Attachment_6_Revision__1.pdf

PDF 591 KB Posted

Attached to
Paint Museum Static Aircraft Federal contract opportunity
Solicitation number
FA460817R0008
Issued by
Department of the Air Force Global Strike Command

About this file

Revised Statement of Work dated June 15, 2017

View the file

Other files for this federal contract opportunity

Other files attached to Paint Museum Static Aircraft, newest first.
File Type Posted
Amendment_2_released.pdf PDF
amendment__1.pdf PDF
Attendance.pdf PDF
Attachment_4_Special_Contract_Requirements.pdf PDF
Attachment_1_-_Environmental_Req'ts_(Jun_16).pdf PDF
Attachment_5_WDL.pdf PDF
Attachment_2_-_AF66.pdf PDF
Atttachment_6_Statement_of_Work.pdf PDF
Attachment_3_Insurance_Form.pdf PDF
Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

AT-11 PAINT RESTORATION

Revised 15 June 2017

1. Background for Requirement

The AT-11 aircraft on static display in the museum airpark is in need of new paint in order to mitigate water intrusion and resultant corrosion, and must be repainted in order to provide a quality display appearance.

2. Scope of Work

The contractor shall provide all management, tools, supplies, equipment, parts, and labor necessary to accomplish the painting of the static display aircraft. The contractor will also be responsible for ensuring environmental regulation compliance.

3. Service Delivery Summary

The objective of service is to properly prep, sand, prime, and paint the Barksdale Global Power Museum AT-11 static display aircraft. The aircraft tires and landing gear will be repainted as well. Surface contamination will be removed through use of environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to feather edge, peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Primer (LICP 200 Industrial primer or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better (subjective to approval by curator).

You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Clear coat HS or better will be applied to give a high gloss and long lasting UV protection. The windows will also be prepped and sprayed and have the same polyurethane clear coat as the rest of the aircraft.

The aircraft is to be painted in its current paint scheme with its all current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and location as they are currently. Stenciling will be reapplied in the proper location and size and painted on. Vinyl stickers will not be used unless approved by curator. Unpainted surfaces (landing, taxi lights, navigation and position lights, etc) will be masked off and protected from paint overrun. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Aircraft will be sprayed using HVLP equipment. Rolling, brushing or airless spraying will not be accepted. All stenciling will be reapplied using proper paint in the location and size as well.

4. Services Provided by Museum Staff Personnel

Museum staff personnel will furnish contractor with paint color specifications.

FA4608-17-R-0008

Attachment 6

B-29 PAINT RESTORATION

1. Background for Requirement

The B-29 aircraft on static display in the museum airpark is in need of new paint in order to mitigate water intrusion and resultant corrosion, and must be repainted in order to provide a quality display appearance.

2. Scope of Work

The contractor shall provide all management, tools, supplies, equipment, parts, and labor necessary to accomplish the painting of the static display aircraft. The contractor will also be responsible for ensuring environmental regulation compliance.

3. Service Delivery Summary

The objective of service is to properly prep, sand, prime, and paint the Barksdale Global Power Museum B-29 static display aircraft. The aircraft tires and landing gear will be repainted as well. Surface contamination will be removed through use of environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to feather edge, peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Primer (LICP 200 Industrial primer or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better (subjective to approval by curator).

You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Clear coat HS or better will be applied to give a high gloss and long lasting UV protection. The windows will also be prepped and sprayed and have the same polyurethane clear coat as the rest of the aircraft.

The aircraft is to be painted in its current paint scheme with its all current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and location as they are currently. Stenciling will be reapplied in the proper location and size and painted on. Vinyl stickers will not be used unless approved by curator. Unpainted surfaces (landing, taxi lights, navigation and position lights, etc) will be masked off and protected from paint overrun. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Aircraft will be sprayed using HVLP equipment. Rolling, brushing or airless spraying will not be accepted. All stenciling will be reapplied using proper paint in the location and size as well.

4. Services Provided by Museum Staff Personnel

Museum staff personnel will furnish contractor with paint color specifications.

