Attachment_7_-_Seed_SOW_Bldg_260_Paving_Project.docx
DOCX document 16 KB Posted
- Attached to
- Paving IDIQ Federal contract opportunity
- Solicitation number
- FA4528-19-R-A005
About this file
Attachment 7 - Seed SOW Bldg 260 Paving
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_7_-_Revised_Seed_SOW_Bldg_260_Paving_Project.docx | DOCX document | |
| Attachment__8_-_Revised_Seed_Drawings_Bldg_260_Paving_Project.pdf | ||
| SF_30.pdf | ||
| Attachment_13_-_Questions_and_Answers.docx | DOCX document | |
| Attachment_6_-_Client_Authorization_Letter.docx | DOCX document | |
| Attachment_11_-_Section_L.docx | DOCX document | |
| Attachment_8_-_Seed_Drawings_Bldg_260_Paving_Project.pdf | ||
| Attachment_10_-_Financial_Responsibility.docx | DOCX document | |
| Attachment_12_-_Section_M.docx | DOCX document | |
| Attachment_3_-_Past_Performance_Questionnaire_(PPQ).docx | DOCX document | |
| Solicitation_-_FA452819RA005.pdf | ||
| Attachment_2_-_DBA_Wage_Determination_4_Jan_19.pdf | ||
| Attachment_9_-_FOPR_for_Seed_Project.docx.pdf | ||
| Attachment_4_-_Subcontractor_Consent_Letter_ex.pdf | ||
| Attachment_1_-_Paving_IDIQ_Specifications.pdf | ||
| Attachment_5_-_MACC_Provisions.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4528-19-R-A005
Attachment 7 Scope of Work Pavements Repair IDIQ Seed Project Bldg. 260 Parking Lot
1. Mill 2 inches of existing asphalt pavement (approximately 1,400 SY)
2. Overlay 2 inches of PG 58-34 AC Hot Mix Asphalt (approximately 1,400 SY)
a. New pavement shall be graded to ensure proper drainage and shall transition to match existing pavements.
b. New pavement shall align with existing manholes to ensure there are no raised edges between the manholes and the asphalt.
c. New pavement shall align with existing concrete pads and aprons to ensure smooth transitions between them.
d. Overlay shall include a bituminous tack coat placed on the underlying layer.
3. Remove and dispose of concrete curb and gutter (approximately 550 LF)
4. Place new PCC curb and gutter (approximately 550 LF)
5. Measure and verify all existing pavement markings and then replicate these marking on the new pavement (approximately 720 LF 4” wide)
6. All work is to be done in compliance with the provided specifications Note: All quantities are approximated and will need to be verified by the contractor.