SOW_Optics_Trailer_Requirement.pdf

PDF 91 KB Posted

Attached to
Nano Optical Tracking Mount Trailer Assembly Federal contract opportunity
Solicitation number
FA4610-16-T-0013
Issued by
Department of the Air Force Space Command

About this file

Statement of Work includes the salient characteristics for the customized trailer.

View the file

Other files for this federal contract opportunity

Other files attached to Nano Optical Tracking Mount Trailer Assembly, newest first.
File Type Posted
Combined_Synopsis_--_Optics_Trailer.pdf PDF
RFQ_Template_--_Optics_Trailer.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

STATEMENT OF WORK

For

30SCS Optical Instrumentation Section

1. Scope of Work: Purchase of three transportation trailers for the Portable Advance Nano Digital

Acquisition system (PANDA)

2. Description of Services: To supply three transportation trailers for the PANDA System. Using a modified Photo-Sonics NANO system Trailer.

3. Description of Items: The contractor shall provide the following items:

3.1. (3) Transportation Trailers configured to accept the Photo-Sonics NANO Tracking head and balancing plate and shall meet the following requirements.

• The trailer shall meet or exceed Department of Transportation road worthiness standards and must be licensable within the state of California.

• Trailer hitch shall be a standard 2” ball configuration.

• The trailer must be capable of safely transporting 2500 lbs. payload.

• Trailer tongue weight not to exceed 500lbs when full load is attached.

• The trailer shall be configured to accept the Photo-Sonics NANO Tracking Head and balancing plate assembly.

• Trailer shall have provision to mount and secure 3 PANDA equipment portable rack cases and evenly distributed to safely transport to field locations.

• Trailer shall have stabilizer jacks to support and balance the basic trailer when parked during operations.

• Trailer shall have deck leveling bubbles on the 4 corners of the trailer deck.

• Trailer shall have a utility box to contain any additional equipment needed to balance, park or operate the trailer.

• Trailer shall have a soft water proof cover (range white) that covers the trailer and equipment when configured with full payload. It must also be capable of withstanding road speed of 55mph or better.

4. Warranty. Contractor shall provide one-year warranty on all furnishings and miscellaneous items included in this order against defects in materials and manufacture.

5. Recycled Content. N/A

6. Manufacturer/Installer Qualifications. Manufacture must be familiar with the Photo-Sonics NANO tracking system.

7. Period of Performance. 180 Days ARO

8. Place of performance. Manufacturer Location

9. Delivery. Destination

10. Base Passes and Controlled Area Badges. Base passes will be arranged though the 30 SCS/SCXPO

Technical Services office as needed.

STATEMENT OF WORK

File details come from the government source that posted it. Updated .