C1_-_CNATT_MAS.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- CNATT Simulator Room AC Replacement Federal contract opportunity
- Solicitation number
- FA448419RA031
About this file
Material Submittal Listing
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CNATT_Q&A.pdf | ||
| Solicitation_-_FA448419RA031_0003.pdf | ||
| CNATT_SOW_v3.docx | DOCX document | |
| Solicitation_-_FA448419RA031_0002.pdf | ||
| CNATT_SOW_v2.docx | DOCX document | |
| Solicitation_-_FA448419RA031_0001.pdf | ||
| J-5_JB-MDL_Past_Performance_Questionnaire_v2.pdf | ||
| C1_-_CNATT_SOW.docx | DOCX document | |
| J-4_JB-MDL_Medical_Statement.pdf | ||
| J-2_JB-MDL_SFS_Appendix.PDF | ||
| J-1_JB-MDL_WD_OC_NJ190039_20190517.pdf | ||
| J-3_JB-MDL_AntiterrorismStatement.pdf | ||
| Solicitation_-_FA448419RA031.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 SCHEDULE OF MATERIAL SUBMITTALS Building 1 air conditioning system SOLICITATION/CONTRACT NUMBER
| TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required) | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN
CONTRACTING DATE TO
CIVIL
ENGINEERS RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
| NOTIFIED | CONTRACTOR | ||||||||||
| RESUBMITTAL | FINAL | ||||||||||
| APPROVAL | REMARKS | ||||||||||
| APPROVED | DISAPPROVED | ||||||||||
| 1 | Air condioning system with controls | X | x | x | x | X | X | WITH BID DOCS |
| SCHEDULE OF MATERIAL SUBMITTALS | ||
| TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required) | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN
CONTRACTING DATE TO
CIVIL
ENGINEERS RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||
| RESUBMITTAL | FINAL | |||
| APPROVAL | REMARKS | |||
| APPROVED | DISAPPROVED |
Sheet2
Sheet3
File details come from the government source that posted it.