Attch_3_100__Specifications.pdf
PDF 2 MB Posted
- Attached to
- XUMU 09-1120B Fire Suppression System, Building 13675 Federal contract opportunity
- Solicitation number
- FA4610-17-R-0003
About this file
FA4610-17-R-0003 Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4610-17-R-0003-0001.pdf | ||
| FA4610-17-R-0003_Conformed_Through_Amendment_0001.pdf | ||
| Bldg_13675_Structural_Drawings.pdf | ||
| Questions_and_Answers.pdf | ||
| Site_Visit_Attendance.pdf | ||
| FA4610-17-R-0003.pdf | ||
| Attch_4_-_RMDF.pdf | ||
| Attch_2_100__Design_Drawings.pdf | ||
| Attch_1_Statement_of_Work.pdf | ||
| Attch_5_Davis_Bacon_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALLATION OF FIRE SPRINKLER
SYSTEM AT 30 SFS BLDG 13675
AT
VANDENBERG AFB, CA
XUMU 09-1120B
100% SPECIFICATIONS
19 MARCH 2014
TAMPA, FLORIDA
FA4610-17-R-0003
Attachment 3
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 20 ENVIRONMENTAL PROTECTION
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 – EXISTING CONDITIONS
02075 REMOVAL AND DISPOSAL OF ASBESTOS MATERIALS
02081 ASBESTOS ABATEMENT – SMALL SCALE
02082 ASBESTOS ABATEMENT – LARGE SCALE
02084 LEAD BASED PAINT ABATEMENT AND DISPOSAL
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
-- End of Project Table of Contents --
Installation of Fire Sprinkler System 30 SFS Bldg 13675 XUMU 09-1120B
SECTION 01000 Page 1
SECTION 01000
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.01 PROJECT DESCRIPTION
A. The project consists of furnishing all labor, materials, and equipment in connection with the installation of fire sprinkler system at 30 SFS Building 13675 at Vandenberg Air Force Base, California.
B. The work is briefly described as follows, but is not the entire scope of the project:
1. Installation of a new wet-pipe system throughout the building
1.02 OCCUPANCY:
The project site(s) will be occupied by base personnel during construction operations.
1.03 WORK SCHEDULE
Working hours will normally be between the hours of 7:30 a.m. and 4:30 p.m., excluding Saturdays, Sundays, and federal holidays. If the Contractor desires to work during periods other than above, he shall make his request to the Contracting Officer 3 workdays in advance. If Government inspection forces are not required or such forces are reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days; however, if Government inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates will be charged to the Contractor. These adjustments to the Contract price may be made periodically as directed by the Contracting Officer.
1.04 MANDATORY WORK STOPPAGES
A. A mandatory work stoppage occurs whenever the Contractor is restricted from working a full workday and is unable to reallocate work forces to other locations. All costs associated with five mandatory work stoppages must be included in the bid price. No additional compensation or extension to the Contract performance period will be given as a result of five mandatory work stoppages.
B. The Contractor may be required, without advance notice, to move
SECTION 01000 Page 2 work to a different location. The Contractor shall be prepared to increase or decrease his work forces with appropriate trades to perform work in the relocated work areas at no additional cost to the Government.
C. The Contractor shall notify the Contracting Officer when a mandatory work stoppage occurs for recording purposes; otherwise, the work stoppage will not be credited to the Contractor.
1.05 SECURITY
A. The Contractor shall obtain all passes, badges, decals, or other identification media required for security clearance to areas where work is performed. Obtain vehicle and individual identification media at the Pass and Registration Section, 30 SW/SFAM, Building 11777, 6-1853. Identification media shall be surrendered to the Pass and Registration Section upon termination of the Contract, or termination of an individual's employment with the Contractor.
