Attachment 6 - Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Paint Museum Static Aircraft, newest first.
File Type Posted
Attachment_6_Revision__1.pdf PDF
Amendment_2_released.pdf PDF
amendment__1.pdf PDF
Attendance.pdf PDF
Attachment_4_Special_Contract_Requirements.pdf PDF
Solicitation.pdf PDF
Attachment_1_-_Environmental_Req'ts_(Jun_16).pdf PDF
Attachment_5_WDL.pdf PDF
Attachment_2_-_AF66.pdf PDF
Attachment_3_Insurance_Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4608-17-R-0008

Attachment 6

STATEMENT OF WORK

FOR

AT-11 PAINT RESTORATION

1. Background for Requirement

The AT-11 aircraft on static display in the museum airpark is in need of new paint in order to mitigate water intrusion and resultant corrosion, and must be repainted in order to provide a quality display appearance. Period of performance for this work is 30 calendar days.

2. Scope of Work

The contractor shall provide all management, tools, supplies, equipment, parts, and labor necessary to accomplish the painting of the static display aircraft. The contractor will also be responsible for ensuring environmental regulation compliance.

3. Service Delivery Summary

The objective of service is to properly prep, sand, prime, and paint the Barksdale Global Power

Museum AT-11 static display aircraft. The aircraft tires and landing gear struts will be covered in order to prevent overspray onto these areas. Surface contamination will be removed through use of environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to remove peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Primer (LICP 200 Industrial primer or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better. You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Cleascoat HS or better will be applied to give a high gloss and long lasting

UV protection. The windows will also be prepped and sprayed black and have the same polyurethane clear coat as the rest of the aircraft. The aircraft is to be painted in its current paint scheme with its all current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and location as they are currently. Unpainted surfaces (landing, taxi lights, navigation and position lights, etc) will be masked off and protected from paint overrun. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact.

4. Services Provided by Museum Staff Personnel

Museum staff personnel will furnish contractor with paint color specifications.

B-29 PAINT RESTORATION

The B-29 aircraft on static display in the museum airpark is in need of new paint in order to mitigate water intrusion and resultant corrosion, and must be repainted in order to provide a quality display appearance. Period of performance for this work is 45 calendar days.

necessary to accomplish the painting of the static display aircraft. The contractor will also be responsible

Museum B-29 static display aircraft. The aircraft tires and landing gear struts will be covered in order to prevent overspray onto these areas. Surface contamination will be removed through use of environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to remove peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Primer (LICP 200 Industrial primer or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better. You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Cleascoat HS or better will be applied to give a high gloss and long lasting

UV protection. The windows will also be prepped and sprayed black and have the same polyurethane clear coat as the rest of the aircraft. The aircraft is to be painted in its current paint scheme with its all current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and location as they are currently. Unpainted surfaces (landing, taxi lights, navigation and position lights, etc) will be masked off and protected from paint overrun. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact.

B-52G PAINT RESTORATION

The B-52G aircraft on static display in the museum airpark is in need of new paint in order to mitigate water intrusion and resultant corrosion, and must be repainted in order to provide a quality display appearance. Period of performance for this work is 45 calendar days.

necessary to accomplish the painting of the static display aircraft. The contractor will also be responsible

Museum B-52G static display aircraft. The aircraft tires and landing gear struts will be covered in order to prevent overspray onto these areas. Surface contamination will be removed through use of environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to remove peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Primer (LICP 200 Industrial primer or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better. You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Cleascoat HS or better will be applied to give a high gloss and long lasting

UV protection. The windows will also be prepped and sprayed black and have the same polyurethane clear coat as the rest of the aircraft. The aircraft is to be painted in its current paint scheme with its all current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and location as they are currently. Unpainted surfaces (landing, taxi lights, navigation and position lights, etc) will be masked off and protected from paint overrun. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact.

