02_61_10_DAFB_Environmental_Control_(9_April_2018).doc

DOC document 174 KB Posted

Attached to
Install Industrial Fans B639 & B515 Federal contract opportunity
Solicitation number
FA449719RA034
Issued by
Department of the Air Force Special Operations Command

About this file

Environmental Control

View the file

Other files for this federal contract opportunity

Other files attached to Install Industrial Fans B639 & B515, newest first.
File Type Posted
Amendment_FA449719RA0340001.pdf PDF
Solicitation_No__FA449719RA034_PreBid_Questions.docx DOCX document
Amendment_FA449719RA0340001.pdf PDF
Amendment_FA449719RA0340001.pdf PDF
DAFB_Architectural_Compatibility_Plan.pdf PDF
Solicitation_-_FA449719RA034.pdf PDF
01_11_10_DAFB_General_Requirements_(9_April_2018).doc DOC document
01_14_10_DAFB_Site_Management_(9_April_2017).pdf PDF
Wage_Determination.pdf PDF
Operational_Climactic_Data_2018.pdf PDF
DAFB_Local_Design_Guide_w_Appendix_D_(9_April_2017).pdf PDF
2._1081630_Install_Industrial_Fans_B639_and_B515.docx DOCX document
31_25_10_DAFB_Sediment_and_Erosion_Control_(9_April_2018).doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8 Nov 10

Project Number

9 April 2018

02 61 10

DOVER AFB ENVIRONMENTAL SPECIFICATIONS

Part A. Hazardous Materials Usage Part B. Affirmative Procurement

Part C. Recycling of Construction Debris Part D. Excess Soil Requiring Disposal Guidelines

Part E. Disposal of Encountered Groundwater

Part F. Conformance with Environmental Management System

Part G. Air Permitting Part A. Hazardous Materials Usage by Contractors

1. Purpose. As required by AFI 32-7086, Hazardous Materials Management, paragraphs 2.5.5.2.4, 2.5.5.2.8 and 2.5.5.2.9; requires Dover AFB to account for all hazardous materials (HAZMATs) brought on the facility to include contractors as well as providing procedures for the reporting of those items.

1.1. This part outlines actions to be taken by the contractor in the request for approval of hazardous materials prior to initiating field activities associated with the subject project and the reporting of approved hazardous materials usage during contract performance.

1.2. Compliance with this part is mandatory and contactor failure to comply will result in the contractor not being allowed to bring any hazardous materials on Dover AFB. Contractors must also comply with mandatory Federal, State and local guidelines, regarding storage and management of hazardous materials, failure to comply can result in legal action by Federal, State or local enforcement officers against the offender.

2. Policy. Dover AFB policy is to comply with Federal, State, Local and Air Force regulations pertaining to the purchase, storage, handling and reporting of HAZMAT.

3. Responsibilities for Contractor Reported Usage of HAZMAT.

3.1. Contractors must submit to the associated Contracting Office the information and supporting documentation (including Material Safety Data Sheets (MSDSs)) necessary to obtain HAZMAT usage authorization. Report data on the HAZMAT used during the performance of the contract at intervals and in the format specified by Dover AFB (reference Attachment 2).

3.2. The contractor shall provide a completed Dover AFB HAZMAT Chemical Worksheet, (sample included below as Attachment 1) for each HAZMAT to be used during the duration of the contract to include MSDS. This list of all HAZMATs shall be provided at the beginning of the contract. Any additional HAZMATs required during the course of the contract shall be requested for approval at that time. In addition, the quantity of chemicals expended will be reported to the Dover AFB Hazardous Materials Pharmacy (HAZMART) by filling out the Contractor’s Monthly Report for HAZMATS, reference Attachment 2 below. For contracts with a duration of less than six months, and Blanket Purchase Agreements, the contractor shall complete the form at Attachment 2 at the completion of each contract/call.

3.3. If non-compliance is identified, the QAE/Government Inspector will notify the Contracting Officer of the specific issue. Contractor, upon notification from Contracting Officer, will take immediate action to ensure compliance.