B. The work to be performed is in a military restricted or controlled area. The Contractor must comply with the entry control policies for the area. The Contractor and its employees are required to have at least a National Agency Check. In the event the Contractor cannot comply with the investigative or clearance requirement, it is the responsibility of the Contractor to obtain escort officials who are authorized unescorted entry to the work area. It is also the Contractor's responsibility to coordinate with the appropriate security officials at each construction site at least 5 workdays prior to start of Contract performance. For information on security services, contact Personnel Security Section, 30 SFS/SFAI, 5-0766. The Contractor shall provide enough escort officials for uninterrupted visual surveillance within 50 feet of all individuals not having required security clearance performing work as part of the Contract.
1.06 UTILITIES
A. Utilities directly required to complete the Contract will be provided, if available, to the Contractor without charge. Any temporary connections or lines that are required shall be installed, maintained, and removed by the Contractor at his own expense and in a manner satisfactory to the Contracting Officer.
Before any temporary connections are made, the contractor shall obtain approval from the Utility Shop (30CES/CEOIU, 606-5885) for gas, water and sewer connections and Exterior Electric (30CES/CEOIE, 606-6434) for electrical connections. Contractor shall remove temporary utilities before final acceptance.
B. Schedule all utility outages and secure approval of these outages from the Contracting Officer at least 5 work days in advance of
SECTION 01000 Page 3 the outage.
1.07 SAFETY
A. Contractor shall observe all safety and fire regulations as presently enforced at Vandenberg AFB. The construction shall be in accordance with the US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, and Occupational Safety and Health Act (OSHA) Public Law 91-596. Comply with OSHA and Air Force Occupational Safety and Health (AFOSH) safety standards.
B. All construction sites are subject to fire and safety inspections without notice. Any violation of fire and safety standards may result in a work stoppage at the expense of the Contractor.
C. Contractor shall hold a safety briefing for all subcontractors and craftsmen prior to construction or demolition. This briefing shall be for the specific purpose of making all personnel aware of asbestos and/or lead-based paint issues that may be encountered during demolition and/or renovation even though the project may not seemingly involve disturbance of those substances.
1.08 COORDINATION FOR WORK CLEARANCE REQUEST (AF Form 103)
A. The Contractor shall obtain and process a Form 103, Coordination
For Work Clearance Request, for all work, especially digging operations, involving utilities, communication cables, or environmental sites. The Contractor can obtain a Form 103 from the 30th Civil Engineering Squadron Administration, 30 CES/CECA, Building 11433, (805) 606-8701.
B. Government agencies will annotate on the Form 103, any special instructions and/or compliance requirements prior to start of any work and/or while work is being accomplished. The Contractor shall implement all requirements indicated on the Form 103. The Contractor shall not begin work until the Form 103 is fully approved. The Contractor shall keep the Form 103 on site from the start of work until construction or project completion.
C. The Contractor shall coordinate any work/digging operations in the vicinity of utilities and communication cables with the 30th Civil Engineer Squadron Infrastructure Maintenance Engineering Utility Shop, 30 CES/CEOIU, and the 30th Communications Squadron, 30 CS. No mechanical digging shall be performed within 4 feet of utilities or communication cables until they are physically exposed by hand digging. If a utility or communication cable is damaged, notify the Contracting Officer immediately. A minimum of a 24-hour advance notice for both 30 CES/CEOIU utility monitors, (805) 606-5885, and 30 CS communication monitors, (805) 606-7534, are required. Work shall not begin until the required 30 CES utility or 30 CS communication monitors are present.
SECTION 01000 Page 4
Additionally, during the 48-hour period prior to a launch operation, Contractors shall cease excavation work when they are within 15' of known communication lines as identified on the approved Form 103.
D. The Contractor shall coordinate all work with the 30th Civil
Engineer Squadron's Environmental Management Flight, 30 CES/CEV, Building 7015. The Contractor shall coordinate the Form 103 with the Environmental Management Flight, a minimum of ten (10) workdays prior to any work/digging operations. Environmental monitors may be required from the 30th Civil Engineer Squadron's Environmental Management Flight and a minimum of a 72-hours advance notice for environmental monitors is required. Work shall not begin until all required environmental monitors are present.
