Attachment__8_-_Revised_Seed_Drawings_Bldg_260_Paving_Project.pdf
PDF 2 MB Posted
- Attached to
- Paving IDIQ Federal contract opportunity
- Solicitation number
- FA4528-19-R-A005
About this file
Attachment 8 - Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_7_-_Revised_Seed_SOW_Bldg_260_Paving_Project.docx | DOCX document | |
| SF_30.pdf | ||
| Attachment_13_-_Questions_and_Answers.docx | DOCX document | |
| Attachment_12_-_Section_M.docx | DOCX document | |
| Attachment_3_-_Past_Performance_Questionnaire_(PPQ).docx | DOCX document | |
| Attachment_6_-_Client_Authorization_Letter.docx | DOCX document | |
| Attachment_11_-_Section_L.docx | DOCX document | |
| Attachment_8_-_Seed_Drawings_Bldg_260_Paving_Project.pdf | ||
| Attachment_10_-_Financial_Responsibility.docx | DOCX document | |
| Solicitation_-_FA452819RA005.pdf | ||
| Attachment_2_-_DBA_Wage_Determination_4_Jan_19.pdf | ||
| Attachment_9_-_FOPR_for_Seed_Project.docx.pdf | ||
| Attachment_4_-_Subcontractor_Consent_Letter_ex.pdf | ||
| Attachment_7_-_Seed_SOW_Bldg_260_Paving_Project.docx | DOCX document | |
| Attachment_1_-_Paving_IDIQ_Specifications.pdf | ||
| Attachment_5_-_MACC_Provisions.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
³ 1 inch = 2,500 feet 1 inch = 762 meters
1:30000
Docum ent Pa th: Y:\10. CEO-Operations\7. CEOE - Ops Engine ering\ 5. CEOER - Re quirem ents & Op tim iza tio n\1. FCAT-Build er 2015 \3. E.A.-\Kawago ye \Paveme nt Plann in g\260 \260 Site Upd ate.m xd
Revision By Date Created 14Feb2019AOK Ke y to Fe a tu re s
Th is m a te ria l is For O fficia l Use O nly.
Th is m a p is for re fe re nce a nd pla nning pu rpose s only. Do not u se f or e ng ine e ring , navig a tion, ta rg e ting , or su rveying work. Eve ry re a sona b le e ffort h as b e e n m ade to e nsu re th e a ccu racy of t h e inform a tion;
h oweve r, e rrors from inform a tion sou rces u se d to deve lop th is m a p m ayb e re f le cte d on th is m a p. Th e Ge oBa se Int e g ra t ion O ff ice a nd its sta ff sh a ll not b e h e ld lia b le for a ny e rrors, om issions, or dam a g e s th a t re su lt from ina ppropria te u se of th is docu m e nt.
Una u th orized re produ ction, distrib u tion, pu b lica tion, or e xh ib ition of th is m a p is STR ICTICLY PR O HIBITED. Inform a tion sa fe g u a rding a nd prope r disposal is th e re sponsib ility of th e individu a l, a g e ncy and/or com pa ny re qu e st ing a nd ta king possession of th is m a p.
Th e orig ina l size of t h is m a p is ARCH E (36" X 48"). Any a lte ra tions to th e dig ita l file or h a rdcopy pa g e will ca u se distortion to th e size or sh a pe of th e m a p’s fe a tu re s a nd resu lt in e rrors in m e a su re d
Ple ase re port a ny m a p e rrors or om issions to th e Ge oBa se Inte g ra tion O ffice Bu ilding 445 - R oom 140
DSN: 453-4811
Com m e rcia l: 701-723-4811
MINOT AIR FORCE BASE
MINOT, NORTH DAKOTA
B260 Pave m e nt Site Pla n
DEPARTMENT OF THE AIR FORCE
DIR ECT OR AT E O F EN GINEER IN G & SERVIC ES D CS/LEE - W ASHING TO N, D .C
AIR FORCE GLOBAL STRIKE COMMAND
COMPREHENSIVE PLAN
5th CIV IL ENGINEER SQUADRON
ENGINEERING FLIGHT
DRAFTING/SURVEY/GEOBASE SHOP
Date: 2/14/2019
0 1,000 2,000500 Feet
Designed By: 14Feb2019EE
Project Site
Ýò èÅ
Missile Avenue
³ 1 inch = 30 feet 1 inch = 9 meters
1:360
Docum ent Pa th: Y:\10. CEO-Operations\7. CEOE - Ops Engine ering\ 5. CEOER - Re quirem ents & Op tim iza tio n\1. FCAT-Build er 2015 \3. E.A.-\Kawago ye \Paveme nt Plann in g\260 \260 UtilitiesUpdate .mxd
Revision By Date Created 14Feb2019AOK Ke y to Fe a tu re s
Th is m a te ria l is For O fficia l Use O nly.
