Attachment_6_Construction_Cost_Breakdown.xls
XLS spreadsheet 28 KB Posted
- Attached to
- Construct SGT Pad Federal contract opportunity
- Solicitation number
- FA4528-16-R-0005
About this file
Attachment 6 Construction Cost Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_7_Q A_20_July_2016.pdf | ||
| Attachment_1_Specifications_20_July_2016.pdf | ||
| FA4528-16-R-0005-0001.pdf | ||
| Attachment_2_Drawings_20_July_2016.pdf | ||
| FA4528-16-R-0005.pdf | ||
| Attachment_2_Drawings.pdf | ||
| Attachment_5_Financial_Responsibility.pdf | ||
| Attachment_3_Wage_Determination.pdf | ||
| Attachment_4_Past_Performance_Information_Form.pdf | ||
| Attachment_1_Specifications.pdf | ||
| FA4528-16-R-0005_Synopsis.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6
| Attachment 6 - Construction Cost Breakdown | |||||||
| FA4528-16-R-0005 | Contractor Name | ||||||
| QJVF 14-0027 Construct SGT Pad | Date | ||||||
| Item | Description | Item Includes | Units | Material Cost | Labor | Other Direct Costs | Total |
| 1 | Division 1 | General Requirements | Lot | ||||
| 2 | Division 3 | Construct 6" Thick PCC Paving, Construct 2" ACC Surface Coarse, Construct 4" ACC Base Coarse, Construct Thickened Edge | Lot | ||||
| 3 | Division 26 | Electrical - Block Heaters, Service, and Lightning Protection | Lot | ||||
| 4 | Division 31 | Clear and Grub, Sawcut Pavement, Install Silt Fence, Rolled Erosion Control, Construct Rock Access Road, Strip Stockpile and Respread Topsoil, Earthwork, Subgrade Prep, Geotextile | Lot | ||||
| 5 | Division 32 | Seeding, Drainage Layer, Construct Bollard, Pavement Marking | Lot | ||||
| 6 | Division 33 | Construct 12" RCP, Construct 15" RCP, Construct 12" FES, Construct 15" FES, Construct 4" Underdrain, Construct Underdrain Inspection Hole, Tap RCP with Underdrain | Lot | ||||
| 7 | |||||||
| 8 | |||||||
| Sub-Total | |||||||
| Overhead | |||||||
| Profit | |||||||
| Total Proposed Cost |
File details come from the government source that posted it. Updated .