FA4608-17-R-0008

B-52G PAINT RESTORATION

The B-52G aircraft on static display in the museum airpark is in need of new paint in order to mitigate water intrusion and resultant corrosion, and must be repainted in contractor will also be responsible for ensuring environmental regulation compliance.

3. Service Delivery Summary

The objective of service is to properly prep, sand, prime, and paint the Barksdale Global Power Museum B-52G static display aircraft. The aircraft tires and landing gear will be repainted as well. Surface contamination will be removed through use of environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to feather edge, peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Primer (LICP 200 Industrial primer or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better (subjective to approval by curator).

You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Clear coat HS or better will be applied to give a high gloss and long lasting UV protection. The windows will also be prepped and sprayed and have the same polyurethane clear coat as the rest of the aircraft.

The aircraft is to be painted in its current paint scheme with its all current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and location as they are currently. Stenciling will be reapplied in the proper location and size and painted on. Vinyl stickers will not be used unless approved by curator. Unpainted surfaces (landing, taxi lights, navigation and position lights, etc) will be masked off and protected from paint overrun. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Aircraft will be sprayed using HVLP equipment. Rolling, brushing or airless spraying will not be accepted. All stenciling will be reapplied using proper paint in the location and size as well.

4. Services Provided by Museum Staff Personnel

Museum staff personnel will furnish contractor with paint color specifications.

FA4608-17-R-0008

C-45 PAINT RESTORATION

The C-45 aircraft on static display in the museum airpark is in need of new paint in order to mitigate water intrusion and resultant corrosion, and must be repainted in contractor will also be responsible for ensuring environmental regulation compliance.

3. Service Delivery Summary

The objective of service is to properly prep, sand, prime, and paint the Barksdale Global Power Museum C-45 static display aircraft. The aircraft tires and landing gear will be repainted as well. Surface contamination will be removed through use of environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to feather edge, peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Primer (LICP 200 Industrial primer or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better (subjective to approval by curator).

You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Clear coat HS or better will be applied to give a high gloss and long lasting UV protection. The windows will also be prepped and sprayed and have the same polyurethane clear coat as the rest of the aircraft.

The aircraft is to be painted in its current paint scheme with its all current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and location as they are currently. Stenciling will be reapplied in the proper location and size and painted on. Vinyl stickers will not be used unless approved by curator. Unpainted surfaces (landing, taxi lights, navigation and position lights, etc) will be masked off and protected from paint overrun. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Aircraft will be sprayed using HVLP equipment. Rolling, brushing or airless spraying will not be accepted. All stenciling will be reapplied using proper paint in the location and size as well.

4. Services Provided by Museum Staff Personnel

Museum staff personnel will furnish contractor with paint color specifications.

FA4608-17-R-0008

C-47 PAINT RESTORATION

The C-47 aircraft on static display in the museum airpark is in need of new paint in order to mitigate water intrusion and resultant corrosion, and must be repainted in contractor will also be responsible for ensuring environmental regulation compliance.

3. Service Delivery Summary

The objective of service is to properly prep, sand, prime, and paint the Barksdale Global Power Museum C-47 static display aircraft. The aircraft tires and landing gear will be repainted as well. Surface contamination will be removed through use of environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to feather edge, peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Primer (LICP 200 Industrial primer or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better (subjective to approval by curator).

You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Clear coat HS or better will be applied to give a high gloss and long lasting UV protection. The windows will also be prepped and sprayed and have the same polyurethane clear coat as the rest of the aircraft.

The aircraft is to be painted in its current paint scheme with its all current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and location as they are currently. Stenciling will be reapplied in the proper location and size and painted on. Vinyl stickers will not be used unless approved by curator. Unpainted surfaces (landing, taxi lights, navigation and position lights, etc) will be masked off and protected from paint overrun. Care will be taken by contractor during task in order to protect ground underneath and around aircraft from negative environmental impact. Aircraft will be sprayed using HVLP equipment. Rolling, brushing or airless spraying will not be accepted. All stenciling will be reapplied using proper paint in the location and size as well.

4. Services Provided by Museum Staff Personnel

Museum staff personnel will furnish contractor with paint color specifications.