C-45 PAINT RESTORATION

The C-45 aircraft on static display in the museum airpark is in need of new paint in order to mitigate water intrusion and resultant corrosion, and must be repainted in order to provide a quality display necessary to accomplish the painting of the static display aircraft. The contractor will also be responsible

Museum C-45 static display aircraft. The aircraft tires and landing gear struts will be covered in order to prevent overspray onto these areas. Surface contamination will be removed through use of environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to remove peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Primer (LICP 200 Industrial primer or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better. You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Cleascoat HS or better will be applied to give a high gloss and long lasting

UV protection. The windows will also be prepped and sprayed black and have the same polyurethane clear coat as the rest of the aircraft. The aircraft is to be painted in its current paint scheme with its all current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and location as they are currently. Unpainted surfaces (landing, taxi lights, navigation and position lights, etc) will be masked off and protected from paint overrun. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact.

C-47 PAINT RESTORATION

The C-47 aircraft on static display in the museum airpark is in need of new paint in order to mitigate water intrusion and resultant corrosion, and must be repainted in order to provide a quality display necessary to accomplish the painting of the static display aircraft. The contractor will also be responsible

Museum C-47 static display aircraft. The aircraft tires and landing gear struts will be covered in order to prevent overspray onto these areas. Surface contamination will be removed through use of environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to remove peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Primer (LICP 200 Industrial primer or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better. You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Cleascoat HS or better will be applied to give a high gloss and long lasting

UV protection. The windows will also be prepped and sprayed black and have the same polyurethane clear coat as the rest of the aircraft. The aircraft is to be painted in its current paint scheme with its all current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and location as they are currently. Unpainted surfaces (landing, taxi lights, navigation and position lights, etc) will be masked off and protected from paint overrun. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact.

Lay-down Area Temporary Fencing

1. The Contractor shall furnish all labor, materials, and equipment necessary to provide secure and visually aesthetic temporary fencing for surrounding project equipment and material in lay-down areas.

Work shall include:

a. Clearing area of all encumbrances to safe erection of fencing.

b. Provide fence that is: metal tube frame; metal woven wire mesh (minimum 11 gauge);

minimum 6 feet in height.

c. Provide integral to fence visual blocking material, either slat weave or sheet goods.

d. Erecting fence in such manner as to prevent loss of fencing or blocking due to inclement weather.

e. At no time shall fence interfere with fire egress paths or fire equipment ingress, to include periods when gates are in operation.

Contractor shall submit cut sheets on all items for installation, prior to procurement, for approval by the

C.E. Architect. Complete the design as indicated on drawings in accordance with UFC 1-200-01 General

Building Requirements which includes the latest editions of the International Building Code and NFPA

Life Safety Code, and Americans with Disabilities Act. All required work shall be accomplished in accordance with the Barksdale AFB Design Compatibility Guidelines (DCG). All colors and materials shall be selected by the Civil Engineer Architect in accordance with the DCG. Construction shall be conducted in a quality workmanlike manner. Contractor shall take any steps necessary to protect government and occupant property from damage caused by weather or other occurrence while work is in progress.

2. Upon notification of completion by the contractor a determination will be made as to the satisfactory completion and acceptance of the contract specification(s). Any segment of the operation that is not acceptable because of an unsightly or unprofessional appearance will be justification for rejection of the treatment. The contractor will incur all costs, both labor and materials, for reaccomplishment of any unacceptable work identified.

3. The contractor will be responsible for and incur any and all labor and material costs required to repair any damages to government facilities that occurred during and as result of repair work, replacement operations, or new work, under this contract. This damage will be identified as separate from the condition of the facilities as identified during the initial inspection. The damage will be identified, but not limited, to the following items.

a. Government gas, water and electric transmission and distribution systems

b. Occupant personal property

Additional Information.

a. The contractor will begin work not earlier than 7:30 am each workday. Work will not be performed later than 6:00 pm.

b. Inspections will be conducted by the Contracting Officer and /or Contracting Officer’s

Representative and the Contractor’s Manager.

c. Any discrepancies should be noted and forwarded to the Architect.

