REQUIRMENTS

OPTIMIZATION (R&O)

R&O

CONFERENCE

R&O

CHIEF

R&O

BREAKROOM

COMM SERVER ROOM

MENS

RESTROOM

WOMENS

RESTROOM

STORAGE

ROOM

EMCS

SUPERVISOR

OFFICE

EMCS

CONTROL

ROOM

R & O

BUILDER

SURVEY TEAM

OFFICE

( CARPET )

( CARPET )

( CARPET )

( CARPET )

( CARPET )

( CARPET )

( LVT )

( LEAVE AS-IS ) ( LEAVE AS-IS )

( LEAVE AS-IS )

( LEAVE AS-IS )

( CARPET )

( CARPET )

( CARPET )

( CARPET )

MECHANICAL ROOM

( LEAVE AS-IS )( LVT )

SERVICE CONTRACTS

SUPERVISOR

OFFICE

SUPERINTENDENT

OFFICE

FLIGHT

SUPERINTENDENT

OFFICE

STORAGE ROOM

SERVICE CONTRACTS

SECTION

PROJECT EXECUTION

OFFICE

HEAVY REPAIR

SUPERINTENDENT

OFFICE

ELECTRICAL

SUPERINTENDENT

OFFICE

STORAGE

ROOM

MENS

RESTROOM

LADIES

RESTROOM

OPERATIONS FLIGHT

CONFERENCE

ROOM

DEPUTY FLIGHT CHIEF

OFFICE

OPERATIONS FLIGHT

ADMINISTARATIVE

SECTION

FLIGHT CHIEF

OFFICE

( LEAVE AS-IS )

BREAK ROOM

( LVT )

( LEAVE AS-IS )

( LEAVE AS-IS )

( CARPET )

( CARPET )

( CARPET )

( CARPET )

( CARPET )

( CARPET )

( CARPET )

( CARPET )

( C A

R

PE

T

( C A

R

PE

T

( C A

R

PE

T

( C A

R

PE

T

INFRASTRUCTURE

SUPERINTENDENT

OFFICE

( CARPET )

( CARPET )

( CARPET )

( CARPET )

( CARPET )

( CARPET )( LVT )

( LVT )

( LVT )

OFFICE

( CARPET )

OJT ROOM

OFFICE

UTILITY RM

BREAK ROOM

MIXING ROOM

CHEMICAL STORAGE ROOM

OFFICES

WOMEN MEN

SHOWER

108'-1"

18'-5" 6'-7"

1'-9"

6'-5" 4'-3

" 25'-9

" 12'-3

" 32'-6

1 4

1 4

14'-1

" 32'-8

" 16'-5

" 44'-10"

27'-9"

NOT TO SCALE

14APR2014

N

BLDG. 905

PEST MANAGEMENT

AMERICAN COMPLIANCE SERVICES, LTD

554 Morning Glory Drive, Benicia, CA 94510· (707) 745-1137· www.acs-ltd.us

LIMITED ASBESTOS SURVEY

TRAVIS AIR FORCE BASE

Building 878

PREPARED FOR:

Ms. Valentina Langillp

CA 9453560 CES/CEOES

241 V Street, Bldg. 878 Travis AFB, CA 94535

PREPARED BY:

American Compliance Services, LTD 554 Morning Glory Drive Benicia, California 94510

DATE PREPARED:

February 22, 2021

Table of Contents

SECTION I EXECUTIVE SUMMARY

SECTION II SCOPE OF WORK

SECTION III DEFINITIONS

Asbestos

SECTION IV ASBESTOS INSPECTION RESULTS & FINDINGS

Table 1 Asbestos Sample Results

SECTION V METHODS ASBESTOS

SECTION VI NOTICE, PERMITS, AND LICENSES

SECTION VII LIMITATION AND EXCLUSIONS

SECTION VIII TECHNICAL STAFF SIGNATURES

CERTIFICATE OF REPORT

Attachments Sample Location Map(s) Laboratory Results Consultants’ Certification(s)

Limited Asbestos Survey Travis Building 878 Travis Air Force, California Page 1 of 5

SECTION I EXECUTIVE SUMMARY

On February 19, 2021 American Compliance Services, LTD (ACS) conducted a limited asbestos survey in specified areas of Building 878 of material that may be disturbed during carpet replacement, at Travis Air Force Base, in Travis, California. Sofia and David Kummer, Certified Site Surveillance Technicians (CSST) conducted the survey.