1.09 WELDING PERMIT:
Any welding or torching on Vandenberg AFB requires a welding permit.
The Contractor shall obtain a welding permit from the Fire Protection Flight, 30 CES/CEF, Building 10660, 6-5380. A permit will be issued within 2 workdays with instructions for welding fire prevention.
1.10 SUBMITTALS
A. After notification of Contract award and prior to purchasing any materials, submit to the Contracting Officer for approval three copies of all items listed on AF Form 66, Schedule of Material Submittals (see Attachment 1), with one AF Form 3000, Material Approval Submittal, for each submittal. For the purpose of this statement, all entries included on a single AF Form 3000 are considered to be one submittal. Materials, shop drawings, manufacturer’s recommendations, etc., shall not be incorporated into the resultant Contract work until approved by the Contracting Officer or his Authorized Representative.
B. The following definitions set forth the minimum requirements for the type submittal listed on the AF Form 66 (Atch 1) and as further delineated under each section of the specifications:
1. CERTIFICATION OF COMPLIANCE:
a. Manufacturer’s Certification. Submit manufacturer’s certification that products meet or exceed specified requirements.
b. Testing Laboratory Services. Contract with an independent testing laboratory to perform inspections, tests, and other services, in accordance with specified standards. Notify the Contracting Officer 24 hours prior to commencement of testing services.
SECTION 01000 Page 5
c. Letter of Compliance. Submit letter stating that materials meet drawings and specifications. Include applicable referenced standards.
2. SHOP DRAWINGS. Submit opaque reproductions.
3. SAMPLES. Submit one set of the full range of manufacturer’s standard colors, textures, and patterns, unless otherwise indicated. Include the identification of each sample, giving full information. Samples may be retained until the completion of the Contract.
4. COLOR SELECTION. Provide field samples of finishes completed and finished. Acceptable samples in-place may be retained in completed work.
5. MANUFACTURER’S RECOMMENDATIONS. Submit manufacturer’s printed instructions for delivery, storage, assembly, installation, adjusting, and finishing.
6. MANUFACTURER’S WARRANTY. Submit all manufacturer’s warranties given to the Contractor for products used in the Contract.
7. CATALOG DATA. Mark each copy to identify applicable products, models, options, and other data; supplement manufacturer’s standard data to provide information unique to the work.
8. OPERATIONS AND MAINTENANCE MATERIAL REQUIREMENTS:
a. The Contractor shall identify all parts, materials, and consumable items required by the original equipment manufacturer to operate and maintain the system (as indicated in vendor data) in its installed operating environment for a 12-month period. These items shall be identified on a list by true manufacturer's part number, manufacturer's name, nomenclature, and all technical specifications or other identification required by the manufacturer to identify the individual items for reprocurement. Include the name, address, and phone number of authorized suppliers of each item on the list.
b. Contractor shall provide a card, encased in plastic, that lists all routine maintenance requirements that will not violate the manufacturer’s warranty during the above described 12-month period. The card shall also list the Contractor’s name and telephone number, and the Civil Engineering POC for the project. These cards, once prepared, shall be securely tie-wrapped to each new piece of equipment installed as a part of the Contract.
9. SYSTEM OPERATING MANUALS AND EQUIPMENT OPERATING, MAINTENANCE,
SECTION 01000 Page 6
AND REPAIR MANUALS: The Contractor shall provide operating, maintenance, and repair manuals for all systems provided under this Contract as specified below. The preparation of the manuals shall be a continuing process from the Notice to Proceed to construction completion. The Contractor shall meet every 4 weeks throughout the life of the Contract with the Contracting Officer to demonstrate progress update on the preparation of the manuals.
