Attachment 3 - Questions and Answers.pdf
PDF 221 KB Posted
- Attached to
- Repair Airfield Lighting Federal contract opportunity
- Solicitation number
- FA452820R0024
About this file
This document contains pre-proposal questions and answers related to solicitation number FA452820R0024 for repair of airfield lighting. The scope of work involves removing rising concrete pillars underneath taxiway lights, backfilling with well-draining material, installing new lighting cans, replacing concrete-encased conduit where needed, and repaving excavated areas. The magnitude of work is estimated between $100,000 and $250,000, with approximately 50 feet between each light requiring replacement of conduit. Four-inch asphalt concrete or 16-inch concrete pavement will be reinstalled, with pinning required in two traffic areas. No bid bond is necessary and electronic submissions are permitted. The soliciting agency is the Department of the Air Force Global Strike Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - DBA WD.pdf | ||
| Attachment 1 - SOW Taxiway Lighting.pdf | ||
| Solicitation - FA452820R0024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3 Pre-Proposal Offeror Questions and Government Responses
Repair Airfield Lights
FA452820R0024
7 July 2020
1. Are Electronic bid submissions permissible?
a. Yes
2. Is a Bid Bond Required?
a. No
3. Can the government provide a point estimate?
a. The magnitude is between $100,000.00 and $250,000.00.
4. Is there an estimate related to the quantity and type of paving to be replaced where the conduit is lifting?
a. Pavements being replaced are mixed, but the government is expecting 4” ACC is being reinstalled in all but a couple locations. Two locations are in traffic areas and will require appropriate thickness PCC, approximately 16” to replace what’s being removed. Pinning into the associated in those two locations is also expected.
5. Is there an estimate for the amount of conduit that is anticipated to be replaced?
a. For areas that have rising conduit, the distance between lights does not exceed 50 feet.
6. Can you provide the linear footage of concrete encased conduit that will need to be replaced or the distance between lights for bidding proposes?
a. 50 feet between each light