF $ - 4001AB Second coat of finish, exterior. Par: 1.2.9.2 890,500 SF $ - 4001AC Contaminant testing and reports. Par: 1.2.9.3 15 EA $ - 4001AD Power wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4 890,500 SF $ -
4001AE
Power wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.5 3,600 SF $ -
4001AF Wet scraping. Par: 1.2.9.6 3,500 SF $ - 4001AG Power tooling. Par: 1.2.9.7 5,500 SF $ - 4001AH Exterior bond prep. Par: 1.2.9.8 155,025 SF $ - 4001AJ Rust inhibiting primer. Par: 1.2.9.9 89,000 SF $ - 4001AK Block sealing. Par: 1.2.10 16,000 SF $ - 4001AL Elastomeric coating Par: 1.2.11 11,750 SF $ - 4001AM Coating, Rust Bond FC: 1.2.13.1 52,000 SF $ - 4001AN Coating, Carbomastic 15: 1.2.13.2 52,000 SF $ - 4001AO Coating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.3 52,000 SF $ - 4001AP Abrasive blast cleaning: Par 1.2.14 5,500 SF $ - 4001AQ Stucco repair. Par: 1.2.15 20 EA $ - 4001AR Basewide traffic striping. Par: 1.3.1 130,945 LF $ - 4001AS Parking lot striping. Par: 1.3.2 15,250 LF $ - 4001AT Directional arrows. Par: 1.3.3 30 EA $ - 4001AU Handicapped parking. Par: 1.3.4 25 EA $ - 4001AV Other traffic markings. Par: 1.3.5 7,500 SF $ - 4001AW Striping and marking of airfields & helipads. Par: 1.3.6 12,000 SF $ - 4001AX Interior protective coating, one coat of finish. Par: 1.4.3 78,125 SF $ - 4001AY Hospital interior, one coat of finish. Par: 1.4.4 1,000 SF $ - 4001AZ Bed and tape drywall surfaces. Par: 1.4.5 950 SF $ - 4001BA Apply texture, hand or machine. Par: 1.4.6 2,375 SF $ - 4001BB Prime interior walls. Par: 1.4.7 78,500 SF $ - 4001BC Patch holes in drywall up to one square foot each in size. Par: 1.4.8 30 EA $ - 4001BD Wallpaper removal. Par: 1.4.9 2,500 SF $ - 4001BE Epoxy coating. Par: 1.5.1 8,575 SF $ - 4001BF Urethane coating: Par. 1.5.2 8,575 SF $ - 4001BG Nonskid coating. Par: 1.5.3 3,000 SF $ - 4001BH Concrete floor layout and painting. Par: 1.5.4 600 LF $ - 4001BJ Work other than normal duty hours multiplier: Par. 1.6 2,010 SF $ - 4001BK Non priced items. 1.7 5,000 SF $ -
| Option Yr. 3 |
| Basic Period |
| Option Yr. 1 |
| Option Yr. 2 |
| Option Yr. 4 |