a. The manuals shall be submitted for approval within 90 days after approval of the submittal for the items proposed for procurement unless stated otherwise in the Technical Specifications. Four bound sets of manuals with original factor/vendor data (not reproduced copies of the data) plus six bound sets of manuals with reproduced copies of this data shall be provided. (A draft copy of the manuals shall be made available to the Government at least 30 days prior to approval). Each manual shall include the following:
(1) Hard Cover Binders. The manuals shall be bound in a 3-ring binder with a hard cover. The following identification shall be inscribed on the cover, the words "OPERATING MANUALS AND EQUIPMENT OPERATING, MAINTENANCE, AND REPAIR MANUALS", and the building name and number, location, and indication of utility or system covered. Manuals shall be approximately 8-1/2" x 11", with large sheets folded and capable of being easily pulled out for reference.
(2) Warning Page. A warning page shall be provided to warn of potential dangers (if they exist), such as high voltage, toxic chemicals, flammable liquids, explosive materials, carcinogens, or high pressures. The warning page shall be placed inside the front cover, in front of the title page.
(3) Title Page. The title page shall show the name, address, and phone number of the Contractor, the Contract number, and the date of publication.
(4) Table of Contents. Provide in accordance with standard commercial practice.
b. General. Manuals shall include, in separate sections, the following information for each item of equipment and system:
(1) Performance sheets and graphs showing capacity data, efficiencies, electrical characteristics, pressure drops, and flow rates. Marked-up catalogs or catalog pages do not satisfy this requirement. Performance information shall be presented as concisely as possible
SECTION 01000 Page 7 and contain only data pertaining to equipment actually installed.
(2) Catalog cuts showing application information.
(3) Installation information showing minimum acceptable requirements.
(4) Operation and Maintenance Requirements. Include adequate illustrative material to identify and locate operating controls, indicating devices, and locations of areas or items requiring maintenance.
(a) Describe, in detail, starting and stopping procedures for components, adjustments required obtaining optimum equipment performance, and corrective actions for malfunctions.
(b) Maintenance instructions describing the nature and frequency of routine maintenance and procedures to be followed. Indicate any special tools, materials, and test equipment that may be required.
(5) Repair information including diagrams and schematics, guidance for diagnosing problems, and detailed instructions for making repairs. Provide troubleshooting information that includes a statement of the indication or symptom of trouble and the sequential instructions necessary. Include test hookups to determine the cause, special tools and test equipment, and methods for returning the equipment to operating conditions. Information may be in chart form or in tabular format with appropriate headings.
(6) Parts list and names and addresses of the two closest parts supply agencies.
(7) Names and addresses of the local manufacturer's representatives and the parent company.
(8) A copy of all written materials used in the classroom and field training.
c. Operating and Maintenance (O&M) Equipment Data. Data to be provided for each equipment item: The O&M data to be submitted for each item of equipment shall include, but not be limited to, the items listed below. Separate sets of O&M data will not be required for identical pieces of equipment installed within a single major system.
(1) Equipment Description. Shall include item name, model number, part number, equipment price (FOB mfg.), SECTION 01000 Page 8 electrical and/or mechanical characteristics, manufacturer's name and address, order number, and all other data found on the equipment data/nameplates.
(2) Component and Assemble Drawing/Master Parts List. Shall contain exploded views and/or master parts lists clearly identifying all parts and subassemblies by manufacturer's part number. Master parts lists shall also include price for each part (FOB mfg.).
(3) Control Diagrams and Sequences of Operations. Shall include operating instructions (including normal start up, normal shutdown, and emergency shutdown, as applicable).
(4) Performance Characteristics. Shall include performance curves for full range of operation.
(5) Installation Instructions. Shall include adjustment and alignment procedures, checkout procedures, and test procedures.
(6) Preventive Maintenance Procedures. Shall include inspection, cleaning, adjustment, service, and lubrication instructions. A schedule shall be furnished for each piece of equipment listing manufacturer's recommended maintenance routine of specific tasks to be performed at specific intervals such as daily, weekly, monthly, quarterly, or based on the number of operating hours. Preventive maintenance schedules shall take into account operating conditions at Vandenberg AFB, California.
