Attachment_6_-_Questions_and_Answers.docx
DOCX document 19 KB Posted
- Attached to
- Renovate MRC Office Space - Building 546 Federal contract opportunity
- Solicitation number
- FA4528-R-17-0019
About this file
Attachment 6 Questions and Answer for MRC Office Space Renovation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4528-17-R-0019_Amendment_0001.pdf | ||
| Attachment_4_-_Past_Performance_Information_Form.docx | DOCX document | |
| Attachment_1-_Specifications.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| FA4528-17-R-0019_MRC_Office_Space.pdf | ||
| Attachment_5_-_Financial_Responsibility.docx | DOCX document | |
| Attachment_3_-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6 Pre-Proposal Offeror Questions and Government Responses MRC Office Space
FA4528-17-R-0029
25 Aug 17
1. Q. Are there electrical lines running under the carpet in the main room? If so can you provide a map detailing where they run?
A. Reference Sheet ED101. Add Electrical Keynote 2 as follows, pointing to the V-shaped table in the existing MRC: "Remove power, data, and AV systems from the existing V-shaped table back to the sources. These services appear to run under the floor in existing floor trench, in conduit, or in wire mold under the carpet. All demolition work shall be performed in conformance with the General Electrical Demolition Notes on Sheet EG101. Infill any existing floor trenches with concrete to match adjacent floor slab."
2. Q. What does VESDA on sheet E – 501 Detail 1?
A. VESDA stands for Very Early Smoke Detection Apparatus, and is a smoke detection system for electronics. The system is shown on Sheet FA101 and spec'd in Section 28 31 76.
3. Q. Can you depict hauling routes for debris on one of the maps?
A. Contractor access to and haul route from the building is shown on Sheet G-004. Contractor haul route through the Base is shown on the Location Plan on Sheet G-001. Contractor can request an alternate haul route after the contract is awarded.
**Note – This attachment does not become part of the resultant contract**