3.4 Attachment 3 contains the volatile organic compound (VOC) limits for architectural coatings. Applicable hazardous materials requests for use will be compared to these limits. VOC levels for a particular coating cannot exceed the limit presented in Attachment 3. Coatings submitted for use with VOC levels above those in Attachment 3 will be disapproved for use on Dover AFB in accordance with the Delaware Regulations Governing Air Pollution, Regulation 41. A copy of the Delaware Regulations Governing Air Pollution, Regulation 41 is available at the following web site.

http://www.dnrec.state.de.us/air/aqm_page/regs.htm

ATTACHMENT 1 DOVER AFB HAZMAT CHEMICAL WORKSHEET

ATTACHMENT 2

ATTACHMENT 3

VOC CONTENT LIMITS FOR ARCHITECTURAL COATINGS

DNREC VOC CONTENT LIMITS FOR ARCHITECTURAL COATINGS (New Requirements) Note: Limits are expressed in grams of VOC per liter of coating thinned to the manufacturer's maximum recommendation (as indicated on the label or lid of the coating container), excluding the volume of any water, exempt compounds, or colorant added to tint bases.

Coating Category
VOC Content Limit
Compliance Date 1/1/2005 through 2/28/2017
Compliance Date Effective 3/1/2017
Flat Coatings
100
50
Non-flat Coatings
150
100
Non-flat-High Gloss Coatings
250
150

Specialty Coatings

Aluminum Roof
N/A
450
Antenna Coatings
530
N/A
Anti-fouling Coatings
400*
N/A
Basement Specialty Coatings
N/A
400
Bituminous Roof Coatings
300
270
Bituminous Roof Primers
350
350
Bond Breakers
350
350
Calcimine Recoaters
475*
475*

Clear Wood Coatings

Clear Brushing Lacquers
680
N/A
Lacquers (including lacquer sanding sealers)
550
N/A
Sanding Sealers (not lacquer sanding sealers)
350
N/A
Varnishes
350
N/A
Conversion Varnish
725*
See below
Concrete Curing Compounds
350*
350*
Concrete/Masonry Sealer
N/A
100
Concrete Surface Retarders
780*
780*
Conjugated Oil Varnish
N/A
450
Conversion Varnish
725*
725*
Driveway Sealers
N/A
50
Dry Fog Coatings
400*
150
Faux Finishing Coatings
350
350
Fire-resistive Coatings
350
350

Fire-retardant Coatings

Clear
650
N/A
Opaque
350
N/A
Floor Coatings
250
100
Flow Coatings
420
N/A
Form-release Compounds
250
250
Graphic Arts Coatings (Sign Paints)
500*
500*
High-temperature Coatings
420
420
Impacted Immersion Coatings
780*
780*
Industrial Maintenance Coatings
340
250
Low-solids Coating
120*(1)
120*(1)
Magnesite Cement Coatings
450
450
Mastic Texture Coatings
300*
100
Metallic Pigmented Coatings
500
500
Multi-color Coatings
250
250
Nuclear Coatings
450*
450*
Pre-treatment Wash Primers
420
420

Primers, Sealers, and Undercoaters

Quick-dry Enamels
200
100
Quick-dry Primers, Sealers, and Undercoaters
200
N/A
Reactive Penetrating Carbonate Stone Sealer
200
N/A
Reactive Penetrating Sealer
N/A
500
Recycled Coatings
N/A
350
Roof Coatings
250
250
Rust Preventative Coatings
250
250
Shellacs
400*
250

Clear

Opaque
730
730
Specialty Primers, Sealers, and Undercoaters
550
550
Stains
350
100
Stone Consolidant
250
250
Swimming Pool Coatings
N/A
450
Swimming Pool Repair and Maintenance Coatings
340
340
Temperature-indicator Safety Coatings
340
N/A
Thermoplastic Rubber Coatings and Mastic
550
N/A
Traffic Marking Coatings
550*
550*
Tub and Tile Refinish
150*
100
Waterproofing Membranes
N/A
420
Waterproofing Sealers
N/A
250
Waterproofing Concrete/Masonry Sealers
250
N/A
Wood Coatings
400
N/A
Wood Preservatives
N/A
275
Zinc-rich Primer
350
350
N/A
340

* Indicates limits and definition unchanged from the Federal rule (40CFR59 Subpart D) “National Volatile Organic Compound Emission Standards for Architectural Coatings” which is still in effect.