(7) Corrective Maintenance Procedures. Shall include instructions for troubleshooting, repair, overhaul, and calibration.
(8) Special Items. List of special tools, special test equipment, hazards, and safety precautions shall be provided. Special item lists shall include price for each item (FOB mfg.). Whenever special tools and equipment are required to be provided, by the Technical Provisions or are normally provided by the manufacturer with the equipment, the Contractor shall annotate them on the lists. Items listed shall be turned over to the Contracting Officer.
(9) Recommended Spare Parts List. Shall contain the manufacturer's recommendation for 1-year spare parts stock lever. These are primary spares at the "line replaceable units" level to facilitate minimal system downtime by enabling rapid removal/ replacement of
SECTION 01000 Page 9 failed components. True manufacturer's part number, manufacturer's name, nomenclature, all technical specifications, or other identification required by the manufacturer to uniquely identify an individual part for reprocurement, price, lead time, and shelf time for each individual part shall be furnished.
(10)Manufacturers. Shall include names, addresses, and telephone numbers of all manufacturers whose parts appear on the recommended spare parts list and shall be attached to the recommended spare parts list.
(11) Authorized Parts Suppliers. Shall include names, addresses, telephone and telex numbers of authorized parts suppliers of the equipment.
(12) Extended Warranties. Shall identify the availability and costs of extended warranties.
d. System Operating Manuals. Four bound copies of manuals with original factory/vendor data, plus six bound copies of manuals with reproduced copies of this data shall be provided for each system. Manuals shall be written so that they can be understood by a graduate of both high school and service school with some practical experience. A separate manual shall be provided for each system as defined hereinafter. Generally, all manuals shall include the following information:
(1) A general description of each system to show the type of system installed, its design or specified capacity and performance capabilities, special or unusual features, and relationship to other systems.
(2) A statement of the design intent to include design factors and assumptions.
(3) Operating instructions describing, in detail, system starting and stopping procedures, instrumentation, and adjustments necessary to obtain optimum system performance. The location of test connections and the values expected at these points shall be included, preferably in illustrated form. Data must include a list of the additional equipment required to accomplish the verification such as temperature, vacuum, pressure, hydraulic, or pneumatic gauges; voltmeters; ammeters;
frequency meters; or signal generators. The listing must show methods of use or application, range of scales, and specific minimum tolerances or percentages of accuracy.
(4) Emergency operating instructions to include emergency
SECTION 01000 Page 10 procedures for equipment malfunctions to permit a short period of continued operation or to shut down equipment, if required, to prevent further damage. Included emergency shutdown instructions for fire, explosion, spills, or other contingencies. Provide guidance in emergency operations of systems controlled.
(5) Single-line floor plans, to show location of equipment and configuration of systems. Floor plans shall be accomplished so those structural features are subdued compared to utility features. Floor plans shall be included in the manual, not as a separate package.
e. Separate Equipment Operating, Maintenance, and Repair
Manuals. Shall be provided for each system as defined hereinafter in this and other sections:
f. Provide all information described for the following equipment: control air compressors, control components (sensors, controllers, adapters, and actuators), and water and air flow-measuring equipment.
(1) Exterior Electrical Systems. Information shall be provided on the following equipment: power transformers, relays, reclosers, breakers, regulators, converters, meters, and capacitor bank controls.
(2) Interior Electrical Systems. Information shall be provided on the following equipment: relays, motor control centers, switchgear, solid-state circuit breakers, motor controller, regulators, converters, filters, meters, and EPS lighting systems.
(3) Wiring diagrams and troubleshooting flow chart on control system.