Th is m a p is for re fe re nce a nd pla nning pu rpose s only. Do not u se f or e ng ine e ring , navig a tion, ta rg e ting , or su rveying work. Eve ry re a sona b le e ffort h as b e e n m ade to e nsu re th e a ccu racy of t h e inform a tion;
h oweve r, e rrors from inform a tion sou rces u se d to deve lop th is m a p m ayb e re f le cte d on th is m a p. Th e Ge oBa se Int e g ra t ion O ff ice a nd its sta ff sh a ll not b e h e ld lia b le for a ny e rrors, om issions, or dam a g e s th a t re su lt from ina ppropria te u se of th is docu m e nt.
Una u th orized re produ ction, distrib u tion, pu b lica tion, or e xh ib ition of th is m a p is STR ICTICLY PR O HIBITED. Inform a tion sa fe g u a rding a nd prope r disposal is th e re sponsib ility of th e individu a l, a g e ncy and/or com pa ny re qu e st ing a nd ta king possession of th is m a p.
Th e orig ina l size of t h is m a p is ARCH E (36" X 48"). Any a lte ra tions to th e dig ita l file or h a rdcopy pa g e will ca u se distortion to th e size or sh a pe of th e m a p’s fe a tu re s a nd resu lt in e rrors in m e a su re d
Ple ase re port a ny m a p e rrors or om issions to th e Ge oBa se Inte g ra tion O ffice Bu ilding 445 - R oom 140
DSN: 453-4811
Com m e rcia l: 701-723-4811
MINOT AIR FORCE BASE
MINOT, NORTH DAKOTA
B260 Pave m e nt Utilitie s Pla n
DEPARTMENT OF THE AIR FORCE
DIR ECT OR AT E O F EN GINEER IN G & SERVIC ES D CS/LEE - W ASHING TO N, D .C
AIR FORCE GLOBAL STRIKE COMMAND
COMPREHENSIVE PLAN
5th CIV IL ENGINEER SQUADRON
ENGINEERING FLIGHT
DRAFTING/SURVEY/GEOBASE SHOP
Date: 2/14/2019
Verendrye Demarcation Elec Service Point Elec Station Transformer
! Verendrye Support Structure ! Street Light
Verendrye Span Water Main
Water Service èÅ Water Ctrl Valve
Gas Main Gas Service
Ýò Gas Service Point 0 10 205
Feet
Missile Avenue
³ 1 inch = 30 feet 1 inch = 9 meters
1:360
Docum ent Pa th: Y:\10. CEO-Operations\7. CEOE - Ops Engine ering\ 5. CEOER - Re quirem ents & Op tim iza tio n\1. FCAT-Build er 2015 \3. E.A.-\Kawago ye \Paveme nt Plann in g\260 \260 Dem oUp date.m xd
Revision By Date Created 14Feb2019AOK Ke y to Fe a tu re s
Th is m a te ria l is For O fficia l Use O nly.
Th is m a p is for re fe re nce a nd pla nning pu rpose s only. Do not u se f or e ng ine e ring , navig a tion, ta rg e ting , or su rveying work. Eve ry re a sona b le e ffort h as b e e n m ade to e nsu re th e a ccu racy of t h e inform a tion;
h oweve r, e rrors from inform a tion sou rces u se d to deve lop th is m a p m ayb e re f le cte d on th is m a p. Th e Ge oBa se Int e g ra t ion O ff ice a nd its sta ff sh a ll not b e h e ld lia b le for a ny e rrors, om issions, or dam a g e s th a t re su lt from ina ppropria te u se of th is docu m e nt.