SECTION II SCOPE OF WORK

The purpose of this survey was to test the carpet, base cove and drywall for asbestos prior to removal of the carpet. Should the final construction plans change and require penetration into materials not included in this report, additional sampling and analysis will be required at this site.

SECTION III DEFINITIONS

Asbestos

A material is considered by the EPA and the State of California to be an Asbestos Containing Material (ACM) if at least one sample collected from the homogeneous area shows asbestos present in an amount greater than one percent (>1%) https://www.dir.ca.gov/title8/ch3_2sb2a2_5.html. California Code of Regulations (CCR) 1529 defines Asbestos Containing Construction Material (ACCM) as materials containing greater than one-tenth of one-percent (0.1) asbestos by weight. Under 1529 CCR, materials containing between 0.1 % and 1 % asbestos are still regulated as “other” operations by this standard. The ACCM designation is applicable only to reporting (user registration, temporary worksite notification, and incident reporting). https://www.dir.ca.gov/title8/1529.html

The removal or disturbance of 100 square feet or more of ACM or ACCM must be performed by a contractor certified by the California Contractor's State License Board to conduct asbestos-related work and/or an employer/contractor registered with the California Division of Occupational Safety and Health (DOSH) to perform asbestos-related work.

OSHA CLASSIFICATIONS

"Class I asbestos work" means activities involving the removal of TSI and surfacing ACM and

PACM.

"Class II asbestos work" means activities involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics.

"Class III asbestos work" means repair and maintenance operations, where "ACM", including TSI and surfacing ACM and PACM, is likely to be disturbed.

“Class IV asbestos work” means maintenance and custodial activities during which employees contact but do not disturb ACM or PACM and activities to clean up dust, waste and debris resulting from Class I, II, and III activities.

“Disturbance” means activities that disrupt the matrix of ACM or PACM, crumble or pulverize ACM or PACM, or generate visible debris from ACM or PACM. Disturbance includes cutting away small amounts of ACM and PACM, no greater than the amount which can be contained in one

Travis Air Force, California Page 2 of 5 standard sized glove bag or waste bag in order to access a building component. In no event shall the amount of ACM or PACM so disturbed exceed that which can be contained in one glove bag or waste bag which shall not exceed 60 inches in length and width.

NESHAP CATEGORIES

Friable Materials (RACM) NESHAP defines a friable ACM as any material containing more than one percent asbestos that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

Category I Non-friable NESHAP defines a Category I non-friable ACM as packing, gaskets, resilient floor covering (except sheet flooring products which are considered friable), and asphalt roofing products which contain more than one percent asbestos.

Category II Non-friable NESHAP defines a Category II non-friable ACM as any material, except for a Category I non-friable ACM, which contains more than one- percent asbestos and cannot be reduced to a powder by hand pressure when dry.

SECTION IV ASBESTOS INSPECTION RESULTS & FINDINGS

Twelve (12) asbestos samples were collected for laboratory analysis. EPA guidelines were used to determine the sampling protocol. Asbestos was detected in the carpet mastic. The results are summarized in the table below:

Table 1 Asbestos Sample Results

Sample Number

Material Description

Sample Location/

Homogene ous Area

NESHAP /

OSHA

Categories % Asbestos

Estimated Quantity

878-01-1 878-01-2 878-01-3 878-01-4 878-01-5

Texture Drywall

Area 1-7 and Hall

NA

Drywall: ND Joint Compound: ND

Paint: ND Texture/Tape: ND

NA

878-02-6 878-02-7 878-02-8

Purple Base Cove

Area 1-7 and Hall

NA

Base Cove: ND Glue (Tan): ND

NA

878-03-9 878-03-10 878-03-11

Purple/ Blue Carpet/ Mastic Area 1-7 and Hall

CAT I NF

Class II

Carpet: ND Backing: ND

Mastic (Yellow): ND Mastic (Yellow/ Black): 5% CH

Compound: ND

2,604 SF

878-04-12

Black Carpet/ Mastic

NA: Asbestos classification and estimated quantities are not applicable for non-asbestos containing material; ND: Non- Detect; CH Chrysotile asbestos Type; SF: Square Feet.