(4) Special grounding systems.
g. Direct Digital Control (DDC) System. The maintenance manual shall include descriptions of maintenance for all equipment including inspection, periodic preventive maintenance, fault diagnosis, and repair or replacement of defective components.
h. Fire Protection Systems. Information shall be provided on the following equipment: alarm valves, manual valves, regulators, foam and gas storage tanks, piping materials, sprinkler heads, nozzles, pumps, and pump drivers.
i. Fire Detection Systems. The maintenance manual shall include description of maintenance for all detectors, control panels, batteries, transmitters, audible and visual
SECTION 01000 Page 11 alarm-signaling devices, and any other auxiliary detection or alarm equipment associated with fire detection and alarm systems. The manual shall include inspection, test, periodic maintenance, fault diagnosis, and repair or replacement of defective components.
j. Payment for the system may be withheld until the operating and maintenance manuals are approved, and training has been successfully accomplished.
10. CONTRACTOR-PROVIDED TRAINING.
a. The Contractor shall be responsible for the instruction and training of operating and maintenance personnel as specified below.
b. The Contractor shall provide competent instructors for training of personnel designated by the Contracting Officer to operate systems and equipment, perform the required preventive maintenance to minimize breakdown and to perform necessary repairs when malfunction or breakdown of equipment occurs. Such training shall consist of on the equipment and/or classroom training for the periods specified, which shall be completed prior to project completion. The instructor(s) shall have no other duties during the period of training. Classroom instruction, where applicable, shall not exceed 50 percent of the total training time, with the balance devoted to on-the-equipment demonstration and familiarization. Emphasis will be given to both electrical and mechanical features, in accordance with approved training plans.
c. The training shall be for not less than the periods of time specified, 5 days per week and 8 hours per day, subject to approval by the Contracting Officer. Each individual training session shall be presented one time only and shall be scheduled in a manner acceptable to the Contracting Officer. The operating and maintenance manual data shall be used as the base material for training. Training shall be limited to normal business hours, Monday through Friday, federal holidays excluded.
d. For each individual training session, the Contractor shall provide to the Contracting Officer no later than 30 days after completion of the training session three reproducible copies of all reference materials/handouts provided by the Contractor to trainees at the training session. These training reference materials/handouts shall be labeled with title, subject(s), and date(s) of the training session(s) at which they were provided to trainees.
1.12 RECORD DRAWINGS
SECTION 01000 Page 12
A. Maintain a clean, undamaged set of Contract drawings and shop drawings. Mark the set to show the actual installation where it varies substantially from the work as originally drawn. Mark whichever drawing is most capable of showing conditions fully and accurately. Where shop drawings are used, record a cross-reference note or number at the corresponding location on the Contract drawings. Give particular attention to concealed elements that would be difficult to measure and record at a later date.
1. Mark record sets with red erasable pencil.
2. Mark new information that is important to the Government, but was not shown on Contract drawings or shop drawings.
B. Submit 7 days prior to final inspection, one set of marked-up
Contract drawings and one set of marked-up shop drawings.
C. Approved redlined drawings will be returned to the Contractor, along with AutoCAD diskette (Release 2000) of the original drawings. All work on the diskette will be accomplished by a Certified Engineering Technician and/or individuals with a minimum of five years drafting experience, at least three of which must be using AutoCAD. The name of these individuals shall be submitted in writing to the Contracting Officer.
Modifications to the diskette shall be accomplished on the appropriate layer showing the work being changed. All revisions shall be done in the same format as the original drawing. On each sheet the words “AS-BUILT” in block letters will be added to the disks. The size of the letters will be at least 3/8 inches high and be placed either above the title block or to the left of the title block. Fill in the revisions block with ‘REVISED AS- BUILT,” date and initials. The submittal shall include the revised AutoCAD diskette, the approved “Red Line” drawings and a full size plot of the drawings from the revised diskette. As-builts will be returned to the Contracting Representative within (2, 3, 4) weeks of receipt of the Master AutoCAD diskette.
1.14 GLOBAL POSITIONING SYSTEM (GPS) REQUIREMENTS
A. Prior to contract completion the Contractor must submit accurate field-verified maps of the utility system being installed or replaced. Once the utility has been installed accurate field-verified locations must be captured. The Contractor is responsible for collecting Global Positioning System coordinates by physically walking the line with a GPS unit.