Una u th orized re produ ction, distrib u tion, pu b lica tion, or e xh ib ition of th is m a p is STR ICTICLY PR O HIBITED. Inform a tion sa fe g u a rding a nd prope r disposal is th e re sponsib ility of th e individu a l, a g e ncy and/or com pa ny re qu e st ing a nd ta king possession of th is m a p.
Th e orig ina l size of t h is m a p is ARCH E (36" X 48"). Any a lte ra tions to th e dig ita l file or h a rdcopy pa g e will ca u se distortion to th e size or sh a pe of th e m a p’s fe a tu re s a nd resu lt in e rrors in m e a su re d
Ple ase re port a ny m a p e rrors or om issions to th e Ge oBa se Inte g ra tion O ffice Bu ilding 445 - R oom 140
DSN: 453-4811
Com m e rcia l: 701-723-4811
MINOT AIR FORCE BASE
MINOT, NORTH DAKOTA
B260 Pave m e nt De m olition Pla n
DEPARTMENT OF THE AIR FORCE
DIR ECT OR AT E O F EN GINEER IN G & SERVIC ES D CS/LEE - W ASHING TO N, D .C
AIR FORCE GLOBAL STRIKE COMMAND
COMPREHENSIVE PLAN
5th CIV IL ENGINEER SQUADRON
ENGINEERING FLIGHT
DRAFTING/SURVEY/GEOBASE SHOP
Date: 2/14/2019
Mill 2" Asphalt Demo Concrete Demo Curb/Gutter
0 10 205
Missile Avenue
³ 1 inch = 30 feet 1 inch = 9 meters
1:360
Docum ent Pa th: Y:\10. CEO-Operations\7. CEOE - Ops Engine ering\ 5. CEOER - Re quirem ents & Op tim iza tio n\1. FCAT-Build er 2015 \3. E.A.-\Kawago ye \Paveme nt Plann in g\260 \260 ConsUpdat e.mxd
Revision By Date Created 14Feb2019AOK Ke y to Fe a tu re s
Th is m a te ria l is For O fficia l Use O nly.
Th is m a p is for re fe re nce a nd pla nning pu rpose s only. Do not u se f or e ng ine e ring , navig a tion, ta rg e ting , or su rveying work. Eve ry re a sona b le e ffort h as b e e n m ade to e nsu re th e a ccu racy of t h e inform a tion;
h oweve r, e rrors from inform a tion sou rces u se d to deve lop th is m a p m ayb e re f le cte d on th is m a p. Th e Ge oBa se Int e g ra t ion O ff ice a nd its sta ff sh a ll not b e h e ld lia b le for a ny e rrors, om issions, or dam a g e s th a t re su lt from ina ppropria te u se of th is docu m e nt.
Una u th orized re produ ction, distrib u tion, pu b lica tion, or e xh ib ition of th is m a p is STR ICTICLY PR O HIBITED. Inform a tion sa fe g u a rding a nd prope r disposal is th e re sponsib ility of th e individu a l, a g e ncy and/or com pa ny re qu e st ing a nd ta king possession of th is m a p.
Th e orig ina l size of t h is m a p is ARCH E (36" X 48"). Any a lte ra tions to th e dig ita l file or h a rdcopy pa g e will ca u se distortion to th e size or sh a pe of th e m a p’s fe a tu re s a nd resu lt in e rrors in m e a su re d
Ple ase re port a ny m a p e rrors or om issions to th e Ge oBa se Inte g ra tion O ffice Bu ilding 445 - R oom 140
DSN: 453-4811
Com m e rcia l: 701-723-4811
MINOT AIR FORCE BASE
MINOT, NORTH DAKOTA
B260 Pave m e nt Constru ction Pla n
DEPARTMENT OF THE AIR FORCE
DIR ECT OR AT E O F EN GINEER IN G & SERVIC ES D CS/LEE - W ASHING TO N, D .C
AIR FORCE GLOBAL STRIKE COMMAND
COMPREHENSIVE PLAN
5th CIV IL ENGINEER SQUADRON
ENGINEERING FLIGHT
DRAFTING/SURVEY/GEOBASE SHOP
Date: 2/14/2019
Overlay 2" Asphalt ACC Full Depth Patching Construct Curb/Gutter
0 10 205
| 260 ConsUpdate |
| 260 UtilitiesUpdate |
| 260 DemoUpdate |
| 260 ConsUpdate |
File details come from the government source that posted it.