The contractor must obtain all building and special permits required for the asbestos abatement work when removing 100 square or linear feet of asbestos containing material (≥0.1 %), or greater, the work must be performed by an entity that holds a current, valid asbestos handling license issued by the State Contractor’s licensing Board (SCLB) and a current valid Certificate of Registration for Asbestos-Related Work issued by the California Department of Industrial Relations-Division of Occupational Safety and Health (DOSH), unless otherwise specified.

Travis Air Force, California Page 3 of 5

SECTION V METHODS ASBESTOS

Asbestos Inspection and sampling procedures were performed in general accordance with the guidelines published by the Environmental Protection Agency (EPA) in 40 CFR Part 763 Subpart E, October 30, 1987. https://www.law.cornell.edu/cfr/text/40/part-763/subpart-E The survey consisted of three major activities: visual inspection and physical assessment, sampling, and quantification of building materials.

QUANTIFICATION

Quantities of accessible and/or exposed building materials that were confirmed to contain asbestos were estimated using field measurements and available drawings. Quantities are not applicable for non-asbestos containing material.

ASBESTOS BULK SAMPLE ANALYSIS

Micro Analytical Laboratory in Emeryville, California performed the Asbestos analysis. A chain-of-custody form submitted with the bulk samples, documented the possession of the samples from the time they were collected until they were analyzed. The original chain-of-custody accompanied the samples at all times. Custody documentation began at the time the sample was collected and a copy of the chain-of-custody record was retained by each transferor. The laboratory performed the asbestos analysis using the bulk sample for visual observation and slide preparation(s) for microscopic examination and identification. They mounted samples on slides and then analyzed the samples for asbestos (chrysotile, amosite, crocidolite, anthophyllite, and actinolite/tremolite), fibrous non-asbestos constituents (mineral wool, paper, etc.) and non-fibrous constituents. Asbestos was identified by refractive indices, morphology, color, pleochroism, birefringence, extinction characteristics, and signs of elongation. The same characteristics were used to identify the non-asbestos constituents. The microscopist visually estimated relative amounts of each constituent using a stereoscope to determine the volume of each constituent in proportion to the total volume of the sample.

All bulk samples were analyzed by Polarized Light Microscopy (PLM) with dispersion staining as described by the method of the determination of asbestos in bulk insulation, EPA/600/R-93/116, July 1993. This is a standard method of analysis in optical mineralogy and the currently accepted method for the determination of asbestos in bulk samples. A suspect material is immersed in a solution of known refractive index and subjected to illumination by polarized light. The characteristic color displayed enables mineral identification. It should be noted that some ACM might not be accurately identified and/or quantified by PLM. As an example, the original fabrication of vinyl floor tiles routinely involved milling of asbestos fibers to extremely small sizes.

As a result, these fibers may go undetected under the standard polarized light microscopy method. Transmission Electron Microscopy (TEM) is required for a more definitive analysis of these materials.

SECTION VI NOTICE, PERMITS, AND LICENSES

Hazardous materials removed during the abatement activities shall be disposed of in an approved manner complying with all applicable federal, state, and local regulations. The following notices, permits, and licenses are necessary for asbestos abatement work as of the date of this report.

The Contractor is cautioned to verify these requirements as applicable to the final project scope and confirm that no new requirements exist.

Travis Air Force, California Page 4 of 5

LOCAL AIR QUALITY BOARD NOTIFICATION

Written notification is required to the Local Area Air Quality Management District at least 10 days prior to beginning any work on specified quantities of friable, Regulated Asbestos-Containing Materials (RACM) and / prior to working on ACM using mechanical means or methods that will render the material friable.