(1) Units are grams of VOC per liter of coating, including water and exempt compounds (the VOC actual).

Part B. Affirmative Procurement

1.01 Introduction. Affirmative Procurement (AP) is the name given to the federal program to strengthen efforts to protect the environment and promote economic growth through the purchase of recycled and other environmentally preferable products. The standard three-arrow recycling symbol represents not only collection of recyclable materials, but also manufacturing and use of recycled products. Recycling can succeed in diverting materials from landfills only if markets for products made from recycled materials expand. A recovered material or recycled material is a waste material or by-product recovered or diverted from solid waste and utilized in place of raw or virgin material in product manufacturing. Today, products made from recycled materials rival virgin products in quality and cost. Yet, the market for these items is still in its infancy. Purchasing recycled materials through affirmative procurement will significantly increase the use of these products and will close the loop of our recycling efforts. The Environmental Protection Agency (EPA) has designated specific guideline items, which when meeting certain criteria, federal agencies are required to purchase to the maximum extent practicable. Air Force "consumers" are subject to these mandates for the procurement of recycled content products. These mandates apply equally to all DAFB organizations, tenant organizations, and contractors.

The federal government is committed to minimizing the adverse environmental impacts of its purchases. Spending more than $200 billion annually on the purchase of products and services, the federal government’s commitment to Environmental Preferable Purchasing (EPP) is helping increase the availability of products and services with improved environmental performance. EPP, however, does not only protect the environment; it also protects human health, saves money, and improves the overall quality of government purchases (Environmentally Preferable Products Final Guidance Brochure; http://www.epa.gov). As the program matures, revenues from recycling programs will increase; costs for recycled-content products will decrease; dependence on land filling and requirements for virgin materials use will decrease. The resulting savings in money and resources will ultimately improve our readiness. Environmental and financial gains can be achieved on a national level. Promoting waste prevention by purchasing recovered items can slow the use of virgin material and the rate at which our landfills become filled and closed. This is especially true for paper since paper takes up roughly one-third the space in landfills nationwide. Federal government procurement and use of recycled products, especially re-refined oil, can reduce our nation's dependency on foreign governments for raw materials.

1.02 Definitions. The following definitions apply to this section.

A. Post Consumer materials means a material or finished product that has served its intended end use and has been diverted or recovered from waste destined for disposal, having completed its life as a consumer item. Post consuming material is part of the broader category of recovered materials.

B. Recovered materials means waste material and byproducts which have been recovered or diverted from solid waste, but such term does not include those materials and byproducts generated from, and commonly reused within, an original manufacturing process.

C. Recycled materials means a material that can be utilized in place of a raw or virgin material in manufacturing a product and consists of materials derived from post-consumer waste, industrial scrap, material derived from agricultural wastes and other items, all of which can be used in the manufacture of new products.

D. Comprehensive Procurement Guidelines (CPG). The EPA is required to designate products that are or can be made with recovered materials as authorized by RCRA Section 6002 and EO 13101. EPA reviews a broad list of potential products made from recovered materials. EPA then compiles this list through various sources of publicly available information and includes items previously researched and still under consideration by EPA. The EPA also issues guidance on buying recycled-content products in Recovered Materials Advisory Notices (RMANs), which recommend recycled-content ranges for CPG products. RMAN levels are updated as marketplace conditions change. All current and proposed guideline items and their associated recycled content requirements, product specifications, RMANs, and list of manufactures and suppliers can be viewed on EPA’s web page located at http://www.epa.gov/cpg. Other sections of the web page provide product fact sheets, frequently asked questions with answers, and CPG program updates.