Background Checks for Contractor Personnel Requiring Entry/Access to Barksdale AFB (Jan 2005)

Security Forces will conduct a National Crime and Information Center (NCIC) background check on all contractor or subcontractor personnel prior to granting access to the installation.

CONSTRUCTION AND DEMOLITION DEBRIS REPORTS

The following requirement is listed in Attachment 1, Environmental Requirements for Contractors

Working on Barksdale Air Force Base. These reports are required to be submitted on an AF 3000 Material

Submittal and should be incorporated into the AF66 Material Submittal Schedule at time of contract award.

Final payment will not be released until C&D reports have been submitted and accepted by the

Government.

“Construction and Demolition (C&D) debris is generated as a result of construction, renovation, or demolition activities. Although C&D debris is usually considered a single waste stream, the composition actually varies with each activity and the type, size, and location of the structures involved. Disposing of

C&D debris in landfills consumes enormous amounts of space and is both economically and environmentally costly. In accordance with AFI 32-7042 and BAFB’s Integrated Solid Waste Management

Plan (ISWMP), ALL WEIGHTS OF C&D MATERIALS RECYCLED AND DISPOSED MUST BE

REPORTED TO THE RECYCLE PROGRAM MANAGER.”

CONTRACT COMPLETION INSPECTIONS

The contractor will schedule (preferably with 3 working days notice) a pre-completion inspection to be held approximately 10 calendar days prior to the expiration of the contract. This inspection may result in a

"punch list" indicating items to be furnished or work to be completed by the contractor or subcontractors in order to complete the work specified in the contract documents. This list may not be construed to be all inclusive. A copy of the list will be furnished to the contractor within 2 workdays for his use in completing the contractual work. If the pre-completion inspection results in no "punch list" and the work is complete, this inspection may be considered the "final" inspection as determined by the Contracting Officer. If required, the contractor will be responsible for scheduling the contract completion inspection (preferably with 3 working days notice) to be held no later than the final day of contract performance. Should this inspection result in a "punchlist", the contractor will have 10 calendar days (after receipt of punchlist) to complete all punchlist items and notify the Contracting Officer of this. NO FINAL INVOICE SHALL BE

PAID UNTIL ALL PUNCHLIST ITEMS ARE COMPLETED TO THE SATISFACTION OF THE

CONTRACTING OFFICER. Should a contractor exceed the time allowed for these corrections, it may result in negative past performance which could affect future contract awards.

PERFORMANCE INFORMATION

NOTICE TO PROCEED will be issued within 30 calendar days after award of contract. Award date shall be established as the date of mailing or otherwise furnishing a properly executed award document to the successful offeror.

WORK SCHEDULE:

Working hours for the contractor will normally be between the hours of 7:30 a.m. and 6 p.m. excluding

Saturdays, Sundays and Federal Holidays (New Year’s Day, Birthday of Martin Luther King, Jr., Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day and Christmas Day). If the contractor desires to work during periods other than above, additional government inspection forces may be required. The contractor must notify the contracting officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces when the contracting officer determines they are reasonably available. If such force is reasonably available, the contracting officer may authorize the contractor to perform work during periods other than normal duty hours/days, however, if inspections are required to perform in excess of their normal duty hours/days solely for the benefit of the contractor, the actual cost of inspection at overtime rates will be charged to the contractor. These adjustments to the contract price may be made periodically as directed by the contracting officer.

DELIVERY TIME:

The period of performance on this project will be 180 total calendar days from the Notice to Proceed (NTP) date IF all CLINS are awarded. However, award of the option CLINS are based on availability of funding.

Therefore, each CLIN (plane) has an associated period of performance. For example, if award consists of only CLIN 0001 (B-52G) and CLIN 0003 (C-47), contractor will be allowed 70 calendar days to complete both planes (45 days for B-52G and 30 days for C-47).