Attachment_6_-_Questions_and_Answers.docx

DOCX document 19 KB Posted

Attached to
Renovate MRC Office Space - Building 546 Federal contract opportunity
Solicitation number
FA4528-R-17-0019
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 6 Questions and Answer for MRC Office Space Renovation

View the file

Other files for this federal contract opportunity

Other files attached to Renovate MRC Office Space - Building 546, newest first.
File Type Posted
FA4528-17-R-0019_Amendment_0001.pdf PDF
Attachment_4_-_Past_Performance_Information_Form.docx DOCX document
Attachment_1-_Specifications.pdf PDF
Attachment_2_-_Drawings.pdf PDF
FA4528-17-R-0019_MRC_Office_Space.pdf PDF
Attachment_5_-_Financial_Responsibility.docx DOCX document
Attachment_3_-_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6 Pre-Proposal Offeror Questions and Government Responses MRC Office Space

FA4528-17-R-0029

25 Aug 17

1. Q. Are there electrical lines running under the carpet in the main room? If so can you provide a map detailing where they run?

A. Reference Sheet ED101. Add Electrical Keynote 2 as follows, pointing to the V-shaped table in the existing MRC: "Remove power, data, and AV systems from the existing V-shaped table back to the sources. These services appear to run under the floor in existing floor trench, in conduit, or in wire mold under the carpet. All demolition work shall be performed in conformance with the General Electrical Demolition Notes on Sheet EG101. Infill any existing floor trenches with concrete to match adjacent floor slab."

2. Q. What does VESDA on sheet E – 501 Detail 1?

A. VESDA stands for Very Early Smoke Detection Apparatus, and is a smoke detection system for electronics. The system is shown on Sheet FA101 and spec'd in Section 28 31 76.

3. Q. Can you depict hauling routes for debris on one of the maps?

A. Contractor access to and haul route from the building is shown on Sheet G-004. Contractor haul route through the Base is shown on the Location Plan on Sheet G-001. Contractor can request an alternate haul route after the contract is awarded.

**Note – This attachment does not become part of the resultant contract**

File details come from the government source that posted it. Updated .