1.03 Contractor Implementation of Affirmative Procurement

The requirements of the AP program are applicable to all DAFB requiring activities that: (1) prepare specifications for products; (2) procure or request procurement of products; and (3) provide support to base organizations (e.g., Civil Engineer Squadron, Logistics Readiness Squadron and Contracting Squadron). These procedures also apply to DAFB contractors as long as appropriate provisions are contained in the contracts. Section 6002 of RCRA requires each federal agency to establish an Affirmative Procurement Program that explains the agency's strategy for maximizing its purchases of USEPA designated items. RCRA requires that Affirmative Procurement Programs have, at a minimum, the following four elements:

A. A preference program in which the agency shows its preference for recycled products by procuring items that meet recycled material content levels and specifications. All contractors associated with this project are responsible for implementing this preference program element. The EPA has provided the following web site, http://www.epa.gov/cpg/products.htm, listing the CPG, which will provide all the necessary information needed to make the proper purchases. Since the website is updated continually, this plan will reference the website instead of listing all items. Contractors are encouraged to check the "Products" section of the web page for all current designated and proposed guideline items and their associated recycled-content requirements. The "Background" section of the web page lists the full text of the RMAN (click on each category for complete updated information). Other sections of the web page provide product fact sheets, give CPG program updates, and answer frequently asked questions. The website also allows customers to report success stories on affirmative procurement. The DAFB preference program includes the following: The EPA recommended minimum recovered material content levels for designated items are the required minimum recovered material content levels for procurement of these items. DAFB will give preference to the selection of EPA designated items in the procurement process. Preference will be given to products containing the highest percentage of recovered materials practicable, consistent with performance, competition and availability.

B. Regardless of the method of solicitation used, award will be made in accordance with customary award procedures, typically to the lowest priced responsible bidder, regardless of whether the product contains recovered material. In the event that two or more low bids are received that offer different levels of recovered materials content, award will be made in accordance with customary award procedures, typically to the lowest priced responsible offeror. In the case of identical low bids, award will be made to the offeror with the higher level of recovered material content, all other factors being equal.

C. Unique requirements for certain designated items and exemptions. Affirmative Procurement is intended to promote cost-effective, environmentally preferable purchasing. Recycled content products meeting EPA guidelines will always be purchased unless an exemption is claimed based on one of the four established criteria;

1. Items are not available within a reasonable period of time, or

2. Items fail to meet the performance standards set forth in applicable specifications or fail to meet reasonable performance standards of the procuring agency; or

3. Items are not available from a sufficient number of sources to maintain a satisfactory level of competition (i.e., available from two or more sources); or

4. Items are available at an unreasonable price. If the price of the recycled-content product exceeds the cost of a comparable non-recycled item by more than 10%, then the price is considered unreasonable.

D. Submittal/Certification. Prior to purchasing any items or starting field activities, contractors shall submit Attachment 4 which indicates the applicable items (contractor shall verify no new items have been added to this list for inclusion under the “Other” line item) will be purchased / installed with the appropriate percentage of recovered materials. If the contractor determines that an item to be purchased / installed under this contract/call/delivery order meets the requirements of an exemption, the appropriate information shall be provided on the same form as well. The contractor shall provide the Contracting Officer with Attachment 4, assurances from vendors to include (1) written certification that their products meet the minimum content standards in the solicitation documents to be provided with the associated AF Form 3000, Material Submittals; (2) maintain copies of certification documents; (3) produce copies of the written certification upon request by DAFB and (4) documentation justifying request for exemption. Attachment 4 will be approved by the project manager and the contracting officer.

1. For contracts with options, the form at Attachment 4 shall be completed at the beginning of the contract and annually afterwards.

2. For Blanket Purchase Agreements with individual calls the form at Attachment 4 shall be completed prior to every call/delivery order. Note that an exemption on a specific call is valid for one year after that approval. The first call after the exemption year must provide the appropriate recovery containing material or request another exemption. Updated exemption documentation is necessary at this time.

3. For one-year contracts and any other types of contracts not specifically mentioned, the form at Attachment 4 shall be completed at the beginning of the contract.

E. Verification. The Affirmative Procurement Working Group (APWG) will periodically review vendor certification documents as part of the annual review and monitoring process. Such reviews shall enable APWG to verify the contractors' compliance with EO 13101.

F. Exemption Documentation. When procuring guideline items, any decision not to acquire items meeting USEPA content standards must be based on one of these exemptions and requires a written documentation. If the exemption is cited on performance standards, the written determination must be based on the National Institute of Standards and Technology guidelines, if available. FAR 23.405(c)(3) places the responsibility to prepare this determination on "technical or requirements personnel." This documentation shall be provided with the submittal of Attachment 4 as required depending on your type of contract/call.