CAL-OSHA NOTIFICATION

Written notification to the California Occupational Safety and Health Administration (Cal-OSHA) is required by Cal-OSHA Asbestos Regulations (Title 8, Section 341.9) at least 24 hours prior to beginning any work on asbestos-containing materials.

Prior to the abatement, all employees, contractors, or other parties who may be affected by the abatement must be advised of activities pursuant to Cal-OSHA Asbestos and Lead Regulations (Title 8, Section 1529, Subpart K; Section 1532.1).

SECTION VII LIMITATION AND EXCLUSIONS

American Compliance Services, LTD (ACS) warrants that the findings contained herein have been prepared with the level of care and skill exercised by experienced and knowledgeable environmental consultants who are appropriately licensed or otherwise trained to perform asbestos / lead assessments pursuant to OSHA, as well as state and local agencies, as applicable. Our responsibility is limited to correcting any error or omission. No other liability is included or implied. We did not inspect or sample inaccessible areas such as behind walls or within ductwork and did not dismantle any part of the structure to survey inaccessible areas.

Inaccessible is defined as areas of the building that could not be tested (sampled) without destruction of the structure or a portion of the structure.

Information and opinions presented herein apply to the existing and reasonably foreseeable site conditions at the time of our investigation. They cannot necessarily apply to site changes of which this office is unaware and has not had the opportunity to review. Changes in applicable standards may occur as a result of new legislation, or the broadening of knowledge. Accordingly, findings of this report may be invalidated wholly, or in part, by changes beyond our control.

American Compliance Services, LTD ACS), trusts that the information presented herein provides the data you require. Should you have any questions or comments, please contact ACS. This report, and all available supporting documents and drawings used to prepare the report, have been reviewed by the undersigned, the personnel responsible for this project. The signatory affirms that the Asbestos Investigation documented herein was conducted in substantial conformance with applicable procedures documented in 40 CFR Part 763 – Asbestos, Subpart E

– Asbestos Containing Materials in Schools [AHERA, June 24, 1992], and the EPA Guidance Manual “Asbestos Containing Materials in Buildings” (EPA 560/5-85-030a, October, 1985). The investigation by American Compliance Services, LTD, consisted solely of the activities described in this report and is subject to the Exceptions of Assessment, Limitations, and Service Constraints described herein.

Travis Air Force, California Page 5 of 5

SECTION VIII TECHNICAL STAFF SIGNATURES

CERTIFICATE OF REPORT

The following personnel were responsible for this limited asbestos survey. We (I) certify that information contained herein was collected on the dates recorded and the site described in this report.

Wendy Plank Davis, CAC 01-2904 Certified Asbestos Consultant, Expiration Date: 4/4/2022

David Kummer, CSST # 08-4363 Certified Site Surveillance Technician Expiration Date: 6/19/2021

Sofia Corona Kummer, CSST # 16-5684 Certified Site Surveillance Technician Expiration Date: 8/17/2021

SAMPLE LOCATION MAP(S)

Not in scope

Not in scope

Not in scope

Not in scope

Not in scope

Hall

Hall

Area 1

Area 2

Area 3

Area 4

Area 5

Area 6

Area 7

Purple/ Blue Carpet/ Mastic - Mastic (Yellow/ Black): 5% CH Black Carpet/ Mastic - Mastic (Yellow/ Black): 5% CH

Travis Air Force Base Building 878

878-01-1 878-02-6 878-03-9

878-01-2 878-02-7

878-03-10 878-04-12

878-01-3 878-02-8 878-03-11

878-01-4

878-01-5

LABORATORY RESULTS

CONSULTANTS’ CERTIFICATION(S)

Bldg 237-2 FP.pdf
380_2.pdf
877 - Flooring Replacement.pdf
878 - Flooring Replacement.pdf
Bldg905-1
Sheets and Views
Bldg905-1-905

Travis survey building 878.pdf

File details come from the government source that posted it. Updated .