B. The objective is to obtain exact locations of the installed infrastructure including transformers, manholes, data on the type and size of the utility line, etc. Each turn or bend in the utility line must be captured. If a new building is constructed, SECTION 01000 Page 13 the Contractor is required to provide GPS data on the building footprint and all utilities serving the building that were installed by the Contractor.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION
SECTION 01000 Page 14
This Page Left Intentionally Blank
Installation of Fire Sprinkler System at 13675 XUMU 09-1120B
SECTION 01 33 00
SUBMITTAL PROCEDURES
05/11
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to start of construction (work)
Certificates of insurance
Surety bonds
List of proposed Subcontractors
List of proposed products
Construction progress schedule
Network Analysis Schedule (NAS)
Submittal register
Schedule of prices
Health and safety plan
Work plan
Quality Control(QC) plan
Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, SECTION 01 33 00 Page 1 instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, SECTION 01 33 00 Page 2 maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
Interim "DD Form 1354" with cost breakout for all assets 30 days prior to facility turnover.
1.1.2 Approving Authority
Office or designated person authorized to approve submittal.
1.1.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor QC approval.
Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Submittal Register; G
1.3 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.3.1 Government Approved G
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer. Government approval is required for any deviations from the Solicitation or Accepted Proposal and other items as designated by the Contracting Officer. Within the terms of the Contract Clause entitled, "Specifications and Drawings for Construction," they are considered to be "shop drawings."
1.3.2 Information Only
Submittals not requiring Government approval will be for information only.
They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
SECTION 01 33 00 Page 3
1.4 PREPARATION
1.4.1 Transmittal Form
Transmit each submittal, except sample installations and sample panels to office of approving authority. Transmit submittals with transmittal form prescribed by Contracting Officer and standard for project. On the transmittal form identify Contractor, indicate date of submittal, and include information prescribed by transmittal form and required in paragraph entitled, "Identifying Submittals," of this section. Process transmittal forms to record actions regarding installations.
1.5 VARIATIONS
Variations from contract requirements require both Designer of Record (DOR) and Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.
1.5.1 Considering Variations
Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.5.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.
Clearly mark the proposed variation in all documentation.
1.5.3 Warranting That Variations Are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.5.4 Review Schedule Is Modified
In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.
1.6 SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not
SECTION 01 33 00 Page 4 change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and
(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. The Government will provide the initial submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage.
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.6.1 Use of Submittal Register
Submit submittal register. Submit with QC plan and project schedule.
Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:
Column (a) Activity Number: Activity number from the project schedule.
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.6.2 Contractor Use of Submittal Register
Update the following fields in the Government-furnished submittal register program with each submittal throughout contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
SECTION 01 33 00 Page 5
1.6.3 Approving Authority Use of Submittal Register
Update the following fields in the Government-furnished submittal register program.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.6.4 Copies Delivered to the Government
Deliver one copy of submittal register updated by Contractor to Government with each invoice request.
1.7 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.8 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in
SECTION 01 33 00 Page 6 paragraph entitled, "Review Notations," of this section and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. Four copies of the approved submittal will be retained by the Contracting Officer and two copies of the submittal will be returned to the Contractor.
1.9 DISAPPROVED OR REJECTED SUBMITTALS
Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes," is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work.
Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.10 APPROVED/ACCEPTED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.11 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of
SECTION 01 33 00 Page 7 the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. Contractor to replace such materials or equipment to meet contract requirements.
Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.
1.12 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.13 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:
SECTION 01 33 00 Page 8
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 33 00 Page 9
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
08/10
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.
AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
901 Canterbury, Suite A Westlake, OH 44145 Ph: 440-835-3040 Fax: 440-835-3488 E-mail: info@asse-plumbing.org Internet: http://www.asse-plumbing.org
AMERICAN WATER WORKS ASSOCIATION (AWWA)
6666 West Quincy Avenue Denver, CO 80235 Ph: 800-926-7337 Fax: 303-347-0804 E-mail: smorrison@awwa.org Internet: http://www.awwa.org
ASME INTERNATIONAL (ASME)
Three Park Avenue, M/S 10E New York, NY 10016-5990 Ph: 800-854-7179 or 800-843-2763 Fax: 212-591-7674 E-mail: infocentral@asme.org Internet: http://www.asme.org
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 610-832-9585 Fax: 610-832-9555
SECTION 01 42 00 Page 1
E-mail: service@astm.org Internet: http://www.astm.org
FM GLOBAL (FM)
270 Central Avenue P.O. Box 7500 Johnston, RI 02919 Ph: 401-275-3000 ext. 1945 Fax: 401-275-3029 E-mail: servicedesk.myrisk@fmglobal.com Internet: http://www.fmglobal.com
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
127 Park Street, NE Vienna, VA 22180 Ph: 703-281-6613 Fax: 703-281-6671 E-mail: info@mss-hq.com Internet: http://www.mss-hq.com
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
1 Batterymarch Park Quincy, MA 02169-7471 Ph: 617-770-3000 or 800-344-3555 Fax: 617-770-0700 E-mail: webmaster@nfpa.org Internet: http://www.nfpa.org
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
1420 King Street Alexandria, VA 22314-2794 Ph: 888-476-4238 (1-888 IS-NICET) E-mail: tech@nicet.org Internet: http://www.nicet.org
UNDERWRITERS LABORATORIES (UL)
2600 N.W. Lake Road Camas, WA 98607-8542 Ph: 877-854-3577 Fax: 360-817-6278 E-mail: CEC.us@us.ul.com Internet: http://www.ul.com/ UL Directories available through IHS at http://www.ihs.com
U.S. DEPARTMENT OF DEFENSE (DOD)
Order DOD Documents from:
Room 3A750-The Pentagon 1400 Defense Pentagon Washington, DC 20301-1400 Ph: 703-571-3343
FAX: 215-697-1462
E-mail: pia@hq.afis.asd.mil Internet: http://www.dod.gov Obtain Military Specifications, Standards and Related Publications from:
Acquisition Streamlining and Standardization Information System
(ASSIST)
SECTION 01 42 00 Page 2
Department of Defense Single Stock Point (DODSSP) Document Automation and Production Service (DAPS) Building 4/D 700 Robbins Avenue Philadelphia, PA 19111-5094 Ph: 215-697-6396 - for account/password issues Internet: http://assist.daps.dla.mil/online/start/ ; account registration required Obtain Unified Facilities Criteria (UFC) from:
Whole Building Design Guide (WBDG) National Institute of Building Sciences (NIBS) 1090 Vermont Avenue NW, Suite 700 Washington, CD 20005 Ph: 202-289-7800 Fax: 202-289-1092 Internet: http://www.wbdg.org/references/docs_refs.php
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
Ariel Rios Building 1200 Pennsylvania Avenue, N.W.
Washington, DC 20004 Ph: 202-272-0167 for Fax and E-mail see below Internet: http://www.epa.gov --- Some EPA documents are available only from:
National Technical Information Service (NTIS) 5301 Shawnee Road Alexandria, VA 22312 Ph: 703-605-6050 or 1-688-584-8332 Fax: 703-605-6900 E-mail: info@ntis.gov Internet: http://www.ntis.gov
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
8601 Adelphi Road College Park, MD 20740-6001 Ph: 866-272-6272 Fax: 301-837-0483 E-mail: contactcenter@gpo.gov Internet: http://www.archives.gov Order documents from:
Superintendent of Documents U.S.Government Printing Office (GPO) 732 North Capitol Street, NW Washington, DC 20401 Ph: 202-512-1800 Fax: 202-512-2104 E-mail: contactcenter@gpo.gov Internet: http://www.gpoaccess.gov
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
Not used
-- End of Section --