G. Contractor Reporting Requirements. Contractor shall provide a summary at contract/call/delivery order completion indicating the amount of products provided with recycled content (along with their respective recycled content percentage) along with the amount of funds spent on these products. The "Estimate of Percentage of Recovered Material Content for EPA-Designated Products" is required by the clause at FAR 52.223-9 to be provided to the Contracting Officer by the contractor at contract/call/delivery order completion.

Attachment 4

Summary and Determination Worksheet

This form provides documentation for items procured with the appropriate EPA-designated product containing recovered material and/or documents the rationale for not procuring an EPA-designated product containing recovered material. For product or required recycled content information, refer to the product descriptions on the EPA’s website at www.epa.gov/cpg/products

The completed form becomes part of the contracting office contract file.

Procurement Request / Project No._______________________________________________

The EPA-designated items that will be procured in association with the appropriate containing recovered material for this contract/call/delivery order are marked. If other items are added to the EPA website and are not contained on this list, the contractor shall mark “other” and fill in the appropriate information:

___ Building insulation

___ Polyester carpet ___ Binders

(paper, solid plastic or plastic covered) ___ Playground surfaces

___ Park and recreational furniture

Cement & concrete containing:

___ Coal fly ash

___ Ground granulated blast furnace slag

___ Cenospheres

___ Silica fume ___ Plastic presentation folders ___ Plastic file folders

___ Plastic clip portfolios ___ Running tracks

___ Playground equipment

___ Traffic barricades

___ Flowable fill

___ Latex paint

___ Floor tiles

___ Laminated paperboard ___ Plastic clipboards

___ Office furniture

___ Office recycling containers

___ Office waste receptacles ___ Plastic desktop accessories ___ Traffic cones

___ Parking stops

___ Plastic fencing (snow or erosion control, safety barriers)

___ Channelizers

___ Patio blocks
___ Plastic envelopes
___ Delineators

___ Shower & restroom dividers/partitions ___ Plastic trash bags

___ Flexible delineators

___ Rebuilt vehicular parts

___ Structural fiberboard
___ Printer ribbons
___ Engine coolants

___ Railroad grade crossings/ surfaces ___ Toner cartridges

___ Newsprint ___ Re-refined lubricating oils

___ Retread tires

___ Garden and soaker hoses

___ Lawn and garden edging ___ Commercial/industrial sanitary tissue products ___ Sorbents

___ Awards and plaques

___ Landscaping timbers and posts (plastic lumber) ___ Printing and writing papers

___ Paperboard and packaging ___ Mats

___ Signage

___ Hydraulic mulch
___ Tray liners
___ Strapping

___ Compost from yard trimmings or food waste

___ Industrial drums
___ Pallets

___ Modular threshold ramps

___ Nonpressure pipe

___ Bike racks

___ Roofing materials

___ Blasting grit

___ Other Items (describe)

Item(s) Utilized Containing Recycled Content:

Quantity

Estimated Dollar Value:

_____ EPA recycled content requirements have been met for this procurement action.

Technical OPR - Signature and Office Symbol Date

Concurrence - Contracting Officer

Date

Attachment 4 Continued Exemption Request

Item:

Quantity Associated with this Request:__________

EPA recycled content requirements cannot be met for this procurement action based on the following:

A. _____ EPA designated item is not competitively available within a reasonable period of time.

Need date: __________________. ____ (insert number) vendors were contacted, and the following offers/information was received related to proposed EPA designated item(s) (list vendor name/proposed delivery date): ________________________________________________________________________________________________________________________________________________

Rationale that the proposed delivery date(s) for EPA designated item(s) is/are inadequate:

B. _____ Item is not available a reasonable price (i.e., EPA designated item is more expensive).

Price(s) of EPA designated item(s): ____________________

Price(s) of non-EPA designated item(s): ____________________

C. _____ Item does not meet a performance standard in the specifications.

Describe the standard and why it is needed: ______________________________________________________________________________________________________________________________________________

Describe how the guideline item(s) fail(s) to meet the standard: ________________________________________________________________________________________________________________________________________________

This determination is made in accordance with FAR 23.405(c).

Technical OPR - Signature and Office Symbol Date

Concurrence - Contracting Officer

Date

Part C. Recycling Materials from Facilities

1.0 The contractor and Dover AFB representatives shall make every attempt to recycle as much construction debris as possible and within financial reason. The contractor shall decide whether to utilize the provided Dover AFB recycling avenues or recycle through own means. At a minimum, the contractor shall recycle the items identified below unless justification is provided documenting hardship for recycling.

1.01. Recycling Services Required by Contractors and Services Available from Dover AFB: Dover AFB Qualified Recycling Program recycles the following items and will provide roll-offs for their subsequent collection to contractors upon request. Contractor shall request roll-offs at least three days prior to requirement and shall request for their removal three days in advance. Roll-offs can be coordinated with CES/CEV at extension 6844 or by contacting the recycling center at extension 4508 (recycling center located at Facility 650). Items to be recycled that contain or have been coated or covered with materials that are, or which could become, hazardous if spilled or disturbed in handling, (such as items containing asbestos; and fuel/waste storage tanks), shall be cleaned to remove all such hazardous or potentially hazardous materials prior to recycling. Cleaning shall be accomplished in accordance with all applicable local, state and federal regulations. Residue from cleaning operation will be collected and disposed of by the Contractor in accordance with all local, state and federal regulations. Due to market fluctuations regarding government incurred costs pertaining to recycling, the contractor cannot request assistance on only one of the following items. For example, the contractor cannot recycle scrap metal and request Dover AFB provide roll-offs for wood. If the contractor requests Dover AFB assistance, the contractor must allow Dover AFB to manage all associated recycling with the project.

a. All scrap metal to include, but not limited to steel, aluminum, copper, brass, and lead

1. Scrap metal must be separated and segregated.

2. All scrap metal cannot exceed 20 foot lengths to ensure recycling through the standard roll-offs.

b. Wood – shall be able to placed within a roll-off.

c. PVC Piping/Plastics – shall not exceed 5 foot in length.

d. Cardboard

1.02 Recycling Services Required By Contractors however, direct services unavailable from Dover AFB FOR concrete and asphalt.

Tilcon Construction (located adjacent to Dover AFB on the opposite side of State Route 1) and George and Lynch (located at 3700 Bay Road, north of Dover AFB), both offer these services.

1.03 The contractor is welcome to provide other recycling opportunities if financially acceptable, however, no additional project funding will be provided to recycle items not previously mentioned.

1.04 Contractor shall complete the form identified as Attachment 5 and submit monthly for contracts, BPA calls, and delivery orders with durations greater than 6 months. For contracts, BPA calls and delivery orders with a duration of less than 6 months, submit at the completion of the project.

Attachment 5

CONSTRUCTION & DEMOLITION DEBRIS WORKSHEET

Date:

Project:
Prepared by:
Quarter:
Project Cost:
PROCEDURES
AMOUNT
COST (Per Ton)
1. Total Refuse Disposed (Landfilled)
tons
2. C&D Recycled
AMOUNT
REVENUE
a. C&D Mulched
tons
b. C&D Reused in Project
tons
c. C&D Diverted (Other Recycling)
tons
d. C&D Incinerated
tons
e. C&D Waste to Energy
tons

2.0 Hazardous/Universal Waste

2.1. Light Fixtures ‑ All fluorescent tubes, mercury vapor, metal halide and HP sodium lamps shall be collected into a box or drum and turned in to CEV at Bldg 1306, Thursdays, 0800-1000 hrs. All ballasts and capacitors not specifically stating PCB-Free shall be collected and turned in to CEV at Bldg 1306. The removal of any transformers shall be coordinated through CEV to determine the PCB content and the appropriate disposal mechanism.

2.2 Mercury Thermostats shall also be collected and turned in to CES/CEAN at Bldg 1306, Thursdays between 0800-1000.

2.3. Contact CES/CEAN at 302-677-6839 prior to the applicable Thursday for prior coordination of turn-in.

Part D. Excess Soil Requiring Disposal

1.0 The disposal of excess soil associated with construction activities at Dover AFB shall be in accordance with the following requirements. No excess soil shall be removed from Dover AFB by the contractor until the contractor has sampled and analyzed the soil for contamination and Dover AFB has approved an appropriate disposal method.

2.0 Stockpile - The contractor shall stockpile excess soil from the construction site in stockpiles no greater than 250 cubic yards and on an approved underlining material. Completed stockpiles shall be covered with an approved covering material. Upon partial or final accumulation of excess soils, and prior to initiating sampling of the stockpiled material, the contractor shall notify Dover AFB to witness sampling. The contractor shall maintain the stockpile until the sampling and analysis process is complete and Dover AFB gives approval for disposal.

3.0 Sampling and Analysis - The contractor shall collect a composite sample from each stockpile to be disposed. The contractor shall have the sample(s) analyzed by an approved laboratory. Each sample must be analyzed for the following:

· Full TCLP (toxicity characteristic leaching procedure) to include ignitability, reactivity, corrosivity, metals, organics, pesticides and herbicides

· Total Petroleum Hydrocarbons (TPH)

· Polychlorinated Biphenyls (PCBs)

· BTEX (Benzene, Toluene, Xylene, and Ethyl benzene)

· Percent Solids

The contractor shall submit the laboratory analysis results to Dover AFB for review and approval of a disposal method.

4.0 Disposal – The method to be used for excess soil disposal is dependent on the laboratory analysis results. Dover AFB will review the analytical results and approve a disposal method.

4.1 When analytical results indicate no contamination, or contaminant levels are below minimum regulatory thresholds, the contractor shall dispose of excess soil as required by the appropriate contract specifications.

4.2 When analytical results indicate the presence of contamination at levels exceeding regulatory thresholds, Dover AFB will inform the contractor, and Dover AFB will dispose of the contaminated soil by separate contract. If the contractor’s equipment is still present on site, the contractor shall load Government provided disposal trucks. The contractor shall be aware that scheduling the disposal of contaminated soil will vary depending on the disposal requirements specific to the type of contamination, and the disposal contractor’s schedules. The contractor shall maintain the contaminated soil stockpiles as per Part D paragraph 2.0 until such time as Dover AFB can arrange for their disposal.

Part E. Disposal of Extracted Groundwater

1.0 The disposal of groundwater captured during construction activities at Dover AFB shall be in accordance with the following requirements. No groundwater shall be extracted or discharged by the contractor at Dover AFB without an approved dewatering permit. No extracted groundwater shall be discharged on base or removed from Dover AFB by the contractor a) unless it is in accordance with the dewatering permit, b) until the contractor has sampled and analyzed the extracted groundwater for contamination, and c) until Dover AFB gives approval for disposal. The design documents indicate the potential for encountering groundwater during construction activities. Whether groundwater is expected or unexpected, the same requirements are applicable.

2.0 Permit - Dewatering of groundwater requires a permit from the State of Delaware, Department of Natural Resources and Environmental Control (DNREC). The contractor shall prepare a dewatering permit application in accordance with the Delaware Regulations Governing the Construction and Use of Wells. The contractor shall submit the permit application to Dover AFB for review and signature prior to submitting it to DNREC. The contractor shall comply with all dewatering permit conditions.

3.0 Storage Tanks/Containers - The contractor shall provide storage tanks/containers and containerize all extracted groundwater. If containerization is impracticable due to the volume and rate of groundwater extraction, an alternate system of testing, treatment and/or disposal may be proposed by the contractor in accordance with the dewatering permit, and implemented by the contractor upon approval by Dover AFB. In such cases, periodic water quality testing may be required under the dewatering permit to verify that no contaminated groundwater is being discharged.

4.0 Sampling and Analysis – All containerized groundwater must be sampled in order to determine appropriate disposal methods. In the case where containerization is impractical and an alternate system of testing, treatment, or disposal has been approved, the contractor shall perform alternate sampling and analysis activities as required under the permit and approved by Dover AFB.

The contractor shall sample the extracted groundwater in each container (one sample per container) and have the sample(s) analyzed by an approved laboratory. Each sample must be analyzed for the following:

· Full TCLP (toxicity characteristic leaching procedure) to include ignitability, reactivity, corrosivity, metals, organics, pesticides and herbicides

· Total Petroleum Hydrocarbons (TPH)

· Polychlorinated Biphenyls (PCBs)

· BTEX (Benzene, Toluene, Xylene, and Ethyl benzene)

· Percent Solids

· Volatile Organic Compounds (VOCs), SW-846 Method 5030B/8260B or equivalent

The contractor shall submit the laboratory analysis results to Dover AFB for review and approval of a disposal method.

5.0 Disposal – The method to be used for disposing of containerized groundwater is dependent on the laboratory analysis results. Dover AFB will review the analytical results and approve a disposal method.

5.1. When analytical results indicate no contamination, or contaminant levels are below minimum regulatory thresholds, the contractor will be instructed to discharge to the Dover AFB storm sewer or through an oil/water separator to the sanitary sewer system. Discharge through filter bags may be required under the dewatering permit or sediment and erosion control requirements. It is the contractor’s responsibility to empty and clean the tanks/containers when on site disposal is warranted. Disposal through the oil/water separator will most likely occur at Facility 706. Unavailability of Facility 706 may prompt disposal elsewhere on Dover AFB.

5.2. When analytical results indicate the presence of contamination at levels exceeding regulatory thresholds, Dover AFB will inform the contractor, and Dover AFB will set up disposal and tank cleaning services under separate contract. The contractor shall be aware that scheduling the disposal of contaminated groundwater will vary depending on the disposal requirements specific to the type of contamination, and the disposal contractor’s schedules. The contractor shall maintain containerized contaminated groundwater on site until such time as Dover AFB can arrange for disposal.

Part F. Conformance with Environmental Management Systems

1.0 The Contractor shall perform work under this contract consistent with relevant policy and objectives identified in the Dover AFB environmental management system (EMS) applicable for this contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the Dover AFB EMS and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals.

2.0 To ensure all appropriate environmental goals are obtained, the contractor shall ensure the environmental requirements outlined in this contract to include, but not limited to sediment and erosion control permitting (when applicable), approval and reporting usage pertaining to hazardous materials and any spill reporting/clean-up requirements resulting from the associated usage or storage of those hazardous materials, affirmative procurement process, air permitting requirements as applicable (including construction and operating permits) , wetlands permitting requirements as applicable and disposal of hazardous and universal waste are implemented and successfully managed.

3.0 In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the Contracting Officer.

4.0 The prime contractor will receive necessary EMS training from Dover AFB personnel during the pre-construction / post award meeting. The prime contractor is responsible to ensure all impacted employees and associated sub-contractors receive necessary training.

Part G. Air Permitting

1.0. State of Delaware regulations pertaining to air pollution require the permitting of permanent placed equipment prior to installation. The following items require a construction permit prior to equipment being placed on the construction site.

1.1 Emergency generators with capacity greater than 450 kilowatts.

1.2 Boilers supplied by Natural Gas, LP gas, or other desulfurized fuel gas and have a rated heat input of less than 15 million British-Thermal Units (BTUs) per hour.

1.3 Boilers utilizing any petroleum based fuel with a rated heat input of less than 10 million British-Thermal Units (BTUs) per hour.

1.4. Project specific equipment identified in the construction documents.

2.0. For the permanent items identified in the previous section, Dover AFB will submit the permit application. The contractor shall submit all associated data to the Government including product manufacturer, model and serial number of equipment, etc so application can be processed by Dover AFB. Equipment cannot be placed on the construction site prior to receipt of a construction permit.

3.0. Upon receipt of construction permit, the contractor is authorized to initiate permanent connections of equipment in accordance with associated permit requirements. Once equipment is capable of functioning, the permit must be transferred from a construction permit to an operational permit. Dover AFB will facilitate the transfer process, which requires a site visit by the regulators to verify operational status.

4.0 State of Delaware regulations governing air pollution also require permitting for construction specific equipment not permanent to the site after completion of project. Contractor is required to comply and obtain all associated permits through DNREC providing a copy of permit to Dover AFB. Examples of such permits include temporary concrete batch plants and concrete crushers.